Chris Green ran InterCity 1992-95 and Virgin Trains 1999-2005.
He was just too late to be in charge of the introduction of IC225 on the newly electrified ECML, but he did introduce Pendolinos on the WCML in the midst of the route upgrade trauma..

He also ran Scotrail for a couple of years I think before he came to Network Southeast.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Radedamer

Member
Joined
19 Oct 2015
Messages
107
Location
Brizzle
I understand that the platforms at Keynesham have to be lowered in connection with electrification. Could anyone explain why this is? Thanks!
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
I understand that the platforms at Keynesham have to be lowered in connection with electrification. Could anyone explain why this is? Thanks!

Track bed lowering to increase clearance under the Station Road bridge, lower track bed requires lower platforms (sorry for stating the obvious). It's an alternative to bridge replacement because in this case, a replacement bridge provides no additional clearances.

The bridge will gain new/heightened parapets though, at 1.8m, to meet new safety requirements.
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
I understand that the platforms at Keynesham have to be lowered in connection with electrification. Could anyone explain why this is? Thanks!


Shewing your age (as my 'shew' does). K E Y N S H A M and don't forget the fabulous 'infra draw method.'*

* Horace Batchelor advert Radio Luxembourg 1950s Rediffusion.
 

Radedamer

Member
Joined
19 Oct 2015
Messages
107
Location
Brizzle
Ooops! :oops: I must have been thinking of that 'new' town in Bucks, you know: John Maynard Friedman. ;)
--- old post above --- --- new post below ---
Track bed lowering to increase clearance under the Station Road bridge, lower track bed requires lower platforms (sorry for stating the obvious). It's an alternative to bridge replacement because in this case, a replacement bridge provides no additional clearances.

The bridge will gain new/heightened parapets though, at 1.8m, to meet new safety requirements.

Sorry, I don't really understand that. I can see that lowering the track might be cheaper, easier, quicker or less disruptive than replacing the bridge, but how could it be that a replacement bridge could not provide additional clearance?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,229
Sorry, I don't really understand that. I can see that lowering the track might be cheaper, easier, quicker or less disruptive than replacing the bridge, but how could it be that a replacement bridge could not provide additional clearance?

If the bridge deck is currently of minimum thickness for a large span (and on the skew as in this case) they would have to raise the road surface with the bridge, and they'd end up with all sorts of odd road cambers because of the skew, and it is right next to a road junction.

Every bridge is different, there is no general purpose solution.

If it was an ordinary perpendicular ramped approach, then lifting the road surface all round, with a gradual height increase on the ramps would be much easier.
 
Last edited:

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
If the bridge deck is currently of minimum thickness for a large span (and on the skew as in this case) they would have to raise the road surface with the bridge, and they'd end up with all sorts of odd road cambers because of the skew, and it is right next to a road junction.

Every bridge is different, there is no general purpose solution.

If it was an ordinary perpendicular ramped approach, then lifting the road surface all round, with a gradual height increase on the ramps would be much easier.

That's precisely it - the road layout precludes raising the height of the road to match a raised bridge deck, the bridge deck is of minimum thickness for the span and can't be reduced even with a new build, which leaves dropping the railway underneath the bridge as the only option.

Bridge decks in the past, prior to steel reinforced concrete, tended to much thicker, so rebuilding them with a reinforced concrete deck whilst maintaining road height 'as is' usually frees up more than enough space for electrical clearances. It's easy to gain 12 inches in many cases.

GWML Series 1 OLE doesn't change contact wire height underneath beneath bridges either, so this bridge may require attention that it wouldn't need using the Series 2 equipment, but this has significant reliability benefits from the aerodynamic performance of pantograph and train, over the longer term and is a good thing.
 

Radedamer

Member
Joined
19 Oct 2015
Messages
107
Location
Brizzle
Okay, thanks. I'd taken it for granted that raising the bridge deck involved raising the road surface and had not considered it might be impossible here due to the bends on the approach.
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,068
Location
Redcar
I've moved discussion about Goring Gap and the impact of electrification on it and other AONBs into a new thread here. Please therefore leave this thread for more general discussion and updates regarding the GWML electrification and conduct discussions around Goring Gap and any consultations/recriminations/other issues on that thread.
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
Okay, thanks. I'd taken it for granted that raising the bridge deck involved raising the road surface and had not considered it might be impossible here due to the bends on the approach.

What's great (I now think - it was not always so) is that the platform shelters, otherwise incongruous for a wayside station, are preserved. They record (and should thus be listed structures) the fact that hundreds of Bristolians were shipped out to Keynsham daily to man the chocolate making machines at Fry's. The latter factory was originally situated plum in the centre of Bristol, near Union St.

If the project had been proposed now, it would not be countenanced - a flood meadow where the Duke of Monmouth's forces had assembled and in the Green Belt to boot.

The flow now is in the reverse direction with trains going to Abbey Wood.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Press release

http://www.networkrailmediacentre.c...electrification-work-to-improve-rail-journeys

The local community gathered in Magor to celebrate Whitewall footbridge becoming the first new railway bridge to open in South Wales as part of Network Rail’s electrification of the South Wales Mainline.

...

