DescendingSadly
Member
That doesn't define it much mate 
Is this really the end of an era of Valenta's? :cry::cry:
That doesn't define it much mate![]()
I think that's because GNER/NXEC refused to sell GC tickets :?
Depart: HFX 10:38
Arrive: KGX 13:45
Duration: 3h 7m
Changes: 0
It works if you use the GC website.
Unfortunately yes,1st one goes under the knife in june !!!![]()
I think that's because GNER/NXEC refused to sell GC tickets :?
Depart: HFX 10:38
Arrive: KGX 13:45
Duration: 3h 7m
Changes: 0
It works if you use the GC website.
The GC website isn't showing them to me today.
I think that's because GNER/NXEC refused to sell GC tickets :?
.
Are all the GC 125s valentas?depends on availablilty... could be either HST or 180!!
Quoted from http://www.penaltyfareappeal.co.uk/wordpress/Grand Central was the first to respond and has the following to say
Grand Central Railway apologises to those of its passengers caught up in the disruption in the Hitchin area last night (Sunday).
Owing to a Network Rail signalling problem that caused an East Coast service to become marooned in the non-electrified section of the route near Hitchin (where engineering work was taking place) there was severe disruption to all rail services to London King’s Cross yesterday evening.
The East Coast train had to be assisted out of the affected area by Grand Central’s train. Once this was done, we believed our train would proceed straightaway to Kings Cross. However, once pushed clear of the non electrified area, a technical problem occurred with the stalled train, which consequently blocked our onward journey until a rescue locomotive was summoned to take the affected train forward to London Kings Cross.
This resulted in several services to Kings Cross being delayed for up to four hours, included the Grand Central service from Sunderland.
Taxis were provided for passengers at Kings Cross for onward travel.
Network Rail is mounting an enquiry into the original signal problem and East Coast is mounting an enquiry into the cause of their trains subsequent failure which blocked the line to London.
Grand Central is supporting both these enquiries and will of course be looking at how we can learn from how the events were dealt with from a passenger’s viewpoint.
Meanwhile Grand Central customers involved in this delay are invited to send their tickets to our Customer Services department for compensation of the fare for that leg of the journey.
Once again Grand Central apologises for any inconvenience caused to our passengers, which were exacerbated by the fact that the Grand Central train, in common with the other trains affected were very busy, because train paths were severely limited by the planned engineering work in the Hitchin area.
East Coast has responded as follows:
East Coast apologises to customers whose journeys were delayed on the night of Sunday, 28 February.
In particular, East Coast wishes to apologise to passengers travelling on the 17.50 hrs service from Leeds to London King’s Cross. This train came to a standstill due to a signalling problem near where engineering work was taking place. The journey was further interrupted by a train failure before a rescue locomotive was arranged to allow customers to continue their journeys to King’s Cross, where taxis were provided for onward travel.
The 13.50 hrs service from Aberdeen to London King’s Cross was also seriously delayed as a result.
Under our Delay Repay compensation policy, which is one of the most generous in the rail industry, East Coast will refund the full cost of the rail tickets of passengers who travelled on these two seriously delayed East Coast trains.
Details of how to claim are available online at: http://www.eastcoast.co.uk/about-us/passengers-charter1/Delay-Repay/ or from East Coast stations.
East Coast apologises for the inconvenience caused. An investigation is underway to identify the cause of the technical problem on the 17.50 Leeds to Kings Cross service.
First Capital Connect have responded as follows:
Hello there, I understand the 1750 Leeds to Kings Cross came to a stand en-route to London but you’ll have to confirm that with East Coast. First Capital Connect will be offering double compensation.
depends on availablilty... could be either HST or 180!!
Thanks for that
Valentas are sweet music, must get over and see one on stoke bank before it is too late
I can remember the first ones on stoke bank and there were'nt any of those !!! wires there either oh my age
Let me know which service you plan on getting upto Halifax when you finalise your plansMost likely, also the East Coast website only shows the Anytime fare, even more reason to buy on board.
Whether it's allowed or not is another matter as since when did any TOC put the full range of tickets onto them?
I've been planning my farewell Valenta GC bash in late May/June; hopefully the West Riding services will have started by then so I can go:
AP TPE: Manchester > Newcastle
Metro: Newcastle > Sunderland
GC: Sunderland > Kings Cross
GC: Kings Cross > Halifax (or Doncaster, or Brighouse)
Northern: Halifax > Manchester (or AP TPE)

Many of you will already be aware that there were massive dealys (up to 4 hours?) on the ECML on Sunday night linked to engineering works at Hitchin (already discussed in other threads).
I see that penaltyfareappeal.co.uk asked the 3 operators, GC, EC and FCC to comment on the inconvenience.
Its the contrast between the 3 Operators' reponses that I like:-
Quoted from http://www.penaltyfareappeal.co.uk/wordpress/
Spot the difference?
Well done GC, factual I assume, and I hope the relevant PR and management of other operators will learn a lesson from GC on the value of taking into account global impacts.
When **** flies it will hit everyone around, so be honest, otherwise it will stick.
d
I thought it was run by fcc staff? but fcc treated them badly and I heard one of them left.