TT-ONR-NRN
Veteran Member
Not unless it terminated at Doncaster. Too slow to go further north with how busy the Northern ECML now is.Sounds like it could be ideal work for the Class 68 + Mk.5 sets soon to be withdrawn by TPE.
Not unless it terminated at Doncaster. Too slow to go further north with how busy the Northern ECML now is.Sounds like it could be ideal work for the Class 68 + Mk.5 sets soon to be withdrawn by TPE.
Other than the fact the XC are apparently about to do the same thing.If approved I think this will be the only UK passenger rail service to cover Wales, England and Scotland in a single journey, impressive and very much needed!
The North West already has a connection to Cardiff (hourly from Manchester Piccadilly) and TfW Rail's planning one every other hour between Liverpool and Cardiff whilst Newcastle and Sheffield don't have a connection to Cardiff. Via the WCML it would still be around six hours each way - too long to realistically go from Cardiff to Edinburgh and back in a day - so an extra hour for better connectivity with Yorkshire and the North East seems a fair trade.It would be ludicrous not to send it via the west coast it provides connections for the north west towards south wales and will be a much faster direct route
Indeed. It would have been far better as Plymouth to Edinburgh via the WCML. Cardiff as you say is well connected to the North West, and has two trains per hour to Birmingham. It isn't even a massive city. Meanwhile the far south west has to make do with hourly 4 car voyagers North. Linking the greater southwest with the North West and Scotland would be transformational. This proposal, from Cardiff, and via the ECML just looks like a waste of time and capacity to me.The North West already has a connection to Cardiff (hourly from Manchester Piccadilly) and TfW Rail's planning one every other hour between Liverpool and Cardiff whilst Newcastle and Sheffield don't have a connection to Cardiff. Via the WCML it would still be around six hours each way - too long to realistically go from Cardiff to Edinburgh and back in a day - so an extra hour for better connectivity with Yorkshire and the North East seems a fair trade.
Even though his ideas are often questionable, Yeowart would know that the WCML was incredibly unlikely as even more abstractive.It would be ludicrous not to send it via the west coast it provides connections for the north west towards south wales and will be a much faster direct route
XC have apparently been considering (but not actually doing) many things when open access competition is mooted.Other than the fact the XC are apparently about to do the same thing.
It would also be good news for Gloucester to have these direct services to the north-east along with Cardiff.
I do however think that a direct Cardiff to Edinburgh service via The Marches (Hereford) would be a good idea as this is the shortest/quickest route. Through ticket prices between south Wales and Edinburgh are ridiculous whichever way people travel. Air fares between Cardiff & Edinburgh are also high and therefore most people travel with Easyjet between Bristol & Edinburgh.
Worth remembering Cardiff is a regional hub for all of south Wales including Swansea and towns further west as well as the valleys with a population on its own nearly 100,000 larger. Without counting the metro area or Swansea, I'd hardly call this pie in the sky or a complete waste, actually makes as much sense as the Aberdeen-Penzance routeIndeed. It would have been far better as Plymouth to Edinburgh via the WCML. Cardiff as you say is well connected to the North West, and has two trains per hour to Birmingham. It isn't even a massive city. Meanwhile the far south west has to make do with hourly 4 car voyagers North. Linking the greater southwest with the North West and Scotland would be transformational. This proposal, from Cardiff, and via the ECML just looks like a waste of time and capacity to me.
I agree Penzance to Aberdeen is pretty daft also. Plymouth and Edinburgh are perfectly fine for onward connections west or north. The issue is the south west beyond Bristol is now hourly 4 car voyagers and yet serves a larger catchment than South Wales, and fewer travel possibilities. But as I said, it would really need to run via WCML to make it worthwhile as quite a few travel to the likes of Liverpool and Manchester, but more services to Darlington and Derby from the SW probably aren't needed.Worth remembering Cardiff is a regional hub for all of south Wales including Swansea and towns further west as well as the valleys with a population on its own nearly 100,000 larger. Without counting the metro area or Swansea, I'd hardly call this pie in the sky or a complete waste, actually makes as much sense as the Aberdeen-Penzance route
Well, a mix of 4-cars (6 or 7 services), 5-cars (5 or 6 services) and 8-cars (3 services). Granted it doesn't really seem sufficient, regardless.The issue is the south west beyond Bristol is now hourly 4 car voyagers and yet serves a larger catchment than South Wales, and fewer travel possibilities.
