Nym
Established Member
Leigh Railway Station
Here
The line would run from Leigh to Tyldsey and then on to Walkden where it would connect with a new trackbed onto the Wigan - Atherton - Walkden - Victoria line, none of this nonsense of a railway station 2 miles south of Leigh where it would be easyer and more practical to have a parkway railway station where the Atherliegh route used to meet the Chat Moss route with a large car park, between Newton and Paitcroft
New station in Leigh T/C to have 2tph into Manchester Victoria, falling to 1tph evenings & sundays.
Salford Crescent
I know theres a lot of discussion as to what to do here, I think the station should be re-located further north with 6 platforms, long enough for 8 or 9 x 23m. In conjunction with the Leigh line and some other improvments, it would be nessesarry.
Salford Central
Bring Platforms 3 and 4 back into use and 4 track all the way from Victoria to Salford Crescent (yes there is still space), with services running to Bolton tending to use 1/2 and Walkden & Eccles 3/4, not building new platforms but laying track to have a junction to the West of the station to connect to the Chat Moss line, or, have 6 platforms with two new ones for the chat moss route.
Manchester Victoria
Nothing much can be done here with the through platforms, perhaps wideing the space between platforms and adding a centre track to allow the platforms to be doubled up.
Some more terminating platforms from the east would be nice through, so that the through platforms only need to be used from the west, with all of these extened through Victoria to Rochdale, Stalybridge or Ashburys. With linespeed increases east of Victoria some services could be diverted into Victoria feeing space up at Piccadilly.
Ashburys to Guide Bridge
4 Track, end of....
Slade Lane Jcn to Piccadilly
6 Track possibly with a flying junction at Slade Lane
Piccadilly throught
8/10 track.
Re-opening of Mayfeild Goods to passengers
Flyover from East Manchester lines into Mayfeild.
Two more new through platforms.
More platforms on the east of the station, in what is currently the car park.
This would add another 9 to 11 platforms, giving plenty of platforms space for the increased throught capacity.
Oxford Road
Difficult due to the number of buildings around it, but I'd say, restore platform 6 and change the layout of the junctions to make less conflicts, it should be possible to extend platforms 1 and 4 to 8 car length, and 2/3 to 6 car length, but would mean a lot of construction, looks like we're stuck with 6 car platforms as a maximum here, without being insane and 4 tracking the whole way from Castlefeild Jcn to Piccadilly, this wouldn't be nessesarry is the next silly idea is done and Victoria is done properly.
Altringham & Manchetser Central
Right...
The line to Altrigham should NOT be light rail, it can be counted in many ways as a missing link in the Network Rail inferstructure. When the metrolink extentions are completed it would mean running a rediculous numer of trams per hour through Deansgate-Castlefeild.
Before somone starts to say this is a stupid idea, read the whole thing...
Return the Altham line to heavy rail and energise the overhead wires to 25kV to keep place with current standards. Theres then two options for the junctioning.
1: Move the Metrolink away from Trafford Bar, junction it after Panoma docks and run on a bridge over Bridgewater way and through a couple of the car parks to meet with the 'Didsbury & Airport' line, passing over the Altham line, possibly retaining some platforms near Trafford Bar dependant on the route taken.
This would see 6 platforms at Cornbrook, two on the Metrolink lines, two on the 'Central' Lines, and two on the CLC lines. Crossover junctions allowing CLC services to use central and Altham services to use Ox Road (if desired)
This would mean raising the Metrolink lines up on a viaduct to clear the CLC & Central heavy lines. (On a side note I'd like to see space left for 2 track heavy all the way from Trafford Bar to Hazel Grove, nice diversionary route and potential passenger service, calling at Cornbrook, East Didsbury (Metrolink Interchange), Cheadle Heath, Hazel Grove South, and continuing possibly to Sheffeild or Buxton (take smaller services off the Stockport Viaduct) )
2: Dependant on Trafford Bar Tunnel (I don't know the width, sorry...)
Run the metrolink and heavy rail through this tunnel with grade seperated junctions at Cornbrook.
Into Manchester Central (money or CPO will buy it back, stop saying that an exibition centre is more important!)
The route is ovious over the old viaduct into Central, this would potentially be accepting 4tph stoppers, 4tph express (2 continuing to Chester, 2 continuing to Crewe via Sandbach), 2tph Chinley / Hazel Grove / Buxton. 2tph CLC Stopper, sounds like enough to justify 6 platforms to me, not to mention the possiblity of diverting intercity services (from Crewe / London etc) into Central to release pressure on Piccadilly, in conjunction with Victoria improvments, to allow HS2 to get into the Piccadilly Campus
and on that topic, getting tired to typing now, so this will be the last even through the list is far from exhaustive...
HS2 at Manchester
The line should come into Piccadilly, end of, there isn't anywhere else it could go, services to the North wouldn't run 'via Manchester' but 'via Manchester South Parkway, that would have a double delta junction so that services can run either...
Manchester Picc - South (Fast) (Possibly)
Manchester Picc - South (Via Parkway)
North - South (Via Parkway)
Manchester Picc - North (Via Parkway)
HS2 would then re-join the WCML south of Wigan near the Chat Moss Junction, with a conflict free flying junction space provided to continue north to the east of Wigan, and a connection to the Chat Moss for Liverpool L St.
I think I did a diagram before...
