I have a question that was raised following the 387 thread about the feed in points (national grid connections).
Does the program need all four feed in points (Kensal Green/Didcot/Melksham and Cardiff) to be operational in order to function or could it get away with operating with only 3 or even 2?
I'm presuming if the grid connections at Didcot and Melksham both failed you'd loose electric train services over most of the line.
Does the program need all four feed in points (Kensal Green/Didcot/Melksham and Cardiff) to be operational in order to function or could it get away with operating with only 3 or even 2?
I'm presuming if the grid connections at Didcot and Melksham both failed you'd loose electric train services over most of the line.