Eagle
Established Member
So I was browsing the Track Access requests on Network Rail's website (which are now accessed via the tiny link that says "documents"), seeing what changes might be coming up at the next timetable when I found Alliance Rail's official application for GNWR.
EustonLeeds/Bradford
EustonBlackpool/Barrow and Carlisle
Basically they seem to be saying they know there's a tenth IC path per hour possible between London and Crewe and they want it reserved for their West Yorks services, and that at the next WCML recast find more slots for their Cumbria services. This seems a bit premature and must be timed to predate the upcoming ICWC refranchising. I'm still unconvinced by their claim to be building all their own ultramodern bimodal tilting trains in time for services in December 2013 (and I still can't work out where the money's coming from).
I would love to see GNWR eventually run these routes at the proposed levels (1tp2h Leeds, 1tp2h Bradford, 5tpd Blackpool, 3tpd Barrow and Carlisle), but this seems to be too much too fast at the moment.
Thoughts? Can they pull this off or are they being way too ambitious?
EustonLeeds/Bradford
EustonBlackpool/Barrow and Carlisle
Basically they seem to be saying they know there's a tenth IC path per hour possible between London and Crewe and they want it reserved for their West Yorks services, and that at the next WCML recast find more slots for their Cumbria services. This seems a bit premature and must be timed to predate the upcoming ICWC refranchising. I'm still unconvinced by their claim to be building all their own ultramodern bimodal tilting trains in time for services in December 2013 (and I still can't work out where the money's coming from).
I would love to see GNWR eventually run these routes at the proposed levels (1tp2h Leeds, 1tp2h Bradford, 5tpd Blackpool, 3tpd Barrow and Carlisle), but this seems to be too much too fast at the moment.
Thoughts? Can they pull this off or are they being way too ambitious?