What you walk inside the train is less walking outside anyway.
You end up walking the same distance.
What you walk inside the train is less walking outside anyway.
You end up walking the same distance.
There isn't a connection on the station diagrams or any sign of work.Flows may change at Moorgate once Crossrail opens, as I believe a connection to that will be at the north end of the platforms.
Flows may change at Moorgate once Crossrail opens, as I believe a connection to that will be at the north end of the platforms.
ECS if it's this one:
http://www.realtimetrains.co.uk/train/X24858/2018/10/22/advanced
Edit: Looks like it's running up and down much of the inter-peak today between Moorgate and Gordon Hill. Driver training?
A update from GN about the numbers of the fleet expected to be in FULL passenger service from December see following tweet:
Hello Alex, I believe up to 25. ^Kim
https://twitter.com/GNRailUK/status/1054315838117949440
So that SHOULD be as much as the entire fleet in full passenger service by then!
No idea when the last Class 313 service is going to be operated nor if they will have a farewell tour like the Class 319s did when they left the Thameslink.
2,000 hours running? If it were driven nonstop by a test driver for a full shift, 5 days a week, that would be a YEAR of running before it could be handed over.Each unit has to arrive here and complete approx 2,000 hours fault free running before GTR take it over
2,000 hours running? If it were driven nonstop by a test driver for a full shift, 5 days a week, that would be a YEAR of running before it could be handed over.
Aircraft manufacturers manage to get to customer handover in a few days of tests from the first flight. Why ever the difference?
Have corrected it!Miles...
Just passed a 717 heading north between hornsey and harringay. Couldn't tell if it had passengers on board.
Just a test? Or actually in service?
717s are in passenger service on Fridays only, at the moment. Moorgate-Gordon Hill non-stop. Though that could change as the days pass.
That does seem to be a waste of resources why not have it work proper diagrams such as ALL Moorgate to Gordon Hill services as a preview service and actually see what they're like in service stopping and starting and you know actually being used to iron out any issues rather then just run them fast between the two...
Official services are due to start end of November, pending some changes at Moorgate for signal sighting and setting up SDO at Old Street and Highbury & Islington (the latter is still being discussed).
Perhaps because they can't currently stop at Old Street and Highbury & Islington?
It stops them replacing a current 313 service though.That doesn't stop them from calling at the other stations though now does it?![]()
It stops them replacing a current 313 service though.
Perhaps running the additional service as an express is the only way a spare path can be found?
I must admit SDO is concerning. Maybe works on the tube which have more doors per coach. But knowing how overcrowded these services get watch dwell times increase. At least the rear doors will be quiet as customers get to know if they use them they are not getting off at the station they need.
I can't find any of these Friday services on RTT?
Thanks.They might not show until later in the week.
That doesn't stop them from calling at the other stations though now does it?
If they're going to run them at all then they ought to be used on actual services as a preview instead of running them empty as a white elephant express service.
It's a little easier on trains with nice wide open gangways and walkthrough carriages. The Overground gets phenomenally crush loaded on the East London Line during the morning peak, and a single door cut out at the rear doesn't seem to cause problems at Canada Water (the busiest station by far).