Yes that's what I got. I am a member too. You must be right. Hopefully he will pick this thread up and make the photo available.

Incidentally,Mcafee tells me that Dropbox is a dodgy website (not for the first time I might add).

I personally wouldn't touch McAfee with a barge pole. Dropbox itself is for the most part, fine.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

oxoneil

Member
Joined
22 Jan 2014
Messages
235
I don't see anything. If you click on the Quote button for his post you can see tht he's tried to enclose something between [ IMG] and [ /IMG] markers.

Oops, not sure what's happening here. I've never really properly got to grips with loading images onto forums. When I posted originally it showed up. I'll have another go later, any tips on how to make it so everyone can see it? Presumably I need a photo hosting site which isn't Dropbox??? Ideally I'd like the image in the post as opposed to a link.
 

Peter Mugridge

Veteran Member
Joined
8 Apr 2010
Messages
17,790
Location
Epsom
Oops, not sure what's happening here. I've never really properly got to grips with loading images onto forums. When I posted originally it showed up. I'll have another go later, any tips on how to make it so everyone can see it? Presumably I need a photo hosting site which isn't Dropbox??? Ideally I'd like the image in the post as opposed to a link.

Just upload it directly; if you scroll down below the quick reply box you'll see a button "manage attachments"; if you click on that you can select a picture directly from your computer to the forum.

If, on the other hand, you are trying to do it remotely on a phone - I haven't a clue as I never do it that way but someone else will be able to explain that process in a minute.
 

Nippy

Member
Joined
13 Aug 2013
Messages
740
Yep. That's there.
--- old post above --- --- new post below ---
Had a quick run from Padd to Reading yesterday. East of Maidenhead there has been a lot of progress now. (No doubt because of how many sodding additional line blockages we have been giving BB to erect booms). Lots of the small steel is in place.
 

Ironside

Member
Joined
16 Aug 2012
Messages
418
My friends who live near twyford mentioned that there was more overnight work going on near them last week. Or "lots of ******* banging at 3am" as they put it.
 

oxoneil

Member
Joined
22 Jan 2014
Messages
235
Well done and most grateful, do keep them coming if possible. I am wondering if we could not do a LCDRExile and create a Flickr site for this subject?

Yeah can do if there's the interest. I'm near Challow so have good access to Grove, Uffington and Shrivenham.
 

leomartin125

Member
Joined
15 Nov 2015
Messages
1,058
Location
North West
My friends who live near twyford mentioned that there was more overnight work going on near them last week. Or "lots of ******* banging at 3am" as they put it.

On the NR website, they have posts about when piling occurs, and it currently is a big focus between Maidenhead and Reading as the rest of the route is a lot further advanced now, like Tilehurst to Pangbourne.
 

Ironside

Member
Joined
16 Aug 2012
Messages
418
On the NR website, they have posts about when piling occurs, and it currently is a big focus between Maidenhead and Reading as the rest of the route is a lot further advanced now, like Tilehurst to Pangbourne.

I think I found the page ( I couldn't work out how to link to it) and I cut and pasted the relavent part below:

Piling work
We're undertaking piling work in the areas shown below from Tuesday 19 to Friday 29 January 2016 .Please note that this schedule could change at short notice for operational reasons.

Before starting the piling work we may need to clear overgrown vegetation running alongside the line. Find out more about why and how we manage vegetation

Reading to Pangbourne
Tuesday 19 - Friday 22 January 2016

11.00pm - 05.45am
Local Authority:Reading and West Berkshire

Tilehurst Station to Shooters Hill (A329), Pangbourne
Saturday 23 - Sunday 24 January 2016
8.00pm - 08.00am
Local Authority:Reading and West Berkshire


Maidenhead Office Park to A3290 Railway Overbridge
Monday 25 - Friday 29 January 2016
10.15pm - 05.45am
Local Authority:Wokingham
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
I think I found the page ( I couldn't work out how to link to it) and I cut and pasted the relavent part below:

Piling work
We're undertaking piling work in the areas shown below from Tuesday 19 to Friday 29 January 2016 .Please note that this schedule could change at short notice for operational reasons.

