387 Introduction through Reading will require a massive upheaval of diagrams - presently stoppers from Oxford form Stoppers to Reading and vice versa at Paddington. It will render a large quantity of 16x stock redundant before sufficient driver training and infrastructure works are completed in the West Country. It will require many more LTV drivers to be 387 trained than are presently.

We'll stick with January next year.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

jyte

Member
Joined
27 Oct 2016
Messages
671
Location
in me shed
A few questions:

1) Is NR still aiming to energise Maidenhead-Reading on the 16th-17th ?

2) How likely is that considering Hayes-Maidenhead slipped quite a bit?

3) How much electric 387 testing will there be before 387s start taking over services at the beginning of the year?

4) Will IETs use the wires after they go up or will they be on diesel till January?
 

3973EXL

Established Member
Joined
2 Feb 2017
Messages
2,741
Had a trip on the B&H today to check on progress.

After Southcote Junction masts start after MP38 1/4 and stop before the M4 bridge. There is then a gap to just before Theale.

There are no masts through any of the stations.

Mast start again after Theale station until the start of Ufton loop. There is then a gap to just before Aldermaston station.

After Aldermaston there are mast all the way through to just west of Newbury Racecourse. As already mentioned, there are no masts through stations, and some individual mast missing, or laying track side.

Between Thatcham and Racecourse there are registration arms on a lot of the masts.

Nothing up at Newbury and still prep work on the site for the new footbridge.

Two working ex Swindon Mon to Thurs night this week.

Some Photos, Theale, Aldermaston, Midgham and Thatcham.
 

Attachments

  • DSC00063.JPG
    DSC00063.JPG
    206.3 KB · Views: 118
  • DSC00064.JPG
    DSC00064.JPG
    197.8 KB · Views: 109
  • DSC00065.JPG
    DSC00065.JPG
    267.9 KB · Views: 121
  • DSC00061.JPG
    DSC00061.JPG
    239.5 KB · Views: 108
  • DSC00062.JPG
    DSC00062.JPG
    202.7 KB · Views: 105
  • DSC00055.JPG
    DSC00055.JPG
    228.3 KB · Views: 104
  • DSC00056.JPG
    DSC00056.JPG
    190.4 KB · Views: 102
  • DSC00053.JPG
    DSC00053.JPG
    222.7 KB · Views: 109
  • DSC00054.JPG
    DSC00054.JPG
    195.9 KB · Views: 109

3973EXL

Established Member
Joined
2 Feb 2017
Messages
2,741
Newbury Town & Racecourse stations today.
 

Attachments

  • DSC00049.JPG
    DSC00049.JPG
    163.5 KB · Views: 112
  • DSC00050.JPG
    DSC00050.JPG
    175.8 KB · Views: 111
  • DSC00051.JPG
    DSC00051.JPG
    206.4 KB · Views: 102
  • DSC00052.JPG
    DSC00052.JPG
    181.7 KB · Views: 104
  • DSC00057.JPG
    DSC00057.JPG
    168.3 KB · Views: 106
  • DSC00058.JPG
    DSC00058.JPG
    188.3 KB · Views: 94

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
Had a trip on the B&H today to check on progress.

After Southcote Junction masts start after MP38 1/4 and stop before the M4 bridge. There is then a gap to just before Theale.

There are no masts through any of the stations.

Mast start again after Theale station until the start of Ufton loop. There is then a gap to just before Aldermaston station.

After Aldermaston there are mast all the way through to just west of Newbury Racecourse. As already mentioned, there are no masts through stations, and some individual mast missing, or laying track side.

Between Thatcham and Racecourse there are registration arms on a lot of the masts.

Nothing up at Newbury and still prep work on the site for the new footbridge.

Two working ex Swindon Mon to Thurs night this week.

Some Photos, Theale, Aldermaston, Midgham and Thatcham.

Great stuff. If you had to give an 'eyeball' completion percentage, what would be your stab at it?
 

Thatcham Xing

Member
Joined
1 Nov 2016
Messages
173
If you had to give an 'eyeball' completion percentage, what would be your stab at it?

I'm a local and was out observing progress over the weekend - I'd say 75%. As mentioned above, there are still some quite big gaps, and the only SPS I've observed is between Thatcham and Newbury Racecourse.

