Saw a 717 leaving Moorgate shortly after 10pm last night... Are they testing new dispatch arrangements by any chance?
Doubtful. Runs around that time have been with freight drivers doing mileage testing.
Saw a 717 leaving Moorgate shortly after 10pm last night... Are they testing new dispatch arrangements by any chance?
Is this real? Obviously the image isn't.
https://twitter.com/13milepost/status/1107328332528566272?s=19
NCL no longer have the SDO5 signs on affected stations. Service hopefully by next Monday.
If they move the stop position forwards from the SDO5 marker the problem gets smaller? i.e. attempting a new compromise between the 2?How would a 717 not need SDO5? Have they sorted out the despatchers?
But the signals haven't moved, and that was why SDO5 was fitted. Are they just getting the drivers to stop closer to the signals? What's your source on March 25th introduction? Could you provide diagrams once sent out?If they move the stop position forwards from the SDO5 marker the problem gets smaller? i.e. attempting a new compromise between the 2?
But the signals haven't moved, and that was why SDO5 was fitted. Are they just getting the drivers to stop closer to the signals? What's your source on March 25th introduction? Could you provide diagrams once sent out?
008 has the most miles (over 2500 now) and seems to be the only one doing the previews this week.10.37 preview service from Moorgate worked today (Tuesday 19th) by 717008. Stopped at Essex Road for a "1-minute test" (driver's words) but doors did not open. Also stopped at Highbury & Islington and Drayton Park for passengers, but non-stopped Old Street.
The signals are due to be moved shortly apparently, although NR where doing some field work last week. i’ve seen a diagram for 717 next week with an amended method of working for the NCL.
I'm surprised a lot of those 313s last week to week, let alone until June-June or longer. The one I was on this morning sounded like a tractor when idling.
Just the one cancellation, I believe. Train broke down at Drayton Park. It's happening quite a bit there lately.
Apparently GTR are once again looking to repair/maintain 313s. I've heard they are ordering parts.
There is still a booked diagram for a single unit. Ironically it only runs in the peaks.They used to, in theory I think they have stopped using them. For example at Highbury and Islington a 3 car train heading north would stop at the south/back end of the platform.
Apparently GTR are once again looking to repair/maintain 313s. I've heard they are ordering parts.
Thanks for info, are you able to confirm which diagram this is?
However GTR are not ordering parts for the Class 313s, what they are doing is stripping parts from withdrawn GN Class 313s to use for the SN Class 313s to keep them going which considering the Class 717 fleet will soon replace the Class 313 fleet is the most obvious thing that GTR should be doing.
The class 314 Withdrawal forum mentions 314s heading south to be stripped of parts!There's a lot like that, but it's nothing new. For several years now they've made that racket.
Just the one cancellation, I believe. Train broke down at Drayton Park. It's happening quite a bit there lately.
Apparently GTR are once again looking to repair/maintain 313s. I've heard they are ordering parts.
Rather than platform staff, I'm hearing there may be a second man in the cab. Whatever the case, word is next Monday is go day. That's unless Aslef have any further concerns!
Better hope the second man isn't a driver. GTR barely have enough drivers for one in the cab let alone two.
Better hope the second man isn't a driver. GTR barely have enough drivers for one in the cab let alone two.
Well it's Chris Grayling's patch so that would stand to reasonCan't imagine who else it would be. If they use drivers we'll see plenty of cancellations.
*CDM's maybe? I can't see no other way, some days there's barely anyone spare and it's only 3 depots that can go in the NCL now.Can't imagine who else it would be. If they use drivers we'll see plenty of cancellations.
Can't imagine who else it would be. If they use drivers we'll see plenty of cancellations.
I got a call saying my units will be 717s and I shall also be doing the afternoon stretch on the 717, the morning stretch is:
05:41 2K02 FPK - MOG
06:07 2F02 MOG - SVG
07:28 2J30 SVG - MOG
18:00 2V28 MOG - WGC
18:58 2K46 WGC - MOG
19:55 2B48 MOG - HFN
Those are the times for when drivers from my depot have them, not sure about timings from Welwyn and Hitchin diagrams
I hope they keep 040/057 and 036/(sh*t I forgot to note it down!) till the very end as these have been very quick units.
I got a call saying my units will be 717s and I shall also be doing the afternoon stretch on the 717, the morning stretch is:
05:41 2K02 FPK - MOG
06:07 2F02 MOG - SVG
07:28 2J30 SVG - MOG
18:00 2V28 MOG - WGC
18:58 2K46 WGC - MOG
19:55 2B48 MOG - HFN
Those are the times for when drivers from my depot have them, not sure about timings from Welwyn and Hitchin diagrams
I hope they keep 040/057 and 036/(sh*t I forgot to note it down!) till the very end as these have been very quick units.
Two units next week, then two new trains introduced each week thereafter.
These are so needed. Seems at least one more 313 has failed today, possibly two.
These are so needed. Seems at least one more 313 has failed today, possibly two.