It hasnt been undertaken using the Short Term Network Change process so it looks as if it has been dealt with as a permanent measure but that doesnt stop it reopening at a later date.
Is that permanent PP? I understood from you earlier in this thread that there was to be a new footbridge installed?
Those will be the ones mentioned in post #2406 back in April. I don't think there have been any more since, unless something has happened very recently.
https://vimeo.com/166803000
Not sure if I've added the link correctly but excellent time lapse of the Kirow installing piles on the WEA in April.
Fingers crossed it works.
https://vimeo.com/166803000
Not sure if I've added the link correctly but excellent time lapse of the Kirow installing piles on the WEA in April.
This was a long possession starting on friday night through until early Monday morning. It's between Swindon and Uffington. I was there during the loading and back in on the Sunday where we piled in the Shrivenham/Bourton area.
The Kirow is just a crane but it's able to carry alternative bits of kit to drive or vibro the piles in where the HOPS struggles. It is also able to pile on either side regardless of its position as it has a counterweight and longer boom. ABC do some areas of piling whilst AMEY do others, this was a bit of mix and match, think it got in 54 piles during the possession. The company who did the film tried out putting a camera on the boom and it's worked really well, especially whilst the crane was travelling.
Thanks, very interesting.
Good to see multiple teams on the job.
It makes driving the piles look like child's play!
I pose a question, based on recent findings. Apparently GWR are no longer getting Class 365's, as their revised 387 order covers enough stock now. So may I ask, what will operate on both the Windsor & Eton Central line and the Henley on Thames line? Are they expecting to put 387's in four car formation on these lines? Good luck!
I pose a question, based on recent findings. Apparently GWR are no longer getting Class 365's, as their revised 387 order covers enough stock now. So may I ask, what will operate on both the Windsor & Eton Central line and the Henley on Thames line? Are they expecting to put 387's in four car formation on these lines? Good luck!
I pose a question, based on recent findings. Apparently GWR are no longer getting Class 365's, as their revised 387 order covers enough stock now. So may I ask, what will operate on both the Windsor & Eton Central line and the Henley on Thames line? Are they expecting to put 387's in four car formation on these lines? Good luck!
Given that 365s are 4x 20m long (just like the 387s) I can't see why this is suddenly an issue?
Well that would make sense then, and also with GWR having solely 387's, that makes coupling up units a lot easier rather than having 365's and 387's. What does everyone think will be happening to the Marlow line? It's not due for electrification and I'm not sure keeping a 165/166 just for this route is worth it in the long term...
I was on days on Monday and don't remember it being used!
What's bizarre about that, particularly?Switch on for test section now 22:30 on 2nd July for Milton to Scours Lane on the main lines and rather bizarrely 22:30 on 16th July for the relief lines Moreton Cutting to Scours Lane.
Here is link of a trip last week from Paddington to Reading on fast service. Filming started just east of Acton. Not a good view as seats where full on the good windows so no comments on poor shoot please. Hope to do Reading to Oxford on Monday. It shows the status of works on the slow lines.Is all the tracked between Paddington and Reading at least all wired up?
I wish that there was someone who was good at arty farty stuff on Photoshop could post a map of the route showing where no work has been done yet, where masts are up, where masts are wired and where is energised
--- so no comments on poor shoot please. Hope to do Reading to Oxford on Monday. It shows the status of works on the slow lines.
https://youtu.be/Cr3vvsfTwtM
I trust this helps answer some of your questions......
I did Paddington > Reading > Paddington last weekend and your vid confirms my memory that there are still plenty of headspans between Acton and Airport Junction. Hope these will be replaced over time.Fine workI did Paddington > Reading > Paddington last weekend and your vid confirms my memory that there are still plenty of headspans between Acton and Airport Junction. Hope these will be replaced over time.