Recently, some uprights have gone up immediately east of the platforms at Thatcham, in the area I would have expected to be taken up the expected platform extensions (they can't be extended at the other end due to the level crossing - although we'd all like to get rid of it!).

You'd think the through lines at Newbury would be wired, so that non-stop IET's can transition from the wires to diesel as they pass through, but who knows?
 
Last edited:

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
There presumably has to be some wiring on the down through line (which may or may not be its official name - I don't have the relevant Quail) to allow for down electric trains routed onto it by mistake, so that they don't cause a dewirement by coming off the wire obliquely. Given that that will be done, it makes little sense not to wire all four lines for the full length of the station.
 
Last edited:

Thatcham Xing

Member
Joined
1 Nov 2016
Messages
173
Speculating, but maybe the wires will continue slightly past the bridge to the west of the Station, to allow reversal/platform changes for EMU's that terminate at Newbury? Otherwise you'll have up/starting trains departing from the down platform etc. The likes of an 8-coach 387 won't fit in the bay platform.
 

Unclepete

Member
Joined
18 Oct 2011
Messages
76
Location
Newbury
Speculating, but maybe the wires will continue slightly past the bridge to the west of the Station, to allow reversal/platform changes for EMU's that terminate at Newbury? Otherwise you'll have up/starting trains departing from the down platform etc. The likes of an 8-coach 387 won't fit in the bay platform.

Hi, that's an interesting thought, although the down platform 1 has been re-signalled as bi-directional recently with a new starter signal at the London end.

Also, I've noticed that on the West Berks section of NR's GW upgrade, they are now detailing works for clearance/piling on the Mortimer-Bramley section. Interesting!
https://www.networkrail.co.uk/runni...estern/great-western-mainline/west-berkshire/
 

nlogax

Established Member
Joined
29 May 2011
Messages
6,007
Location
Mostly Glasgow-ish. Mostly.
Hi, that's an interesting thought, although the down platform 1 has been re-signalled as bi-directional recently with a new starter signal at the London end.

Also, I've noticed that on the West Berks section of NR's GW upgrade, they are now detailing works for clearance/piling on the Mortimer-Bramley section. Interesting!

Electric Spine..it lives!

Ok, maybe not, but that's a curious development.
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,274
Hi, that's an interesting thought, although the down platform 1 has been re-signalled as bi-directional recently with a new starter signal at the London end.

Also, I've noticed that on the West Berks section of NR's GW upgrade, they are now detailing works for clearance/piling on the Mortimer-Bramley section. Interesting!
https://www.networkrail.co.uk/runni...estern/great-western-mainline/west-berkshire/

Suspect it may just be vegetation clearance they are referring to there - it is scheduled for 8am to 4.30pm, so won't be anything to do with piling at that time of the day.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Wrong !. Electification of Temple Meads will be sometime in CP6 although a revised completion date has not yet been announced.
What is your source for this information?

As far as I know the most recent official statement was last November when electrification of both approaches to Bristol TM was "deferred", along with Didcot to Oxford and the two Thames branches. No official statement was made that any of these will happen in CP6. Other posters have emphasized that there are not yet any committed enhancements in CP6.

I think TM will happen in CP6 but unless you have new or inside information I don't think you should be so definite.
 
Last edited:

jyte

Member
Joined
27 Oct 2016
Messages
671
Location
in me shed
My understanding was that the projects deferred from CP5 to CP6 will have to compete against other new projects for funding and will have their cost:benefit ratio recalculated - they're not guaranteed to even happen in CP6 and maybe not even in CP7.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,597
Location
Nottingham
The CP6 funding appears to be just maintenance and renewals, and enhancements will be funded separately by a process that doesn't run in five-year cycles, so a project can be approved any time. In principle that's probably a good idea but it does give politicians a few more options for spin and obfuscation.
 

leomartin125

Member
Joined
15 Nov 2015
Messages
1,058
Location
North West
What is your source for this information?

As far as I know the most recent official statement was last November when electrification of both approaches to Bristol TM was "deferred", along with Didcot to Oxford and the two Thames branches. No official statement was made that any of these will happen in CP6. Other posters have emphasized that there are not yet any committed enhancements in CP6.

I think TM will happen in CP6 but unless you have new or inside information I don't think you should be so definite.

