It's a similar comparison to the North Staffs line at Harecastle Tunnels, south of Kidsgrove. There were three tunnels, including the most substantial being a mile long. Come electrification in the 1960s and they were abandoned for a diversion just to the west, where a fairly obvious route through an adjacent, closely parallel valley was available. Why ever not go that way to start with.
That might be referring to the 2008 study carried out for a proposed wind farm...?Regarding Penmanshiel, in a 2009 thread on LNER.info someone says there is a technical geological study at http://www.geolsoc.org.uk/page4872.html. Unfortunately that page isn't there any more, neither Google nor the site's own search function find any instances of the word "Penmanshiel" on geolsoc.org.uk at all, and whatever sod runs the site has blocked archive.org from recording it so there is nothing to be found there either. Nor does the LNER thread mention the actual title of the article to search for it directly, nor give any other clue. Is there by any chance anyone here who might still know how to find it?
This section sets out the methodology and findings of the assessment of the effects on hydrology and hydrogeology of the construction, operation and decommissioning of the proposed Penmanshiel Wind Farm. ‘Hydrology’ relates to surface water processes and features, whereas ‘hydrogeology’ refers to groundwater. A summary of the underlying geology is provided for context for the hydrology and hydrogeology. The existing state of the site is assumed to represent the baseline environment.
As was tragically proved when the enlargement works were attempted.To be honest, its probably some of the more difficult stuff to tunnel through in the UK in terms of building a stable tunnel. Its about as far away from London Clay as you can get in terms of suitability!
This must be one of the few places where a railway has taken over the former alignment of a road, rather than vice versa.The A1 was also repositioned to make room for the diversion.
I recall travelling on non-stop Edinburgh to Euston service during that period. At least, my recollection was that it was non-stop, but Edinburgh - Carstairs would not be electrified for another ten years, so I must be mistakenDiversion was via Carlisle (with a few continuing to Euston) or a bus from Berwick to (?) Dunbar.
The original line through the tunnel was 60 mph in Deltic days, the new alignment was 60 mph but has been upped to 70 mph.I remember travelling through the tunnel on 24th February 1979 on an excursion train, I feel there was a speed restriction on then because I was window hanging. RIP.
I travelled from Carlisle (ex Euston) to Aberdeen in daytime which was unheard of at that time. I think we went straight on at Carstairs to Mossend but can't recall passing through Perth. Does anybody know?I recall travelling on non-stop Edinburgh to Euston service during that period. At least, my recollection was that it was non-stop, but Edinburgh - Carstairs would not be electrified for another ten years, so I must be mistaken
Going via Carstairs would have involved a reversal in the station with a new loco coming onto the rear and taking the train south leaving the other loco behind in Carstairs platform. The ECML trains may not have been able to be covered by the number of electric locos available and so retained diesel haulage.As was tragically proved when the enlargement works were attempted.
== Doublepost prevention - post automatically merged: ==
This must be one of the few places where a railway has taken over the former alignment of a road, rather than vice versa.
== Doublepost prevention - post automatically merged: ==
I recall travelling on non-stop Edinburgh to Euston service during that period. At least, my recollection was that it was non-stop, but Edinburgh - Carstairs would not be electrified for another ten years, so I must be mistaken
I also did 1 return Edinburgh - London journey - southbound on 27/03/79, when my notes suggest we were diesel-hauled to Carlisle for 81 006 forward (09.53 ex Edinburgh, scheduled for about 5 1/2 hours to Euston). My memory is of "Deltic over Beattock" - but that is probably wishful thinking on the part of an 11-year-old - I would love to know what was on the front. The return on 05/04 seems to have changed locos (from 86 008) at Carstairs (again - how much I would like to know what took over!), but I'm not over confident in the accuracy of my scribblingsI recall travelling on non-stop Edinburgh to Euston service during that period. At least, my recollection was that it was non-stop, but Edinburgh - Carstairs would not be electrified for another ten years, so I must be mistaken
I have a photo somewhere of an A4 passing the cut out 60 mph sign at the south end. Would be about 1962/3.The original question comes up here periodically, maybe near the date of collapse (17/3). My recollection is that on the last occasion landowner refusal was offered as the most likely reason, but who knows?
Re. the limit in the tunnel, in 1965 I came from London to Edinburgh on a business trip (the day after the Ferrybridge tower collapse, the truncated profile was evident to the west) and the noise when passing through was terrific, it certainly sounded more than 60 mph.