There are now 57 masts installed in the Llanwern area and 77 or 78 in the Marshfield area (I think I missed one). This is an increase of 28 and 6/7 respectively compared to a week ago.
Terribly sorry to change the subject a little and equally so for not possibly paying full attention some pages back, but what's the situation with Reading - Basingstoke electrification? I think I'm right in saying that this is now part of Great Western, rather than the now effectively abandoned Electric Spine.
However, I can recall no mention of it in the recent descoping announcements. Is it regarded as:
- Postponed, till some time in CP6 or so
- Dropped, and please don't ask again
- Oops - we forgot to mention this one
- Proceeding (no, really)
Network Rail’s orange army will be out in force over the Christmas period as upgrade work continues in Chippenham ahead of electrification.
Workers will be on the track working through the night on Christmas Eve, Christmas Day and Boxing Day as Network Rail look to install the piles used to support the cables that allow electric trains to run.
The work would ordinarily take several months if carried out over weekends but the Christmas period, when the railway is typically 50% quieter, allows for a substantial amount of work to be carried out in a much shorter space of time.
Ahead of the work Network Rail has worked closely with Wiltshire Council to ensure any disruption is kept to a minimum for those living near the railway.
Tom Boreham, Scheme Project Manager for Network Rail, said: “The period over Christmas when no trains are running is a vital time for us to upgrade the railway. It allows us more working time so we can achieve greater numbers of installed foundations per shift, which means we haven’t got to return to the area over a prolonged period of time. We have contacted all of the residents who live near to the railway to inform them of the work and invite them to our information sessions held in Chippenham in the lead up to Christmas.”
The piling work will take place on Christmas Eve from Bath Road to the B4528 railway bridge, on Christmas Day from Bath Road to Ivy Lane and on Boxing Day from Ladyfield Road to Chippenham station.
People who wish to find out more are invited to attend a community engagement session that is being run by Network Rail. They will take place on the following dates.
Wednesday, 7 December: Town Centre (10am - 5pm)
Saturday, 10 December: Olympiad Leisure Centre (9am - 12noon)
Monday, 12 December: Chippenham Station (7am – 10am and 4pm – 7pm)
Friday, 16 December: Town Centre / Market Day (10am – 5pm)
Monday, 19 December: Chippenham Station (7am – 10am and 4pm – 7pm)
Network Rail will also be contacting those living close to the railway directly ahead of the upgrade work. Passengers are being urged to check before they travel this Christmas by visiting nationalrail.co.uk/Christmas.
In his letter to MPs, Mr Maynard points to First Hull Trains’s decision to spend £60m on ‘bi-mode’ trains which can operate on both diesel and electric power. Mr Maynard said the Azuma trains soon to be brought into service by Virgin Trains would cut journey times to London while Arrival Rail North will introduce “new or refurbished trains” on services connecting Hull to Doncaster and Sheffield. The minister said the promised loan would have been repayable by the Government when the upgrade was complete, making the project “fully publicly funded”. Passengers in areas where electrification work had gone ahead had experienced “months of either complete line closure or mid-week nights and weekend closure”. “He added: “Given the number of passenger benefits already being delivered without electrification, there is almost no further benefit to justify further publicly funded investment and the disruption electrification would bring.”
My bold.What actually happened was that before the point of being able to take a decision on electrification on the Hull line, Hull Trains and TransPennine ordered bi-mode trains that deliver the service improvements without any additional investment in unnecessary infrastructure. That means we can spend more money around the network to improve services. People in Hull should be pleased, because they are about to get smart new trains that will really improve services.
And just as I predicted, and was criticised for predicting, the bi-mode has killed the electrification programme.
And just as I predicted, and was criticised for predicting, the bi-mode has killed the electrification programme.
Not really. The point will come, and I suspect it is not far away, when the government realises (or is forced to do so) that this country is at high risk of failing to meet its commitments to reduce carbon emissions. And there is the growing swell of opinion that diesel-powered road vehicles should be banned from London altogether. Which will soon lead to demands for electrification of the Chiltern lines as well as elimination of the diesel-worked London legs of Uckfield and Waterloo-Basingstoke-Exeter services, not to mention the MML or open access services.
Not really. The point will come, and I suspect it is not far away, when the government realises (or is forced to do so) that this country is at high risk of failing to meet its commitments to reduce carbon emissions.
Will it?And there is the growing swell of opinion that diesel-powered road vehicles should be banned from London altogether. Which will soon lead to demands for electrification of the Chiltern lines
Congratulations - bi-modes allow you to do just that with negligible additional infrastructure spend!as well as elimination of the diesel-worked London legs of Uckfield and Waterloo-Basingstoke-Exeter services, not to mention the MML or open access services.
And just as I predicted, and was criticised for predicting, the bi-mode has killed the electrification programme.
Chiltern Lines are really not that significant in terms of traffic into london - and even though it is the last purely diesel worked main line into the city after the GWML is partially electrified it really hasn't got much potential for further growth and it will remain a rounding error.
The line has experienced massive commuter growth and will continue to do so, as many towns on the route are expected to expand significantly. As a minimum, Chiltern will need to run longer stock, and there aren't large numbers of spare Turbostars around to do this.
The 165s will need replacing in the next 10/15 years too
I would imagine that the potential issue with the Dawlish Warren to Teignmouth sea wall section will have been considered. The Cross Country Voyager trains are prohibited from this section when the waves are breaking over the sea wall, does anyone know if this is likely to be a problem with the Bi Mode IEPs?
It was explicitly mentioned in the IEP contract that the trains had to be able to survive sea waves. Basically every major gripe the industry had about the Voyagers, including the toilet smell, was included in that contract.
Platform 13 at Paddington has now closed, in preparation for further remodelling at Paddington at Christmas.
And just as I predicted, and was criticised for predicting, the bi-mode has killed the electrification programme.
I went past Paddington (on the H&C) line at 2pm this afternoon and the track in platform 14 was being taken up. Does this mean both platforms 13 & 14 are out of use until Christmas?
I wonder if provision has been made on the reliefs, for the proposed station at St.Mellons - between Cardiff & Newport? It would surely be crazy to put in the wires/ masts and then have to alter everything at a later date to accommodate the platforms.
There have been two bits of "Positive" news in the last week about the GWR electrification
http://www.rmweb.co.uk/community/uploads/monthly_12_2016/post-6818-0-40369800-1480874096_thumb.png
http://www.crossrail.co.uk/news/art...ssrail-programme-switched-on-in-thames-valley
There has been a lot said on this thread recently about the deferred sections of the GWR electrification, my opinion is that the deferred sections will go ahead in CP6, for a start a lot has been done on the Chippenham to Bristol section, many bridges have been rebuilt and millions of pounds have been spent on the track lowering through Box Tunnel last summer.
As regards CP6, the outstanding work from CP5 will obviously swallow up a big part of it, that's if they choose to go down that path, no one is committing anything at the moment, let's see what happens next summer when it is announced.
Sorry about my poor grammar before I did the edit, I was half a sleep last night!
Sorry if I'm missing something here, but which part of the crossrail line has now been switched on?
ongratulations - bi-modes allow you to do just that with negligible additional infrastructure spend!
It is almost certain a third rail bi-mode will make an appearance at some point, after all it is far simpler than a 25kV one. We are even potentially getting a dual voltage electrodiesel in the D319 pretty soon.