I've read your posts and replies to many other people on lots of threads on this forum. The tone in which you reply to anyone who disagrees with you on any subject makes me not even want to engage in any kind of conversation with you, which is why I tend to just ignore your replies as I know they will be the same snidy comments as usual. When I said many months ago that bi-modes gave the politicians excuses to delay electrification you amongst others told me that this was rubbish and that electrification would completed as planned. You were wrong. The Class 800 may well turn out to be a very good train, but it's a bloody expensive one. If electrification had been planned better then there probably would have been no need for bi-modes at all, and far far cheaper EMU's could have been ordered. Right now we are stuck with very very expensive trains and an electrification program in disarray. I firmly believe the bi-modes gave them an excuse enable this delay without any worry of losing face with the voting public, so the bi-modes have resulted in them being able announce this delay with little consequence.
--- old post above --- --- new post below ---
When I suggested that bi-modes would give a great excuse for delaying electrification schemes while still give the DFT its PR for introducing brand new trains I was told that I was wrong and electrification would plough along. Turns out they have delayed it.
What conversation? You never engage in 'conversation' with me or anyone else who dares to raise similar issues with you - whether some time ago or in the past couple of days.
You just repeat the same lines over and over again - perhaps in the hope that if they are repeated often enough, people may start to think they are true, like the five or six claims in the past couple of days that bi-modes are the reason for this latest delay - as opposed to the actual issue, which is Network Rail's continued inability to get a handle on this project and get the wires up in a timely and cost-effective manner.
Re discussion back up the thread about Cotswold Line platform extensions, the project is, so far as I understand it, purely aimed at speeding up loading and unloading of trains by allowing use of as many doors as possible. The £13m may look a lot, but the idea is to extend platforms at all the busiest stations along the line, not just the obvious places like Hanborough.
There has been no suggestion so far of any money being allocated towards moving the starting signals at or near platform ends at Moreton-in-Marsh and Evesham, which would be needed to allow 2x5-car operation on the route - and the recent order for extra nine-car 802s suggests that these sets will shoulder the burden in the peaks for a long time to come.
I do not think that this is as bad as it first looks.
Oxford
The station has not been sorted out yet, the fasts & peak services will be bi-mode IEPs and they will have the Chiltern option.
A Didcot to Oxford shuttle is not an issue. The locals trundle down from Oxford down to Didcot, some stop at Radley, which only appears to be used at Peak times, then there is a rare stop at the hamlets of Culham or Appleford before arriving at Didcot where nearly everyone gets off whilst it sits there for 10 minutes or so. At peak times HSTs operate stopping services to Reading then fast and these will become IEPs anyway.
So let’s wait and see what the best Oxford option is, that maybe include provisions for plans for Cowley, Abingdon & Witney as in the Oxford County plans.
As I said yesterday, the revised track layout that is planned for the Oxford area resignalling project and is then supposed to be electrified is designed to allow a future station to be built with the minimum of extra work on track and signals. The future station concept is a red herring and in no way an obstacle to wiring to Oxford.
Next time you are at Culham, take a look at the east side of the line - where you will see the Culham Science Centre - a place where a lot of people work and which means the station attracts inbound commuter traffic, as well as people travelling out of the village.
The odds of IEPs being used on semi-fasts in the peaks are slim to non-existent - the current HST duties are to deal with traffic from Didcot and at the likes of Maidenhead and Twyford. Welcome to the world of 12-car 387 formations...
Cowley may eventually happen if enough funds can be squeezed out of developers. Abingdon and Witney are fantasies unless something changes radically - and the county council is planning to spend lots of money on bus-based schemes on the Witney corridor.
I have to agree with you HowardGWR, as part of the issue is even though the class 800 are bi - modes they can only do 100mph in the non OHLE areas and if those areas such as the route path from Didcot to Oxford have sections where 125mph is capable then the class 800's will only be doing 100mph. This means , if the route to Oxford doing the fast trains even need to be re - timed to be slower in reaching Oxford or Class 180's/HST's will need to be kept on for a longer period until the electrification is completed to Oxford.
Note, that it will be the class 802 trains that will have 125mph capable diesel engines and they will not be introduced until December 2018 at the earliest.
As I suspect that class 800 trains will be used on the Oxford/Cotswold routes from July next year I am going to presume that they will take over any services run by the class 166's on this route, so that they can go westwards and replace the class 180's. This may leave some 5 car HST sets running on these routes until the class 802 fleet arrives.
The above is just my thoughts and theories though, so could be wrong.
The urban myth about what speed Class 800s can do on diesel rears its head again. The pre-series Class 800 sets been tested at 125mph on diesel power.
There is no 125mph running north of Didcot.
The first Class 802s are due to enter service in the summer of 2018, with almost all of the fleet available from December that year. Some of the additional order placed this summer will be arriving in early 2019.
Class 800s will indeed be used on the Cotswold Line in five-car formation - they always were going to be. Nine-Car 802s will be seen on Cotswold peak services.