swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
Would a good test route for the two have been Weymouth-Poole? it would have had the side effect of doing away with the unit length restriction on that stretch and wouldn't have been too disruptive had it gone tits up

No it wouldn't have been. And the unit length restriction you keep going on about doesn't affect the currently required service capacity. Longer trains can run in an emergency.

You are treating this as a major limitation of the system, but it really isn't.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,267
Would a good test route for the two have been Weymouth-Poole? it would have had the side effect of doing away with the unit length restriction on that stretch and wouldn't have been too disruptive had it gone tits up

I would have preferred a currently unelectrified section of railway - rather than possibly one of the newest of the third rail systems. I imagine some of the original capital equipment is still in place and not life expired in that section.

I was imagining something like a Manchester area electrification - either to Marple and Rose Hill Marple by both routes, or if that would be too disruptive in case of problems, then Hazel Grove to Buxton.

As its primary value would be to allow any problems to be worked out it would not have to necessarily be a route with an overwhelming case for electrification.
If GWML electrification had to proceed in the meantime then the first 'phase' of it should have been conducted with ECML-style Mark 3B or the Furrer and Frey kit from GEML.
 
Last edited:

SpacePhoenix

Established Member
Joined
18 Mar 2014
Messages
5,491
I would have preferred a currently unelectrified section of railway - rather than possibly one of the newest of the third rail systems. I imagine some of the original capital equipment is still in place and not life expired in that section.

I was imagining something like a Manchester area electrification - either to Marple and Rose Hill Marple by both routes, or if that would be too disruptive in case of problems, then Hazel Grove to Buxton.

As its primary value would be to allow any problems to be worked out it would not have to necessarily be a route with an overwhelming case for electrification.
If GWML electrification had to proceed in the meantime then the first 'phase' of it should have been conducted with ECML-style Mark 3B or the Furrer and Frey kit from GEML.

Maybe Exeter-Waterloo?
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,267
Maybe Exeter-Waterloo?

DC conversions/integrations raise a whole host of other problems beyond those normally experienced in these projects.
And Exeter-Basingstoke is hardly a small scheme.
Don't run before you can walk.

You want an out of the way relatively simple scheme with relatively small stakes - over a relatively small distance so if it all goes belly up it can't bankrupt you or seriously screw your budgetary projections.
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
Well, they may as well implement the whole works to completion at 140 mph now. I wrote earlier that, as it is unlikely that the GWML will ever have an HSL duplicate, like the WCML, then it should be future proofed for much higher speeds, which is why I think much more 4 tracking will be needed. I think the argument about third rail could have been relevant where the 'locals' are separate from the main line, like Euston to Watford and this is in discussion on the Liverpool expansion thread.

HYN to all, over and out for 2016 from HGWR. :)
 
Last edited:

D6975

Established Member
Joined
26 Nov 2009
Messages
3,045
Location
Bristol
DC conversions/integrations raise a whole host of other problems beyond those normally experienced in these projects.
And Exeter-Basingstoke is hardly a small scheme.
Don't run before you can walk.

You want an out of the way relatively simple scheme with relatively small stakes - over a relatively small distance so if it all goes belly up it can't bankrupt you or seriously screw your budgetary projections.

One of the infill/branch electrifications in the offing would probably have been the best idea = short distance but of real benefit short term as well as long term.
Blackpool N perhaps, or Neville Hill-Colton Jn?
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,897
Location
Mold, Clwyd
One of the infill/branch electrifications in the offing would probably have been the best idea = short distance but of real benefit short term as well as long term.
Blackpool N perhaps, or Neville Hill-Colton Jn?

The logical place would have been part of the TV4 section of the WCML, where there are trains capable of testing it at 140mph.
Virgin could then exploit the Pendolino 140mph capability (or whatever speed NR will allow above 125mph).
There's no point in Series 1 wiring of a branch line which will never exceed 100mph.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,267
The logical place would have been part of the TV4 section of the WCML, where there are trains capable of testing it at 140mph.
Virgin could then exploit the Pendolino 140mph capability (or whatever speed NR will allow above 125mph).
There's no point in Series 1 wiring of a branch line which will never exceed 100mph.

