Great Western Electrification Progress

Status
Not open for further replies.

Tumbleweed

Member
Joined
17 Apr 2013
Messages
189
If the South Wales section could only be completed by cancelling the proposed appalling M4 additional southern bypass of Newport, I would have a big smile. The prof's report (see another thread) made clear this could be achieved just as effectively and much cheaper by upgrading the existing southern bypass with GSJs and extending it eastwards past the redundant steelworks site. The valleys electrification could be included to boot.

Agreed. We still live in country whose government still believes building expensive roads is the solution to everything. They wouldn't even consider spending a billion on public transport.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Olaf

Member
Joined
29 Mar 2014
Messages
1,054
Location
UK
There's an article on this by Roger Ford in September's Modern Railways: "Electrification Shocker", p28.

Basically:
- installation costs of new design Series 1 (GW) and Series 2 (elsewhere) are higher than BR Mk3b, instead of being lower as expected
- NR did not include upgrading the wiring from Paddington to Airport Jn for 125mph running (nor St Pancras to Bedford in the MML costs)
- there are doubts as to the capability of the HOPS system and its suitability over some of the GW route
- much of the GW scheme has not reached GRIP 3 and the design and costs are still uncertain
- grid connections (down to the power companies) are coming in much more costly than expected

ORR is reviewing each tranche of NR spend as it firms up.
The belief is that the overrun (believed to be from £1b to £1.5b) is such that descoping or delay is likely (on all CP5 schemes).
The CP5 plans and progress updates do have a warning that all electrification milestones are subject to confirmation.

Roger observes that Basingstoke-Southampton DC-AC conversion might be an early casualty.

Thanks. So at the moment, there is no official confirmation of either the delays, their causes, nor of possible outcomes.
--- old post above --- --- new post below ---
That's a shame. Surely NR could've gone for a more tried and tested OHLE system rather than come up with a new system that's hardly had any pantographs touch it at present?

As for the DC-AC conversion, that's still going to be needed in the future, with the oldest substations needing replacement and the cost of AC conversion being cheaper than renewing DC equipment altogether. If the plans get eliminated, we're going to end up with polluting diesels continuing on the route and the Electric Spine becoming meaningless.

If anything, based on the current NR documents, the project for DC-AC conversion for the electric spine has progressed.
--- old post above --- --- new post below ---
Agreed. We still live in country whose government still believes building expensive roads is the solution to everything. They wouldn't even consider spending a billion on public transport.

Current capital investment in rail is about £2B per annum; a slight increase over CP4.
--- old post above --- --- new post below ---
A little off topic, but a key milestone has been achieved at Reading:

Reading viaduct ready for tracklaying:
http://www.railwaygazette.com/news/...ew/reading-viaduct-ready-for-tracklaying.html
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,903
Location
North
Agreed. Maybe the gov't'll see sense sooner or later and shove it up the priority list...

Schemes that release the most DMUs per track mile of electrification should be given priority and "shoved" up the list. Valley lines will do this, routes in he North/Northeast would, the Electric Spine will not.
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,276
I doubt if the problems are anything to do with the design of Series 1 or 2, though the autotransformer system is additional to what BR would have installed.
It's more likely to be the deployment and productivity of the construction teams and kit.
An unbelievable number of orange suits has been needed on the NW scheme, which included specialist concrete foundations over Chat Moss and approaching Manchester Victoria.
The channel tunnel project, and more recently Crossrail, published frequent progress reports (positions of the TBMs) so that everybody could see what progress was being made during the project's lifetime.
It would be good if Network Rail did the same for its electrification programme.
It's that important to the future of the railway.
Currently it is all just too quiet on the GW front!

Too quiet for you is it?

Well here's some news from Network Rail's media centre from, er, yesterday.