OK, I'll finish ranting now...
Here
The line would run from Leigh to Tyldsey and then on to Walkden where it would connect with a new trackbed onto the Wigan - Atherton - Walkden - Victoria line, none of this nonsense of a railway station 2 miles south of Leigh where it would be easyer and more practical to have a parkway railway station where the Atherliegh route used to meet the Chat Moss route with a large car park, between Newton and Paitcroft
New station in Leigh T/C to have 2tph into Manchester Victoria, falling to 1tph evenings & sundays.
Salford Crescent
I know theres a lot of discussion as to what to do here, I think the station should be re-located further north with 6 platforms, long enough for 8 or 9 x 23m. In conjunction with the Leigh line and some other improvments, it would be nessesarry.
Salford Central
Bring Platforms 3 and 4 back into use and 4 track all the way from Victoria to Salford Crescent (yes there is still space), with services running to Bolton tending to use 1/2 and Walkden & Eccles 3/4, not building new platforms but laying track to have a junction to the West of the station to connect to the Chat Moss line, or, have 6 platforms with two new ones for the chat moss route.
Manchester Victoria
Nothing much can be done here with the through platforms, perhaps wideing the space between platforms and adding a centre track to allow the platforms to be doubled up.
Some more terminating platforms from the east would be nice through, so that the through platforms only need to be used from the west, with all of these extened through Victoria to Rochdale, Stalybridge or Ashburys. With linespeed increases east of Victoria some services could be diverted into Victoria feeing space up at Piccadilly.
Ashburys to Guide Bridge
4 Track, end of....
Slade Lane Jcn to Piccadilly
6 Track possibly with a flying junction at Slade Lane
Piccadilly throught
8/10 track.
Re-opening of Mayfeild Goods to passengers
Flyover from East Manchester lines into Mayfeild.
Two more new through platforms.
More platforms on the east of the station, in what is currently the car park.
This would add another 9 to 11 platforms, giving plenty of platforms space for the increased throught capacity.
Oxford Road
Difficult due to the number of buildings around it, but I'd say, restore platform 6 and change the layout of the junctions to make less conflicts, it should be possible to extend platforms 1 and 4 to 8 car length, and 2/3 to 6 car length, but would mean a lot of construction, looks like we're stuck with 6 car platforms as a maximum here, without being insane and 4 tracking the whole way from Castlefeild Jcn to Piccadilly, this wouldn't be nessesarry is the next silly idea is done and Victoria is done properly.
Altringham & Manchetser Central
Right...
The line to Altrigham should NOT be light rail, it can be counted in many ways as a missing link in the Network Rail inferstructure. When the metrolink extentions are completed it would mean running a rediculous numer of trams per hour through Deansgate-Castlefeild.
Before somone starts to say this is a stupid idea, read the whole thing...
Return the Altham line to heavy rail and energise the overhead wires to 25kV to keep place with current standards. Theres then two options for the junctioning.
1: Move the Metrolink away from Trafford Bar, junction it after Panoma docks and run on a bridge over Bridgewater way and through a couple of the car parks to meet with the 'Didsbury & Airport' line, passing over the Altham line, possibly retaining some platforms near Trafford Bar dependant on the route taken.
This would see 6 platforms at Cornbrook, two on the Metrolink lines, two on the 'Central' Lines, and two on the CLC lines. Crossover junctions allowing CLC services to use central and Altham services to use Ox Road (if desired)
This would mean raising the Metrolink lines up on a viaduct to clear the CLC & Central heavy lines. (On a side note I'd like to see space left for 2 track heavy all the way from Trafford Bar to Hazel Grove, nice diversionary route and potential passenger service, calling at Cornbrook, East Didsbury (Metrolink Interchange), Cheadle Heath, Hazel Grove South, and continuing possibly to Sheffeild or Buxton (take smaller services off the Stockport Viaduct) )
2: Dependant on Trafford Bar Tunnel (I don't know the width, sorry...)
Run the metrolink and heavy rail through this tunnel with grade seperated junctions at Cornbrook.
Into Manchester Central (money or CPO will buy it back, stop saying that an exibition centre is more important!)
The route is ovious over the old viaduct into Central, this would potentially be accepting 4tph stoppers, 4tph express (2 continuing to Chester, 2 continuing to Crewe via Sandbach), 2tph Chinley / Hazel Grove / Buxton. 2tph CLC Stopper, sounds like enough to justify 6 platforms to me, not to mention the possiblity of diverting intercity services (from Crewe / London etc) into Central to release pressure on Piccadilly, in conjunction with Victoria improvments, to allow HS2 to get into the Piccadilly Campus
and on that topic, getting tired to typing now, so this will be the last even through the list is far from exhaustive...
HS2 at Manchester
The line should come into Piccadilly, end of, there isn't anywhere else it could go, services to the North wouldn't run 'via Manchester' but 'via Manchester South Parkway, that would have a double delta junction so that services can run either...
Manchester Picc - South (Fast) (Possibly)
Manchester Picc - South (Via Parkway)
North - South (Via Parkway)
Manchester Picc - North (Via Parkway)
HS2 would then re-join the WCML south of Wigan near the Chat Moss Junction, with a conflict free flying junction space provided to continue north to the east of Wigan, and a connection to the Chat Moss for Liverpool L St.
I think I did a diagram before...
OK, I'll finish ranting now...