But that would involve ripping down overhead wiring and replacing - so you spend the money for effectively no purpose.
The purpose of the project is not to test the equipment at high speed as such, it would be to demonstrate that the installation and commisioning techniques work properly and as efficiently as had ben forecast.
 

QueensCurve

Established Member
Joined
22 Dec 2014
Messages
2,195
But that would involve ripping down overhead wiring and replacing - so you spend the money for effectively no purpose.
The purpose of the project is not to test the equipment at high speed as such, it would be to demonstrate that the installation and commisioning techniques work properly and as efficiently as had ben forecast.

I suppose the point is that NR could have specified OHLE to a new standard when TV4 was implemented rather than modify it later.

That opportunity was not taken at the time. Perhaps it was recognised as a threat.
 

TheKnightWho

Established Member
Joined
17 Oct 2012
Messages
3,183
Location
Oxford
Presumably once the remaining sections get round to being electrified sometime well into the next decade, all this "experience" will have moved on to other jobs, and everything will have to be learnt again.

Though somehow this did not seem to apply to the ECML electrification, which was the first major overhead project for a long period. Perhaps they didn't feel the need to employ multiple tiers of highly-paid consultants to give advice on how to do it "efficiently".

???

There were loads of issues at the start of ECML wiring. Your rose-tinted glasses are showing.
 

dgl

Established Member
Joined
5 Oct 2014
Messages
3,039
Also doing Bournemouth to Weymouth as a trial would require alterations to the class 440/450 fleet for 25kv operation, not worth the extra weight on an already weighty EMU for that short of section (~30 miles iirc).
 

SpacePhoenix

Established Member
Joined
18 Mar 2014
Messages
5,491
Also doing Bournemouth to Weymouth as a trial would require alterations to the class 440/450 fleet for 25kv operation, not worth the extra weight on an already weighty EMU for that short of section (~30 miles iirc).

The "extra" weight is probably already onboard in the form of a concrete block. The manufacturers fit concrete blocks instead of the transformer for DC units so they can use all the same bogies and suspension
 

QueensCurve

Established Member
Joined
22 Dec 2014
Messages
2,195
Also doing Bournemouth to Weymouth as a trial would require alterations to the class 440/450 fleet for 25kv operation, not worth the extra weight on an already weighty EMU for that short of section (~30 miles iirc).

Without implying that they project is a viable one, are there not some Class 350s already equipped for DC operation?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
The "extra" weight is probably already onboard in the form of a concrete block. The manufacturers fit concrete blocks instead of the transformer for DC units so they can use all the same bogies and suspension

The weights shown in the P5 books suggest this isn't done on Siemens units. A comparison of the otherwise identical 350/1s and 450s shows the relevant vehicle is about 6 tonnes heavier in the 350/1
 

Quark999

Member
Joined
19 Feb 2016
Messages
15
Because I have not seen it mentioned - just east of Taplow station the first bit of auto transformer wire has appeared on the relief lines...
 

ic250

Member
Joined
3 Apr 2014
Messages
60
This may have already been noted, but the first few yards of the Windsor branch have also been wired out of Slough. The corresponding platform has not yet been wired, however.
 

SWT_USER

Member
Joined
29 Aug 2010
Messages
1,176
Location
Ashford Middx
Is the signal failure this morning related to any of the work done over Christmas? Supposed to be the first day of service for almost two weeks and the morning peak service from Hanwell is cancelled :roll:
 

leomartin125

Member
Joined
15 Nov 2015
Messages
1,058
Location
North West
This may have already been noted, but the first few yards of the Windsor branch have also been wired out of Slough. The corresponding platform has not yet been wired, however.

That was completed a while back now, as was the first few yards of the Marlow branch, with platform 5 now electrified at Maidenhead (minus the A/T wires). I have also noticed the Up/Down Main lines at Maidenhead now have auto transformer wires, whilst the Up/Down Relief do not yet.
 