Before starting the piling work we may need to clear overgrown vegetation running alongside the line. Find out more about why and how we manage vegetation

Reading to Pangbourne
Tuesday 19 - Friday 22 January 2016

11.00pm - 05.45am
Local Authority:Reading and West Berkshire

Tilehurst Station to Shooters Hill (A329), Pangbourne
Saturday 23 - Sunday 24 January 2016
8.00pm - 08.00am
Local Authority:Reading and West Berkshire


Maidenhead Office Park to A3290 Railway Overbridge
Monday 25 - Friday 29 January 2016
10.15pm - 05.45am
Local Authority:Wokingham

Here is the link (you just copy from the URL and paste here).
http://www.networkrail.co.uk/great-western-route-modernisation/west-berkshire/

There is a page for each section at this URL
http://www.networkrail.co.uk/great-western-route-modernisation/

Local work updates
Use the links below to find out about modernisation work on the Great Western line in your area.

Bath and North East Somerset Oxfordshire
City of Bristol Reading
Maidenhead and Windsor South Gloucestershire
Monmouthshire West Berkshire
Newport Wiltshire and Swindon
City of Oxford


oxoneil please do that and then we could all put any pics in it. I may be coming up to that area and also I go via Bristol occasionally. Thank you.
 
Last edited:

QueensCurve

Established Member
Joined
22 Dec 2014
Messages
2,195
Despite being bright and new, and not obscured by wiring, the Series 1 kit does look quite unobtrusive considering its design objectives.

Perhaps that is an illusion caused by the absence of portals over the platforms?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
Good pictures. Thank you.

I still don't understand why there is no evidence at all of electrification work through the station itself - it seems like this will hold up the wiring when they get that far.

Different digging equipment will usually be used within stations, and if working at the back of a platform it may not need a four track possession like those gantries do, especially if they use separate twin track cantilevers for mains and reliefs.

So they'll make maximum use of limited trackside access to install equipment that needs it, and come back to the stations afterwards.

This is consistent with what is going on between Reading and Didcot, the station areas are clearly being done on separate timescales.
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,274
Perhaps that is an illusion caused by the absence of portals over the platforms?

Not really. One thing that does strike you from train on the actual wired-up section east of Pangbourne is how little 'clutter' there actually is with this kit when it is all up there, when compared either with older portal electrification, or indeed the supposedly 'invisible' headspans - whenever travelling in and out of Paddington, I, for one, am always conscious of the sheer amount of 'clutter' there seems to be strung up over the tracks.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,007
Location
St Albans
Not really. One thing that does strike you from train on the actual wired-up section east of Pangbourne is how little 'clutter' there actually is with this kit when it is all up there, when compared either with older portal electrification, or indeed the supposedly 'invisible' headspans - whenever travelling in and out of Paddington, I, for one, am always conscious of the sheer amount of 'clutter' there seems to be strung up over the tracks.

Maybe SN109 would have been more visible had OLE that was not engineered down to the lowest installation cost and vainly attempting to be unobtrusive been strung up at Ladbroke Grove.
 

hassaanhc

Established Member
Joined
5 Jan 2014
Messages
2,225
Location
Southall
Different digging equipment will usually be used within stations, and if working at the back of a platform it may not need a four track possession like those gantries do, especially if they use separate twin track cantilevers for mains and reliefs.

So they'll make maximum use of limited trackside access to install equipment that needs it, and come back to the stations afterwards.

This is consistent with what is going on between Reading and Didcot, the station areas are clearly being done on separate timescales.

Could they be waiting for platform extension work to start? At many stations, usually where the centre island already tapers off at the end, this will require both relief lines to be moved sideways and the existing side platform to be cut back. I know over Christmas half of Southall's Up Relief platform was demolished and rebuilt as a temporary structure that can be moved easily once the track needs moving in order to extend the Down Relief + Up Main island.
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,274
Could they be waiting for platform extension work to start? At many stations, usually where the centre island already tapers off at the end, this will require both relief lines to be moved sideways and the existing side platform to be cut back. I know over Christmas half of Southall's Up Relief platform was demolished and rebuilt as a temporary structure that can be moved easily once the track needs moving in order to extend the Down Relief + Up Main island.

