Further to my earlier reply to Jyte, I've read that the weekend of 16th/17th September is the planned date for energising the Maidenhead-Tilehurst section with Didcot-Wootton Bassett following in May/June 2018 (better sort out the bridge at Steventon High St pretty quick then!!)
Lots of work going on this weekend as NR contractors take advantage of the block between Didcot and Swindon. At Challow the up main, relief and down main are now wired from east of the A417 bridge through to Denchworth (and probably west of Wantage Road, though I haven't checked).
The attached file shows the view west from the A417 bridge this morning, with a RRV on the down relief loop and you can just make out the HOPS train in the distance working on the up main. It looks like they are wiring up the junctions to link up with the previously wired section which runs from behind the HOPS train through to Baulking.
Lots of work going on this weekend as NR contractors take advantage of the block between Didcot and Swindon. At Challow the up main, relief and down main are now wired from east of the A417 bridge through to Denchworth (and probably west of Wantage Road, though I haven't checked).
The attached file shows the view west from the A417 bridge this morning, with a RRV on the down relief loop and you can just make out the HOPS train in the distance working on the up main. It looks like they are wiring up the junctions to link up with the previously wired section which runs from behind the HOPS train through to Baulking.