Are the Thames Valley branches actually committed or are we just hoping they will be?
Committed in terms of HLOS I imagine they will be in the final determination.
Are the Thames Valley branches actually committed or are we just hoping they will be?
Well there was the Class 456... but that is a DC unit...
Committed in terms of HLOS I imagine they will be in the final determination.
Didcot to Reading are the first main stretch to get done, along with Reading Station. I am unsure about the rest, but phase 2 I imagine will be Reading - Airport Junction
I dont seriously believe they will build a 2-car EMU and create a nonstandard fleet unit or units just for a single branch line.
Was expecting they'd rather have a couple of 3-car AC-only 319 unit (should be fairly easy to convert) and modify the Bourne End track layout a bit. a 3-car 20m-per-vehicle unit is only 15 metres longer than a 2-car Cl.165
Piling for OLE masts between Didcot and Reading seems to have started in earnest this week.
There's been bits and bobs of the piling done for quite a while - areas round Pangbourne were done in the summer. The HOOP train is just for installing the masts and wires isn't it? All the preliminary groundwork will be done in advance AFAIK.
A piling rig, with two MPVs with Movax vibro piling heads, which literally vibrate the steel piles into the soil, 2 pile carrying wagons, and finally a Fambo hydraulic percussion hammer MPV for tougher ground.
An excavation and concrete batching consist. This will feature an Hitachi excavator plus a Kniele concrete unit which will mix concrete from onboard aggregate, cement and water tanks.
A structures consist, which will erect the Series One masts, portal booms and twin track cantilevers. It is intended to carry 30 masts for erection, per night.
Ancillary conductor consist, which will install the earthing wires, return wires and small parts such as registration arms and other equipment.
The contact and catenary consist, which will string up the remaining wires, under tension. Another unit install other articles such as contenary wires under low bridges, neutral sections and record information such as height and stagger.
http://www.networkrailmediacentre.c...s-off-Great-Western-electrification-1e0d.aspx
Can't remember if this has already been asked but will the OHLE between Paddington and Airport Junction need upgrading? Presumably it wasn't built to deal with the number of trains Crossrail will bring?
NR's plan was to test the HOPS gear on the High Marnham test track in Notts, before letting it loose on the GW.
I don't think that has happened yet.
NR's plan was to test the HOPS gear on the High Marnham test track in Notts, before letting it loose on the GW.
I don't think that has happened yet.
Rail Engineer said:The process to electrify the Great Western main line (GWML), which started in 1977, is now materialising.
Did it? I wasn't aware of any actual work done prior to electrification for Heathrow in the 90's. If they're talking of plans, then IIRC the GWR looked into it which would have been rather earlier!
The GWR proposal in 1938 related to the main line from Taunton to Penzance and the Devon and Cornwall branches. Those that were not wired (3000v DC overhead was proposed) were intended to be diesel-worked to eliminate steam traction in the region.
Apart from the various steep climbs on the route, the GWR was concerned about the price of coal and the cost of transporting it from South Wales pits to depots in the South West, but they decided the scheme was too expensive, so it got no further than the study stage.
Did it? I wasn't aware of any actual work done prior to electrification for Heathrow in the 90's. If they're talking of plans, then IIRC the GWR looked into it which would have been rather earlier!
I believe the LT Central Line extension to West Ruislip was technically part of the GWR and so the only part of their system to actually be electrified!
But I suppose it will have been transfered to the London Transport Passenger Board (or whatever it was called at the time) prior to electrification, so not part of the GWR system per se.
The H & C line to Hammersmith is a former Great Western Railway line, I believe.
But I suppose it will have been transfered to the London Transport Passenger Board (or whatever it was called at the time) prior to electrification, so not part of the GWR system per se.