ANP1990

Member
Joined
31 May 2016
Messages
41
Not sure if it's been mentioned:
- The wires have gone up over the West Ealing sidings, and it appears that the signalling has been put in as well.

- It looks like Network Rail have dug up one of the lines approaching old oak common (east of the fly over). From the remaining track and OHLE, it looks like it will be reinstated at some point.
 

ScotGG

Established Member
Joined
3 Apr 2013
Messages
1,585
I see in Modern Railways that the French are wiring 127 km on a route out of Paris. Total budget of 300m Euros, or about £250 million.

Why is there always such a big discrepancy?

Do they not have the silly overhead allowance rule meaning over engineering all structures? A rolling program so everything not done from scratch?

It includes 6,000 OHLE masts, 320km of catenary wire and 160km of signal cables
 
Last edited:

furnessvale

Established Member
Joined
14 Jul 2015
Messages
4,897
I see in Modern Railways that the French are wiring 127 km on a route out of Paris. Total budget of 300m Euros, or about £250 million.

Why is there always such a big discrepancy?

Do they not have the silly overhead allowance rule meaning over engineering all structures? A rolling program so everything not done from scratch?

It includes 6,000 OHLE masts, 320km of catenary wire and 160km of signal cables

Does it mention how many structures are being rebuilt to provide clearances?
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,897
Location
Mold, Clwyd
That's still £1m per stkm (assuming double track), which is still much higher than the NR RUS figures.
Seems to include resignalling though.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,267
I see in Modern Railways that the French are wiring 127 km on a route out of Paris. Total budget of 300m Euros, or about £250 million.

Why is there always such a big discrepancy?

Do they not have the silly overhead allowance rule meaning over engineering all structures? A rolling program so everything not done from scratch?

It includes 6,000 OHLE masts, 320km of catenary wire and 160km of signal cables
DO we know the route in question (which will tell us about structure requirements)? Is this a 25kV scheme? Lines going south out of Paris are mostly (if not high speed) electrified at 1500V which would have drastically reduced clearances. On pair with the old BR-era 'Special Reduced' 150mm clearance.
 

D1009

Established Member
Joined
22 Feb 2012
Messages
3,166
Location
Stoke Gifford
DO we know the route in question (which will tell us about structure requirements)? Is this a 25kV scheme? Lines going south out of Paris are mostly (if not high speed) electrified at 1500V which would have drastically reduced clearances. On pair with the old BR-era 'Special Reduced' 150mm clearance.
It's from Paris Gare de L'Est to Troyes, the first 38.3 km to Gretz-Armainvilliers is already electrified for RER services. It's at 25kV.
 

furnessvale

Established Member
Joined
14 Jul 2015
Messages
4,897
DO we know the route in question (which will tell us about structure requirements)? Is this a 25kV scheme? Lines going south out of Paris are mostly (if not high speed) electrified at 1500V which would have drastically reduced clearances. On pair with the old BR-era 'Special Reduced' 150mm clearance.

Without digging out my old blue book, I didn't think there was a great deal of difference in clearances between 25Kv AC and 1500v DC, given the propensity for DC current to jump greater distances (or so I was told).
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,267
Without digging out my old blue book, I didn't think there was a great deal of difference in clearances between 25Kv AC and 1500v DC, given the propensity for DC current to jump greater distances (or so I was told).
HMRI/ORR gives a normal minimum static electrical clearance of 150mm for 1500V.
The normal minimum for 25kV installations is now 370mm or so.
 

D1009

Established Member
Joined
22 Feb 2012
Messages
3,166
Location
Stoke Gifford
I see in Modern Railways that the French are wiring 127 km on a route out of Paris. Total budget of 300m Euros, or about £250 million.

Why is there always such a big discrepancy?

Do they not have the silly overhead allowance rule meaning over engineering all structures? A rolling program so everything not done from scratch?

It includes 6,000 OHLE masts, 320km of catenary wire and 160km of signal cables
I would imagine the larger loading gauge gives more room for equipment and probably reduces costs. I'm not aware the French have been doing much in the way of electrification of existing routes, though they have been building new railways.
 