The bridge over the railway at Fulscot Road has reopened to the public today, Friday 29 August, after work to prepare it for electrification was completed.

http://www.networkrailmediacentre.c...ad-bridge-is-reopened-to-the-public-213e.aspx

First bridge over the line east of Didcot. Meanwhile, a mile down the line at South Moreton, there are lots of masts planted ready to support the wires and others at various points along the way to Reading, plus piling etc, etc.

What on earth do you want them to do, have a live map with a pin in for each mast they plant or hole they dig? This isn't some nice neat operation where they work in a straight line from point a to point b. A rather different matter from tracking where the odd TBM has got to.
 

Olaf

Member
Joined
29 Mar 2014
Messages
1,054
Location
UK
If the South Wales section could only be completed by cancelling the proposed appalling M4 additional southern bypass of Newport, I would have a big smile. The prof's report (see another thread) made clear this could be achieved just as effectively and much cheaper by upgrading the existing southern bypass with GSJs and extending it eastwards past the redundant steelworks site. The valleys electrification could be included to boot.

Road users pay more than they get out of Government for the use of the roads, so it is hard to find reasons for NOT improving the roads on cost/benefits.
--- old post above --- --- new post below ---
Status updates for the GWML are published here (under "Updates by area"):
http://www.networkrail.co.uk/great-western-route-modernisation/
 
Last edited:

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,604
Location
Nottingham
Road users pay more than they get out of Government for the use of the roads, so it is hard to find reasons for NOT improving the roads on cost/benefits.

Do they pay for the roads provided by local authorities, the health and produtivity consequences of accidents and pollution, or the costs of policing the road network?
 

JamesRowden

Established Member
Joined
31 Aug 2011
Messages
1,762
Location
Ilfracombe
Road users pay more than they get out of Government for the use of the roads, so it is hard to find reasons for NOT improving the roads on cost/benefits.

Do they pay for the roads provided by local authorities, the health and produtivity consequences of accidents and pollution, or the costs of policing the road network?

Also, people driving rather than using public transport reduces the quality of public transport that can operate for a given budget.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,019
Location
St Albans
Road users pay more than they get out of Government for the use of the roads, so it is hard to find reasons for NOT improving the roads on cost/benefits.
--- old post above --- --- new post below ---
Status updates for the GWML are published here (under "Updates by area"):
http://www.networkrail.co.uk/great-western-route-modernisation/

Road users pay towards the cost of the pollution that they create. The VED is scasled up to discourage the purchase of new grand polluters and the fuel duty provides a cost based on fuel burnt, i.e. CO2 created.
The roads are funded by general and local taxation which is paid by everybody including those who don't use the roads (unless they get paid less than the various tax thresholds.
 

Nonsense

Member
Joined
20 Oct 2009
Messages
293
Do they pay for the roads provided by local authorities, the health and produtivity consequences of accidents and pollution, or the costs of policing the road network?

Yes. As others have said. By means of road and fuel tax, but also vat paid on any product transported by road. Which is pretty much everything tangible. It's possible to be pro rail without being anti road. Both are essential.
 

Olaf

Member
Joined
29 Mar 2014
Messages
1,054
Location
UK
Do they pay for the roads provided by local authorities, the health and produtivity consequences of accidents and pollution, or the costs of policing the road network?

Pretty much, plus other Government services besides.
--- old post above --- --- new post below ---
Road users pay towards the cost of the pollution that they create. The VED is scasled up to discourage the purchase of new grand polluters and the fuel duty provides a cost based on fuel burnt, i.e. CO2 created.
The roads are funded by general and local taxation which is paid by everybody including those who don't use the roads (unless they get paid less than the various tax thresholds.

Road tax and fuel duties contribute more to the exchequer than are spent on roads.
 

