Seems to me an over pessimistic attitude developing regards electrification particularly from Dave 1987.
I find inconceivable that Bristol and Oxford will not be done at some point, possibly the Branches and Swansea might get kicked into the long grass in favour of other electrification projects, in the case of the branches then to me that only makes sense if you do all of the branches between Paddington and Reading anyway, as for Swansea well it wasn't in the original plan anyway and rolling stock order seemed to reflect that.
As for Bi-modes they probably made sense in the case of the GWR scheme and in this instance they are helping to save the day, but that doesn't mean that every electrification scheme will need or have Bi-mode trains.
The bottom line is electrification is being shafted due to the extreme costs increases and slow delivery rather than specifically by Bi-Mode trains.
I find inconceivable that Bristol and Oxford will not be done at some point, possibly the Branches and Swansea might get kicked into the long grass in favour of other electrification projects, in the case of the branches then to me that only makes sense if you do all of the branches between Paddington and Reading anyway, as for Swansea well it wasn't in the original plan anyway and rolling stock order seemed to reflect that.
As for Bi-modes they probably made sense in the case of the GWR scheme and in this instance they are helping to save the day, but that doesn't mean that every electrification scheme will need or have Bi-mode trains.
The bottom line is electrification is being shafted due to the extreme costs increases and slow delivery rather than specifically by Bi-Mode trains.