LNW-GW Joint
Veteran Member
This from the IEP Train Technical Specification (p38/39):
So a pretty comprehensive spec.
I seem to remember this is derived from Alstom's Pendolino capability, which was adapted from their TGV experience.
There's a similar IEP requirement to collect track geometry data for NR.
4.17.5 Unattended Overhead Line Measurement System (UOMS)
It is an essential requirement that sufficient IEP trains are fitted with an operational UOMS so that Overhead Line (OHL) condition data is provided to Network Rail, for each route, at least twice weekly.
It is an essential requirement that the IEP trains UOMS system shall require no operator intervention and shall monitor and record the following overhead line parameters:
Parameter Repeatability of signal (at same speed and similar environmental conditions)
Overhead Line Height +/- 10mm
Overhead Line Stagger (uncompensated for vehicle roll) +/- 10mm
Pantograph Contact Force (max within 0.2m sample) +/- 5N
Pantograph Vertical Acceleration (max within 0.2m sample) +/- 2g
Pantograph Longitudinal acceleration (max within 0.2m sample) +/- 1g
Train Speed +/- 2mph
DGPS TBD
It is an essential requirement that the UOMS system shall be capable of delivering data to the level of accuracy defined in TS1917 (subject to vehicle dynamics and environmental conditions).
In addition to this the location of the signals must be repeatable to 1m (run-on-run) with absolute location of the network being determined to within 3m in terms of miles and yardage. All data must be attributed with the correct Engineers Line Reference ELR / Track ID (TRID).
The accuracy and repeatability of the UOMS outputs shall be determined as follows:
by comparison to Network Rails fleet of calibrated infrastructure monitoring trains.
by run-on-run UOMS comparison
It is an essential requirement that the data acquisition rate of the UOMS system shall allow the NR reconstructed OHL parameters to show data at intervals of at least every 0.2m along the route being monitored.
It is an essential requirement that the IEP trains shall be capable of transmission of the captured data to remote sites. The data gathered shall be automatically down loaded to ground based receivers to be provided by the TSP. These will be located at depot and stabling and other defined locations. The data shall be passed on to Network Rails Engineering Support Centre (ESC) in a format compatible with Network Rails analysis tools.
So a pretty comprehensive spec.
I seem to remember this is derived from Alstom's Pendolino capability, which was adapted from their TGV experience.
There's a similar IEP requirement to collect track geometry data for NR.