Well they won't be. GC have bought their own fleet of powercars and are committed to overhauling those. It's going rather well actually.
Hmm how do you interpret over a year late as "going rather well actually"?
I seem to remember that Grand Central went for the HSTs on the basis that 222s wouldnt be able to start services untill late 2007!
If I had a spare saturday I'd take a day trip down to Plymouth to have a look at the hst in DML!
lol You got no chance, unless you work for DML, & have full security clearance.
Mart

Er, yeh ok lol.
Mart
Hmm how do you interpret over a year late as "going rather well actually"?
I seem to remember that Grand Central went for the HSTs on the basis that 222s wouldnt be able to start services untill late 2007!
If I had a spare saturday I'd take a day trip down to Plymouth to have a look at the hst in DML!
Sorry, on a need to know basis, & you don't need to know. If you look on my mini profile to the left, it gives you a rough idea where I am, in view of Laira depot.
Mart
i didnt ask 'how they would be crammed in' i said 'wedged in'
if i wanted to know how they get passengers on the train, i would have asked ' how will they be crammed in'
but thanks for the info.
how long would it take to clear a set at sunderland then?
you seem to be the man in the know
im surprised gner dont extend newcastle trains to wearside, like they do at leeds-bradford

apology accepted
TPE used to extend to sunderland, was it the metro that saw to its demise do you think?
I'd personally say that heavy testing is really not needed seeing as it's all based on currently existing stock (Mk3 LHCS/HST). The only potential issue I can see is the multiple working wiring between power cars on either end of the stock.
20 days though to train people up on the stock is slightly unrealistic - it's all dependant on how much training has already been done and previous knowledge (if they were with a TOC before) on their licence to operate trains.
Just found out today that the 1st GC set will be delivered in the 1st week in august,probably the 8th or thereabouts.The other 2 sets will be delivered soon after.The 1st set is to be used for the remainder of staff training such as CDL training etc.:grin:
If Grand Central services are starting in September why arent Grand central selling tickets?
http://www.grandcentralrail.com/tickets.html
The trainline suggests that GNERs lowest price advance has already sold out for Sunderland to London on 1.10.07 but no GC fares are available????