Was discussed in this thread a couple of weeks back. Who knows what announcements were made immediatley prior to switch on with the WCML and ECML schemes. I recall some sort of news media safety campaign at the time, but cannot remember any posters or announcements made.
AIUI the safety distances are calculated to include the possibility of people raising umbrellas.
Was discussed in this thread a couple of weeks back. Who knows what announcements were made immediatley prior to switch on with the WCML and ECML schemes. I recall some sort of news media safety campaign at the time, but cannot remember any posters or announcements made.
AIUI the safety distances are calculated to include the possibility of people raising umbrellas.
With wires about fourteen feet nine inches high at the minimum, take off three feet for the platform and that leaves eleven feet nine inches. I'm 6' 3" and, at full stretch I can just - on tip-toe - reach to seven foot nine. Add on two and a half feet for an umbrella and that takes the tip of it to nine foot nine. Now, who walks around with an umbrella help up at full stretch?
There is sensible safety and there is stupid safety.
With wires about fourteen feet nine inches high at the minimum, take off three feet for the platform and that leaves eleven feet nine inches. I'm 6' 3" and, at full stretch I can just - on tip-toe - reach to seven foot nine. Add on two and a half feet for an umbrella and that takes the tip of it to nine foot nine. Now, who walks around with an umbrella help up at full stretch?
There is sensible safety and there is stupid safety.
two words:Because it is entirely possible such a situation may arise at some point. Calling that "stupid safety" just displays a lack of imagination.
I remember one where the bloke lost both arms and both legs, and was quoted as saying he "didn't want to live any more". There was a pile of black shavings on the platforrm, and the metal drain cover he was standing on was melted in places.Although I seem to remember hearing once of someone using a platform edge as a substitute river bank to try out the balance of his nice new carbon fibre fishing rod while waiting for his train home. Zapp.
That is either Goring or Cholsey, suspect the former. I'm sure I remember a pair of midpoint anchor portals at the East end of Goring, and one is visible in the photo.Network Rail have published a press release about resignalling work in the Bristol area, which they describe as preparing the way for electrification and the Filton bank four tracking.
I am deeply intrigued by the main photo they use (I know the second one is not the great western at all). Are there really wires up around Bristol or is that just from somewhere else on the GWML?
Grant, a member of the GWR social media team, has just said (on Facebook and in answer to questions) that Henley and Slough will be using 365s from December 2017 and that Marlow will retain 16x.
So GWR will be taking 365's after all365s? I would hope that he meant 387s!
Network Rail have published a press release about resignalling work in the Bristol area, which they describe as preparing the way for electrification and the Filton bank four tracking.
I am deeply intrigued by the main photo they use (I know the second one is not the great western at all). Are there really wires up around Bristol or is that just from somewhere else on the GWML?
That is either Goring or Cholsey, suspect the former. I'm sure I remember a pair of midpoint anchor portals at the East end of Goring, and one is visible in the photo.
Sent from my HTC One_M8 using Tapatalk
By George you're right. The cantilever is GEFF equipment rather than series 1. The gooseneck which runs down from the catenary is a flatter shape.If it's the stock photo I think it is, that looks more like the GEML to me. The Grey Lampost is more Abellio GA Grey than either FGW Blue or GWR Black. Don't think there's any fences like that on the GW either.
By George you're right. The cantilever is GEFF equipment rather than series 1. The gooseneck which runs down from the catenary is a flatter shape.
Sent from my HTC One_M8 using Tapatalk
The electrification gangs are busy at Tilehurst today.
Both reliefs are wired through the station now, but I'll have to wait for next week when the trains are back to check where things are actually completed to.
There are "limit of operation signs" for electric trains on the up end of the Tilehurst platform mains.
The electrification gangs are busy at Tilehurst today.
Both reliefs are wired through the station now, but I'll have to wait for next week when the trains are back to check where things are actually completed to.
There are "limit of operation signs" for electric trains on the up end of the Tilehurst platform mains.