I wouldn't have bothered wasting vast amounts of money on massively expensive trains. Rather got the electrification done and then ordered off the shelf electric trains which are incredibly cheap at the moment. The pure fact that these are bi-modes has given an ideal excuse to cancel/delay/defer the rest of the project while still keep the political PR of introducing shiny new trains. I could see this happening months and months ago, I posted a few times that I could see these bi-modes providing a great excuse for them to delay electrification. I was lambasted by the usual suspects saying that it wouldn't delay electrification at all, yet here we are with MP's and NR deferring it! They will not even commit to a date as to when it will be completed, with some saying that it may never be completed at all. Like I said before when the politicians get nervous about the costs with bi-modes they have a fantastic excuse to just push the whole issue of getting electrification done way into the future. And to think I was told repeatedly by people on this forum that electrification would not be delayed, just shows how much people on here really know!
You are Mick Cash and I hereby claim my £5.
Amazing how one can claim something about old posts that nobody is going to follow up and thus becomes a possible non-sequitur, simply because we can't be bothered (very sensibly).