Pathfinder
Member
damn right we are!!hock:
Not looking good though is it mate after reading jb95's post !
damn right we are!!hock:
Pathfinder, Perhaps you are confusing a Fleet Engineer (bloke at top - not much clue of day to day problems on refurbs and seeking limelight) with Depot Engineer (bloke fed up with delays on-site thats doing refurb work) - this means - Mr Shipley will be more focussed on 'new build' projects for Sovereign Trains such as Polaris, Pacemaker (is that a good name for a train?) and Potenta and abroad a lot - you may be interested in his webcast entitled 'The Introduction of New Low Cost DMUs to the UK' coming to IETV - funny, no mention of the webcast on 'decent places to spend the night in Stoke'. But seriously (actually that was serious) there should have been an engineer on-site right from the start of the project, there is at other refurb depots, or at least 3 times a week visits to 'keep the boys keen'
Association of Locomotive ENGINEERS and footplatemen ring a bell? You should be able to fix it yourself!! Only joking Path, my Dad was a Driver and I've had to propel a few units myself, so respect to you for that - I just think the whole GCR thing has gone pear-shaped and its unfair to the public and the spotters too, everyone else concerned with it gets paid for waiting or downtime - you wouldn't allow that to happen if you held the purse strings would you? Or at least you'd have put a few things in place to protect yourself
As has been mentioned, the paths are for 125mph running and anything less would have been refused. I get the impression from people involved with Mk3 maintenance at the moment that this shortage was rather unexpected (taking into account the general rundown of the Mk3 loco hauled fleet, the manufacturers/reconditioners had not bargained for this revival and therefore hadn't planned for such high demand) and therefore, while a bit of forward planning would have probably paid off, Marcroft aren't entirely to blame for this.37402, the funny thing is that no-one mentioned Bogies as a problem at Marcroft - I'm not sure of the Operational deal struck, but you could run with a 110mph restriction in place on the Power Cars - a bit like Pendolinos and Voyagers having a higher design speed than they actually do - I know the EC route is faster but it doesn't mean they have to do 125mph does it? Having said that I'm also unsure if its possible to uprate an existing BT10 to BT10B, if it is maybe the parts needed to upgrade them are available, so they have no problem - dunno about this one but as I say it wasn't mentioned as a problem
Also seen it on RailChat!!
Maybe, but Wabtec have been doing it a lot longer so there is less of a learning curve.The plot thickens!!
According to our drivers this morning, when they were at Doncaster doing traction, Wabtec were turning coaches round in a week, doing pretty much what Marcroft/ESG are doing to them...
hmm, yes I suppose the Mk3s are 30 odd years old!!
Our MD was up at Heaton today, not had his verdict yet!!
I would have thought that the "refurbishment" details would have been quite specific, and that the coaches as specified would each have its own requirements for work to be carried out
Even if basic things like the mirrors have been overlooked, and not included in the specifics, then that is hardly the fault of the contractor
However, they may be replaced as a good will gesture!
Thats fair enough, when is the next power car due to be arriving into Heaton?
Cheers
Andy