andy33gmail
Member
Does anyone have any insight into what was going on yesterday? There seemed to be 4 unrelated issues
1. In the morning, there were no trains (except freight) North of Cambridge on the Lynn line, as a result of a person sadly being hit by a train
2. When services were restored, I got a train from Littleport, which without warning stopped at Cambridge, with no announcement. A member of staff then walked down the train kicking everyone off. A station announcement said it was because “the driver was unavailable” but didn’t advise what to do. The dispatcher pointed people to a Thameslink St Pancras train
3. That night, the KGX train was due to terminate at Ely and be replaced with a peasant wagon due to engineering works
4. However, when passing about Cambridge South, the driver made around 12 announcements (some automated) saying he had a cab fault and had to stop. To be fair, the station staff were very efficient organising taxis
I can’t work out if any of these are linked. For example might the driver have continued working after operating the accident train, then decided he couldn’t? Or perhaps all the trains ended up in the wrong place & it made sense for it to turn back to re-jig. Was a defective train rushed into service to replace the incident train?
1. In the morning, there were no trains (except freight) North of Cambridge on the Lynn line, as a result of a person sadly being hit by a train
2. When services were restored, I got a train from Littleport, which without warning stopped at Cambridge, with no announcement. A member of staff then walked down the train kicking everyone off. A station announcement said it was because “the driver was unavailable” but didn’t advise what to do. The dispatcher pointed people to a Thameslink St Pancras train
3. That night, the KGX train was due to terminate at Ely and be replaced with a peasant wagon due to engineering works
4. However, when passing about Cambridge South, the driver made around 12 announcements (some automated) saying he had a cab fault and had to stop. To be fair, the station staff were very efficient organising taxis
I can’t work out if any of these are linked. For example might the driver have continued working after operating the accident train, then decided he couldn’t? Or perhaps all the trains ended up in the wrong place & it made sense for it to turn back to re-jig. Was a defective train rushed into service to replace the incident train?