Don't think so. As noted back up the thread, the stations generally tend to be the places where there are fewer masts planted and as swt_passenger said, these locations often require bespoke solutions for mast installation, due to varying positions where the masts have to be sited. Between Reading and Didcot, the intermediate stations are pretty much the only places missing masts now and with footbridges needing replacement at some of them, catenary metalwork is probably the last thing you would want nearby until the bridges are finished.
 

leomartin125

Member
Joined
15 Nov 2015
Messages
1,058
Location
North West
I have been out exploring the extensiveness of the electrification between Tilehurst and Panbourne and to be fair, it looks like the West Coast Mainline out there now. I'll post pictures today for reference.
--- old post above --- --- new post below ---
http://www.flickr.com/photos/138309095@N05/24632019801/in/dateposted-public*********

[IMG]http://www.flickr.com/photos/138309095@N05/24098643413/in/dateposted-public*********

[IMG]http://www.flickr.com/photos/138309095@N05/24699288986/in/dateposted-public*********

[IMG]http://www.flickr.com/photos/138309095@N05/24342659529/in/dateposted-public*********

[IMG]http://www.flickr.com/photos/138309095@N05/24725488385/in/dateposted-public*********

That's all of my photo's from yesterday, looks so different now. I visit Chedddington to get pictures of 90's and 86's etc... and this looks just like it now, if not more modern.
 

cjmillsnun

Established Member
Joined
13 Feb 2011
Messages
3,275
I have been out exploring the extensiveness of the electrification between Tilehurst and Panbourne and to be fair, it looks like the West Coast Mainline out there now. I'll post pictures today for reference.
--- old post above --- --- new post below ---
http://www.flickr.com/photos/138309095@N05/24632019801/in/dateposted-public*********

[IMG]http://www.flickr.com/photos/138309095@N05/24098643413/in/dateposted-public*********

[IMG]http://www.flickr.com/photos/138309095@N05/24699288986/in/dateposted-public*********

[IMG]http://www.flickr.com/photos/138309095@N05/24342659529/in/dateposted-public*********

[IMG]http://www.flickr.com/photos/138309095@N05/24725488385/in/dateposted-public*********

That's all of my photo's from yesterday, looks so different now. I visit Chedddington to get pictures of 90's and 86's etc... and this looks just like it now, if not more modern.[/QUOTE]
You may want to check those links.
 

nickswift99

Member
Joined
7 Apr 2013
Messages
282
At Goring & Streatley the first portal has now been installed across the Main at the country end of the platform close to the temporary footbridge. Still no clear date for the new footbridge to get installed though...

My guess is that there will be lots of work in late Feb/March when there's Sunday blockades at Didcot.
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,218
Maybe SN109 would have been more visible had OLE that was not engineered down to the lowest installation cost and vainly attempting to be unobtrusive been strung up at Ladbroke Grove.
Likewise the Up Main signals at Southall. The accident there occurred almost as soon as the wires had gone up, before electric services started.
 

nlogax

Established Member
Joined
29 May 2011
Messages
6,007
Location
Mostly Glasgow-ish. Mostly.
The more I look at it, the better that F&F kit looks. Properly 'industrial' and actually able to withstand more than a stiff breeze. I'd love to see it replace older OHLE sections over time.
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
The more I look at it, the better that F&F kit looks. Properly 'industrial' and actually able to withstand more than a stiff breeze. I'd love to see it replace older OHLE sections over time.

I agree, though, visually, the bits that stick out at the top, of varying heights, seem to shout 'please cut me off and make it all level'. I think our colleague Philip Phlopp explained why it is so designed, but I've already forgotten why.
 

mewstone

Member
Joined
6 Sep 2015
Messages
24
HowardGWR wrote "I agree, though, visually, the bits that stick out at the top, of varying heights, seem to shout 'please cut me off and make it all level'. I think our colleague Philip Phlopp explained why it is so designed, but I've already forgotten why."

Isn't it so that the autotransformer feed wire is electrically isolated from the (I hope this is the correct term) trains pantograph pick up wire, without the need to bolt on additional equipment. This keeps down the cost and makes the structures less cluttered and quicker to install. Also with ease of installation and overall costs in mind the components are made to a standard size and therefore the "bits that stick out at the top" will vary from location to location as a result of differing ground conditions, giving different top of rail to pick up wire heights?

( perhaps I should clarify what I am trying to say. I would guess that the top of rail to pick up wire distance will be pretty much constant, just that due to differing ground conditions the top of the piles will vary so to maintain this constant distance the equipment positions on the OHLE supports will vary slightly, hence the differences in the "bits left over at the top" I think I am getting out of my depth here!)
 