Although Whitewall does not carry an official public right of way, Network Rail reconstructed the bridge after discussions with Monmouthshire Council and the local community revealed it was regularly used by children walking to school. It is also used on weekly school visits to the nearby Magor marshlands, with the only alternative being walking along a road with no footpath which is frequently used by large agricultural vehicles.
 

furnessvale

Established Member
Joined
14 Jul 2015
Messages
4,897
Quote:
Although Whitewall does not carry an official public right of way, Network Rail reconstructed the bridge after discussions with Monmouthshire Council and the local community revealed it was regularly used by children walking to school. It is also used on weekly school visits to the nearby Magor marshlands, with the only alternative being walking along a road with no footpath which is frequently used by large agricultural vehicles.

Presumably DEFRA, on behalf of agriculture helped with the cost.......No, I thought not.
 

LexyBoy

Established Member
Joined
23 Jan 2009
Messages
4,478
Location
North of the rivers
What's this? Crossrail to Oxford? The public should be told!

Great Western Route ‏@networkrailgwrm 3h3 hours ago
@YoungCommuter it's between Tilehurst and Pangbourne so within Crossrail area but will be used by Crossrail and main line trains.

<D
 

Ironside

Member
Joined
16 Aug 2012
Messages
418
Network rail have announced that wires went up last night on a section between between Tilehurst and Pangbourne.

The announcement was on twitter (@networkrailgwrm)
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
Using an SES roadrailer wiring vehicle I think? No HOPS yet?

It's a CrossRail and not a GWep worksite. The guys on the ground still managed to wire up 1km of (I think) contact wire in 35 minutes. I'd say that's a good result for the Series 1 OLE, although we knew it was going to be good in this respect having used a closely related design on the GEML renewal.
 

LexyBoy

Established Member
Joined
23 Jan 2009
Messages
4,478
Location
North of the rivers
It's a CrossRail and not a GWep worksite. The guys on the ground still managed to wire up 1km of (I think) contact wire in 35 minutes. I'd say that's a good result for the Series 1 OLE, although we knew it was going to be good in this respect having used a closely related design on the GEML renewal.

OK, I'll take back my earlier sarcasm!

But why is this Crossrail's remit? I thought Crossrail wouldn't be going west of Reading depot?
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
Well, they beat my gloomy prediction of "not before Christmas". ;)
I imagine nothing can get powered up until a full set of wires reaches the grid access point west of Didcot?

Yes and no - wiring extending from Airport Junction could go live earlier but this serves no real purpose, other than a little testing work.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,229
It's a CrossRail and not a GWep worksite. The guys on the ground still managed to wire up 1km of (I think) contact wire in 35 minutes. I'd say that's a good result for the Series 1 OLE, although we knew it was going to be good in this respect having used a closely related design on the GEML renewal.

Still confused then - what has "between Tilehurst and Pangbourne" got to do with Crossrail?

Has the twitterer got the location completely wrong then?
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
Still confused then - what has "between Tilehurst and Pangbourne" got to do with Crossrail?

Has the twitterer got the location completely wrong then?

Location is accurate, as far as I'm aware.

I believe (but will need to double check) is it's due to the extension of CrossRail from Maidenhead to Reading, the original CrossRail West Outer Electrification scheme has been altered and CrossRail are responsible for wiring between Maidenhead and Reading (and a little further) but as part of the GWep project, rather than the CrossRail WOE project.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,229
Location is accurate, as far as I'm aware.

I believe (but will need to double check) is it's due to the extension of CrossRail from Maidenhead to Reading, the original CrossRail West Outer Electrification scheme has been altered and CrossRail are responsible for wiring between Maidenhead and Reading (and a little further) but as part of the GWep project, rather than the CrossRail WOE project.

Ah, so it could be a way of sharing out the overall work more efficiently, taking a chunk of work and giving it to a different set of people who are already 'worked up' and have their own methods and equipment.

Meanwhile the original GW team end up with slightly less to do?

I did notice a lot more insulators hanging from the TTCs east of Maidenhead - is that a sign that the work in that area is accelerating?
 
Last edited:

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,898
Location
Mold, Clwyd
Philip, are you saying Balfour Beatty are now doing work west of Maidenhead, and Amey consequently doing less?
I don't really understand how Crossrail can be involved in a 140mph GW test section at Pangbourne...
I would have thought that Reading would be the furthest point of interest to them.
I'll just say that BB's performance in the NW was less than exhilarating.
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
Philip, are you saying Balfour Beatty are now doing work west of Maidenhead, and Amey consequently doing less?
I don't really understand how Crossrail can be involved in a 140mph GW test section at Pangbourne...
I would have thought that Reading would be the furthest point of interest to them.
I'll just say that BB's performance in the NW was less than exhilarating.

CrossRail is using Series 1 OLE equipment - there's no difference in the OLE between the CrossRail and GWep works. The OLE is very similar out of the GEML on the Eastern surface side of CrossRail too.

Will try and find out exactly who is doing what and why for you.

And yes, BB weren't brilliant on the Northwest Electrification, but Carillion have been less than stunning on the GWML, despite general excellence in Scotland.
 

steverailer

Member
Joined
15 Feb 2013
Messages
169
It's a CrossRail and not a GWep worksite. The guys on the ground still managed to wire up 1km of (I think) contact wire in 35 minutes. I'd say that's a good result for the Series 1 OLE, although we knew it was going to be good in this respect having used a closely related design on the GEML renewal.

I think you could be wrong there Phil? Looks like earth wire to me as its sliver colour and under the boom, although don't know why its going into a insulator?
 