And to suggest as some have done on here, that it shows what a disaster renationalisation would be, I would say firstly when in the public sector, BR largely decided how to spend the much less money given to it, and secondly the "deeply innefficient" BR managed to electrify three main lines , plus major third rail extensions, plus suburban electrifications round London, Birmingham, Leeds, Manchester, Liverpool, and Glasgow
Yes, BR did a lot
over the course of a few decades, some of which was built as planned and some of which was watered down to save money (with some stupid penny pinching/ single tracking e.g. a hundred metres of siding at Morpeth would have allowed EMUs to operate a Newcastle Morpeth shuttle).
But much of their experience is as far removed from twenty first century operations as 1960s electrification was to the old Victorian approach (bring in boat loads of Irish Navvies).
The world has moved on. Construction is now much more complicated more expensive more stakeholders more environmental concerns more H&S legislation more appeals and protests not just rail construction but also roads/ buildings etc.
The railway have moved on BR had the luxury of being able to shut down lines for prolonged periods to focus on electrification no such spare capacity nowadays to dump traffic on a parallel route or to close down for weekends.
The Public Sector has moved on not the stable employer where Governments left Civil Servants/ Teachers/ Doctors alone permanent restructure is the order of the day now.
The problems weve had on the GWML have been because a bit of the State (the publically owned Network Rail) and a branch of Government (the DfT) have failed to price/ manage/ budget/ co-ordinate.
Maybe NR should never have agreed to such an ambitious scheme, for that budget.
Maybe NR should have done some more feasibility before signing up to anything (e.g. something as apparently basic as knowing where your cables are, having up to date inventories).
Maybe NR should focus more on the job in hand, and less on regular restructures.
Maybe lots of things could be handled differently. But, realistically, nationalisation wouldnt solve any of the problems weve had here. And please nobody tell me that the answer is get rid of all the Accountants and bring in Proper Railwaymen. Were not on Sodor any more, Toto.
I think that Bi-modes change everything.
This is because end to end electrification becomes uneconomic and instead you electrify the low cost sections, avoid high cost sections and uprate engines to do 125mph.
GWR have already asked that the Devon banks are electrified in isolation.
Bi-modes do not need end to end wires, but they do need wires on high usage sections (London - Swindon), most 125mph sections and on hilly bits.
Suburban electrification is another matter and that rather than IEPs will drive electrification in the Bristol & Oxford areas.
If youll excuse the pseudo-management speak this is potentially a game changer with lots of low hanging fruit now in play
We could remove most diesel fumes from Snow Hill/ Moor Street in Birmingham by electrifying the section of that line that gets a ten minute frequency, without the need to wire all the way to Stratford on Avon etc.
We could focus on short sections out of cities (e.g. Newcastle to Metro Centre) without having to have all of the money to wire the quieter/ rural sections beyond (e.g. Metro Centre to Carlisle).
Maybe focus on air quality in London will mean wiring the Chiltern line from Marylebone as far as the M25 (with a ban on any passengers diesels inside the capital?).
We could avoid difficult long term decisions over tricky infrastructure whilst at least electrifying the busy urban bits where air pollution is more of a problem (e.g. as far as Dalmeny without the need to deal with electrification of The Bridge).
If the WAG ever find the funds to match their grand ambitions, Id expect the line electrified part way up the valleys with no urgency to wire up each individual branch.
The days of the whole electrification budget being swallowed up by one region are over future ambitions could be a hundred miles in one region and a hundred miles in another region.
The idea that if straight electrics were ordered Network Rail would simply just deliver GWML electrification is absurd at best
Agreed though apparently it needs repeating!
I saw nothing to suggest that anything other than straight electrics would be ordered for the MML, yet it was kicked into the long grass, so that resources could be focussed on the GWML if the GWML really was such a soft touch that it was easy to cancel then how come it was kept alive whilst MML and TPE were being paused?
The other problem is that straight electrics wouldnt have worked on the GWML, given the need to keep direct services to Hereford/ Gloucester/ Weston etc.
As above, there is a balance between engineering and operations.... I really don't think the government have made a bad choice in terms of what to 'defer'.
Good summary.
If this means that we get an improved station/ track layout at Oxford and an improved station/ track layout at Bristol then fair enough a pragmatic compromise that still gives us most of the benefits in the short term, but doesnt lock in unsatisfactory track layouts at busy stations especially given that both Bristol and Oxford could see suburban enhancements in the medium term that will require capacity increases (i.e. locking in the platform layout and tracks to the 2016 position may not be satisfactory by 2026).
It could even be that theyre being seen to cancel it now, so that they can come back in a few months and announce it as a new improved scheme (as per TPE where the paused electrification was used as an opportunity to marry it to better alignments).
Worth remembering that Governments have cancelled entire projects before the fact that the chaotic GWML is still going to see wires as far as Cardiff shouldnt be taken for granted.