Gorton Jct to Guide Bridge masts question

Status
Not open for further replies.

Trackman

Established Member
Joined
28 Feb 2013
Messages
4,260
Location
Lewisham
There's a (long) bridge inbetween Gorton and Guide Bridge, it's only shortish but there are about 40 separate masts inside the bridge.
What's going on?
I have my own theory, just seeing if I can find the definitive answer.
The video is from RUKF's @Don Coffey You Tube channel.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Halish Railway

Established Member
Joined
26 Apr 2017
Messages
2,174
Location
West Yorkshire / Birmingham
I’m assuming that this is in reference to the Mk3 design of single wire registration arms underneath the M60 overbridge, which I believe opened for Motorway traffic in 1998.

I think it was just the easiest way of lowering the wire height of electrification erected in the 1940s/1950s. The registration arms are connected to masts, rather than being suspended from the overbridge to allow the railway to remain operational whilst the Motorway was being constructed.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,856
Location
Beeston (Notts)
I’m assuming that this is in reference to the Mk3 design of single wire registration arms underneath the M60 overbridge, which I believe opened for Motorway traffic in 1998.

I think it was just the easiest way of lowering the wire height of electrification erected in the 1940s/1950s. The registration arms are connected to masts, rather than being suspended from the overbridge to allow the railway to remain operational whilst the Motorway was being constructed.
Also removes the need for disruptive inspections of the bridge from below; if arms were to be installed the traditional way there'd have to be stovepipes installed, tests to make sure the stovepipes wouldn't come loose etc.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,625
Location
Nottingham
The large number of structures is presumably because the clearance is limited so they need to be close together to minimise the wire uplift between them. Normally new bridges on motorways etc provide generous clearances, so I assume there was some reason why they couldn't have made the M60 a bit higher to avoid having to do all this.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,856
Location
Beeston (Notts)
The large number of structures is presumably because the clearance is limited so they need to be close together to minimise the wire uplift between them. Normally new bridges on motorways etc provide generous clearances, so I assume there was some reason why they couldn't have made the M60 a bit higher to avoid having to do all this.
I'll wager it's because the OLE in those parts is still fixed tension.
 