Sounds like it could be ideal work for the Class 68 + Mk.5 sets soon to be withdrawn by TPE.
But currently changing at Birmingham New Street's only ~25 minutes longer for Cardiff to Manchester than the direct service (with a fifteen minute connection), so apart from Crewe being an easier change going via the WCML would only really benefit Warrington, Wigan, Preston, Lancaster and Carlisle whilst significantly disadvantaging Derby, Sheffield, Doncaster, York and Newcastle (they're not planning on serving Darlington).But as I said, it would really need to run via WCML to make it worthwhile as quite a few travel to the likes of Liverpool and Manchester, but more services to Darlington and Derby from the SW probably aren't needed.
Unsuprisingly they are going after the XC Birmingham to Cardiff and Bimringham to Sheffield flows.It copies the XC routing. Will fail abstraction massively unless they avoid New St and go Camp Hill.
Cardiff only has 1 direct train an hour to Birmingham.Indeed. It would have been far better as Plymouth to Edinburgh via the WCML. Cardiff as you say is well connected to the North West, and has two trains per hour to Birmingham. It isn't even a massive city. Meanwhile the far south west has to make do with hourly 4 car voyagers North. Linking the greater southwest with the North West and Scotland would be transformational. This proposal, from Cardiff, and via the ECML just looks like a waste of time and capacity to me.
There’s already adequate capacity on the Northern WCML and there is barely any population between Preston-Edinburgh.It would be ludicrous not to send it via the west coast it provides connections for the north west towards south wales and will be a much faster direct route
Trouble is most of this capacity is only accessed with a change in London (involves Tube, Taxi or Bus) or the dreaded Birmingham New Street. Most of the country doesn't get direct trains to the WCML destinations. That's why someone, be it XC or OA need to be allowed to serve the west side of Britain.There’s already adequate capacity on the Northern WCML and there is barely any population between Preston-Edinburgh.
Is there a suitable locomotive to swap out the 68's for? Somehow I doubt it.It's been stated above that they are only 100mph so would be hard to path on the ECML.
The only sensible option for this service, if you call it sensible at all, is new 80x.
Not to UK loading gauge, but should be possible to take the tried (and they work) components from European loco and build batch to UK size. There are various designs rated for 200-220 km/h (124-136mph)Is there a suitable locomotive to swap out the 68's for? Somehow I doubt it.
I doubt there is a (long enough) rail journey possible in Britain that would make an avoidable loco swap preferable to electrodiesel equipment.For very long journeys might be more efficient to swap traction at Doncaster than have dual mode with deadweight diesel on the 450 mile round trip from Doncaster to Edinburgh and back again on electric.
Pendolinos to Holyhead continued until 2012. It isn't such a foreign concept in fairness.I doubt there is a rail journey possible in Britain that would make an avoidable loco swap preferable to electrodiesel equipment.
But I very much doubt this proposal will go anywhere regardless
class 91 anyone? [ducks for cover]Is there a suitable locomotive to swap out the 68's for? Somehow I doubt it.
I'm sure the couplers could be molded, but that's not the issue.class 91 anyone? [ducks for cover]
Along the same lines of a 57 dragging a 390, could a 68 drag a 397?
oversight or deliberate to keep the costs down? Never envisaged probably.a 397 might not even be configured to take an outside ETS supply.
I would think never envisaged.oversight or deliberate to keep the costs down? Never envisaged probably.