Why does it cost so much more then.
I have no idea why.
Why does it cost so much more then.
I lot of people have puzzled over the huge costs of project's these days.Why does it cost so much more then.
Possibly not, on reflection. Surely not HMG slipping out bad news whilst everyone is waiting to see what happens over the pond..............
Why does it cost so much more then.
Can the bi-modes switch between mode without stopping?
Probably right now it'll be the rail industry as a whole given the delays, rising costs, lengthy industrial disputes etcLooks like the government understandably have lost faith in network rail and its suppliers.
Looks like the government understandably have lost faith in network rail and its suppliers.
Pity as they seemed to me to be starting to get there act together.
K
Didn't something like that affect Cambridge back in the late 1970s/ early 1980s? Electrification as far as Royston, but a DMU shuttle beyond that.
The original GN suburban electrification (1978) was indeed only to Royston.
However the route was not the primary Cambridge route then, and it carried nothing like today's traffic.
Royston-Shepreth was done at the same time (1988) as the GE Bishops Stortford-Cambridge line, and on to King's Lynn (1992).
Is it too late to make all the GWR new stock the higher powered class 802?
Andrew
What a surprise! I said quite a while ago that bi-modes give the powers that be a great excuse to delay electrification schemes, and was told that wouldn't happen. Seems like it's happening already!
Well if one was being very cynical you could view it as the government have got their new super expensive trains for their Tory heartlands to keep them happy so cancelling/delaying/deferring whatever you want to call it isn't going to be politically damaging so it probably wasn't a difficult decision. Someone should be screaming at them to just get it done!
We are skint, end of, and up until now we havent really been determined to show it. I would have thought the more astute people on here would now have sussed that with Oxford gone that E-W knitting will soon go too. It also nails the coffin of electric spine firmly shut now I suspect.
Well if one was being very cynical you could view it as the government have got their new super expensive trains for their Tory heartlands to keep them happy so cancelling/delaying/deferring whatever you want to call it isn't going to be politically damaging so it probably wasn't a difficult decision. Someone should be screaming at them to just get it done!
Whilst I understand the reasons behind not running into Oxford/ Bristol (since you can dump some of the electrification costs onto the project paying for remodelling/ resignalling etc), Im surprised at the wires still going from Bristol Parkway to Cardiff thats a long way to go for two trains per hour which involves the complication of going under the Severn. Politically sensitive to be seen to cut electrification to Wales?
The reason it's more pathetic is that Filton Bank and Bristol to Bath have had a lot of work done ready and are ready to do!
Given that the Severn Tunnel was recently closed causing great inconvenience for several weeks to allow for electrification works, it would be political suicide to cut that.
I don't see many benefits from brexit, but perhaps one will be that we no longer need to increase clearances for live OHLE in order to meet European specifications, and can avoid the extra costs that has contributed to this mess.
So GWR looking for extra DMUS now
Skint? Not really. Many poorer nations manage to build far more houses, electrify many more lines, build more stations etc. The UK managed more in very poor periods eg the 30s after the crash, 1950s austerity, 1970s when it went to the IMF.
It's a question of choice. Do you grow an economy and improve living standards through investment in infrastructure or not.
But the UK can increase foreign aid by £3 billion whilst France and Germany cut theirs, and whilst this country cuts transport spending by 35%. It can spend £25 billion each and every year on housing benefit (much going to private landlords who've bought up ex council homes) as housing and rents sky-rocket through a lack of building, but not use that money to build outright to lower long term costs to the taxpayer. The UK is spending lots of money, but in the right areas?
No they're not, there's still massive amounts of work to do before electrification.
The BBC are reporting that the project won't be completed until 2024. I wonder whether that is just London to Swansea or whether that includes all the deferred bits too.