I did a trip from London to Newport and then Cardiff to London yesterday.
All the following is of the relief lines, so new to me:- there are a few short wire runs in and around the West Drayton area. From the train care depot at Reading to Tilehurst on the up relief only, support arms have appeared so maybe wiring from the depot to the eastern end of the wiring at Tilehurst will happen soon.
At the other end of the test track, new wiring has appeared on the up relief from Foxhall Junction, which is just west of Didcot, to match up with where the existing wiring ends on the main line at Milton sidings, therefore there is now a gap from Foxhall Junction to where the electrification depot is just east of Didcot on the relief lines.
Support arms have now appeared on the four track section between Didcot and Swindon on the up lines and there are two arms installed so it looks like the relief lines will be wired.
More piles are getting closer to Swindon from either end but there is still nothing in the station area itself.
About ten or so concrete foundations have appeared between Wootton Bassett and Bristol Parkway, about 5 miles west of the M4 bridge near Wootton Bassett.
In the Pilning area there are about ten masts installed on either side and the footbridge on the station in still there, not for much longer though.
Onto South Wales and opposite the Llanwern steelworks there are about 12 masts on the up and about 18 on the down installed.
Lastly again on the relief lines, this time between Cardiff and Newport, there are a lot of piles installed these are to cover all four tracks but it don't mean they will all be wired, I guess it is around 50% complete, they fizzle out at the Cardiff and Newport ends.
So more progress, there are quite a few places that wiring can start near West Drayton/Ivor for example and with the Severn tunnel closure not that far away they might be a lot of progress between Wootton Bassett and Severn Tunnel Junction, let's see.