In all honesty, if you thought electrifying Reading was bad with it's 15 or so platforms, it will be nothing compared to the sheer amount of money needed to put Series 1 up in BTM, with its ancient building structure, it will need a lot of work to the station canopy and the platforms themselves before NR can even think about getting masts near the station, let alone wires. If there is a budget for it, it may occur in CP6. Though the Government seems to believes bi-modes will do the trick, and with the investment in HS2, it will take a lot to see electrification through to BTM now in my opinion.
 
Last edited:

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,229
In all honesty, if you thought electrifying Reading was bad with it's 15 or so platforms, it will be nothing compared to the sheer amount of money needed to put Series 1 up in BTM, with its ancient building structure, it will need a lot of work to the station canopy and the platforms themselves before NR can even think about getting masts near the station, let alone wires. If there is a budget for it, it may occur in CP6. Though the Government seems to believes bi-modes will do the trick, and with the investment in HS2, it will take a lot to see electrification through to BTM now in my opinion.

They don't need to use full series one within a listed trainshed where all trains stop. Paddington recently completed platforms are another example. Indeed there are a number of Grade 1 listed trainsheds around the country with existing wiring installations which are fairly unobtrusive, I don't see this as a major issue.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,597
Location
Nottingham
Haven't the platforms been done already to give acceptable stepping distances for 80x units? This is essentially independent of the future re-modelling and re-signalling, which mainly affects the trackwork either end. I wouldn't expect to see any further changes to platforms or the tracks alongside them with electrification, although I agree the canopies may need modification.
 

Southsider

Member
Joined
10 Aug 2015
Messages
937
They don't need to use full series one within a listed trainshed where all trains stop. Paddington recently completed platforms are another example. Indeed there are a number of Grade 1 listed trainsheds around the country with existing wiring installations which are fairly unobtrusive, I don't see this as a major issue.

Glasgow Queen Street has been done with head spans. Relatively unobtrusive and fine for low speed.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,898
Location
Mold, Clwyd

spark001uk

Established Member
Joined
20 Aug 2010
Messages
2,385
May be associated with the "Bramley Grid Feeder Station" which is part of the GW scheme.
I think that means they will need a lineside cable route to Southcote Jn, but no OHLE on the Basingstoke line itself.

Interesting thought, but the publication clearly says "We're undertaking piling work in the areas shown below", and Mortimer - Bramley is listed. Would they need to pile just for a lineside cable?
 
Last edited:

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,229
Interesting thought, but the publication clearly says "We're undertaking piling work in the areas shown below", and Mortimer - Bramley is listed. Would they need to pile just for a lineside cable?

Yes if it was to be built as an "along track bare feeder", they'd have to mount it on normal masts at the necessary safe height. A bit ike an ATF conductor. It would probably end up looking like a single track cantilever installation, but without the horizontal arm etc.
 

spark001uk

Established Member
Joined
20 Aug 2010
Messages
2,385
Seems a fair way out to come for some more juice. I thought they were building a feeder at Reading at some point? Or are they just sticking to Didcot being the next one down?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,229
Seems a fair way out to come for some more juice. I thought they were building a feeder at Reading at some point? Or are they just sticking to Didcot being the next one down?

This would be the Reading independent feeder. It has to come from a grid supply point, and that is near Bramley. Or Didcot.

It is project W001c in the Jun 17 CP5 NR enhancements plan- and its title is Reading Independent Feeder (Bramley) Grip 3 April 2017 for completion during CP6.
 

spark001uk

Established Member
Joined
20 Aug 2010
Messages
2,385
Shame they're not wiring down there, even if only to B'stoke, it would certainly have opened up the opportunity of using 92's to their full potential on the route.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,229
Shame they're not wiring down there, even if only to B'stoke, it would certainly have opened up the opportunity of using 92's to their full potential on the route.

One of the reasons for proposing OHLE from Basingstoke to Southampton was that the existing DC supply system cannot provide enough power for the Class 92s on top of the existing EMU demands. There are also various competing demands for additional EMU paths in the route study in the medium term.

I'd be very surprised to see 92s running on the third rail in the area, whatever happens to the Reading - Basingstoke section...
 

MarlowDonkey

Established Member
Joined
4 Apr 2013
Messages
1,825
Not infrastructure, but the Turbo fleet has a new announcement about the dangers of overhead wiring. It only plays at stations from Hayes/West Drayton west. Presumably everyone is deemed to be aware of the dangers of the Paddington to Heathrow wiring and not poking fishing rods at it etc.
 