Tumbleweed

Member
Joined
17 Apr 2013
Messages
189
Thanks. So at the moment, there is no official confirmation of either the delays, their causes, nor of possible outcomes.
--- old post above --- --- new post below ---


If anything, based on the current NR documents, the project for DC-AC conversion for the electric spine has progressed.
--- old post above --- --- new post below ---


Current capital investment in rail is about £2B per annum; a slight increase over CP4.
--- old post above --- --- new post below ---
A little off topic, but a key milestone has been achieved at Reading:

Reading viaduct ready for tracklaying:
http://www.railwaygazette.com/news/...ew/reading-viaduct-ready-for-tracklaying.html


Thanks for that but in The welsh government things still haven't moved on from the 1960's unfortunately.
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
The discussion was about what the Wales Government chooses to spend its capital allowance on, not the UK government. The discussion is not a general one about road vs rail.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,019
Location
St Albans
Road tax and fuel duties contribute more to the exchequer than are spent on roads.

That may be but the cost to the nation of (fossil fuel powered) road users' activities goes way beyond the amount spent on new tarmac, concrete and repairs. It has major impacts on health, the natural environment, food and water supplies etc.. The road building and maintenance bit comes from general taxation and council tax collected from the population whether they use the roads for travel or not. That's why the roads are also provided for non-polluting modes of transport, (there has been no 'road tax' since 1937).
Of course, all consumers pay in respect of road delivered goods that they themselves use.
 

Olaf

Member
Joined
29 Mar 2014
Messages
1,054
Location
UK
That may be but the cost to the nation of (fossil fuel powered) road users' activities goes way beyond the amount spent on new tarmac, concrete and repairs. It has major impacts on health, the natural environment, food and water supplies etc.. The road building and maintenance bit comes from general taxation and council tax collected from the population whether they use the roads for travel or not. That's why the roads are also provided for non-polluting modes of transport, (there has been no 'road tax' since 1937).
Of course, all consumers pay in respect of road delivered goods that they themselves use.

I'm not bothered about pollution or the the environment; costs for roads are covered by the road user. Local taxes cover maintenance of local roads, but not new build.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,272
These calculations about road transport are the kind of thing where you can obtain whatever result you want.
All we can say is a lot is spent on roads and road related externalities and a lot of income is raised by VED and fuel duty.

That is about it.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,032
I'm not bothered about pollution or the the environment; costs for roads are covered by the road user. Local taxes cover maintenance of local roads, but not new build.

...so you are looking forward to the permanent closure of the line at Dawlish. <D
 

SamYeager

Member
Joined
20 Mar 2014
Messages
352
This thread is supposed to be about Great Western Electrification. <( Please take your squabbling about non railway transport elsewhere.
 

CAF397

Member
Joined
15 Sep 2010
Messages
1,095
Location
Lancashire
I went from Reading to Oxford on Friday. I must admit it made me laugh seeing miles and miles of trackside, then a dozen or so masts, then nothing for miles, then a few more masts and prep work. I'm sure there's method in the madness, but looked so silly.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,615
Location
Hampshire
More to do with the Reading Station area than GWML electrification as such, but track is now being laid over the Reading Viaduct with a pair of Colas's 70s sat up there this week - Work is starting on installing the masts shortly, although as we've seen with other new viaduct installations this shouldn't take as long as starting from new. The first beams over Cowley Bridge Road for the Festival Chord are also being put in place at the moment as well.
 
Last edited:

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,239
The first beams over Cowley Bridge Road for the Festival Chord are also being put in place at the moment as well.

Suggested in Dave Creasy's flickr photo stream that those are actually the last beams over Cow Lane that have been placed within the last week:

https://www.flickr.com/photos/52834510@N00/14964097720/in/photostream/

...and many other 'adjacent' photos show nearly all the Festival line viaduct beam sections in place. The Festival viaduct only has 6 longitudinal spans, and of course is only single track width, so uses only 4 beams per span, compared to the main viaduct's 7 per span with 30 or so sections along the length. What's probably happened is that they've been able to install the whole lot for the Festival viaduct in one short period, once all the piers were ready, as relatively speaking it's a much smaller job.

Immediately west of Cow Lane the viaduct ends, it is a reinforced earth ramp between concrete side panels along that section as far as the Festival line box underpass.
 
Last edited: