Shaw S Hunter
Established Member
It's the government who has deferred the electrification and not given any date for completion. Politicians only make announcements like this if there is little PR consequences. If electrification had been crucial to be completed to get the PR for new trains being introduced there is no way they would have delayed/cancelled/deferred any of it. With bi-modes they can delay and cancel projects as much as they want.
You are forgetting that a bi-mode operating on diesel power will have higher direct energy costs than when on electric power. At some point this cost difference will make the argument for electrification overwhelming. What we have now is combination of a number of factors: a relatively low world oil price, uncertainty about short to medium term electricity generating capacity, an apparent inability of Network Rail to control its costs and the usual bugbear of stronger political control over the railways, short-termism. There will come a time when once again the capital outlay required for electrification will be justified by the savings to be made in running costs. But Network Rail will have to get its house in order first.