As far as I can remember, the Class 387 fleet operated by GN are limited to 100mph because of their pantograph, which was changed (as far as I recall) to be the same as the 377. Now the fleet is exclusively operated on the GN, is there any chance that they may be able to operate at 110 again?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

aleggatta

Member
Joined
28 Sep 2015
Messages
565
Pans were never changed as far as I can remember, but believe the speed limit is still in place
 

jamieP

Member
Joined
27 Feb 2012
Messages
310
I think the restriction is in place due the old OHL on the ECML don't like multiple pans running about 100mph.
 

TheDavibob

Member
Joined
10 Oct 2016
Messages
430
What sort of time saving is there to be had running from Kings Cross to Hitchin at 110mph over 100? And does this help with pathing in any way?

The ride is a little bumpy now, it'd be rather "fun" a little faster...
 

332 > 444

Member
Joined
22 Feb 2007
Messages
532
Location
London
Not much if the train is turned in at Woolmer Green then it's 75mph on the slow. Even if the train got routed up to and turned in at Hitchin South junction, it wouldn't get up to 100mph due to the 70mph lead so the train can actually stop at Hitchin.
 

Prestige15

Member
Joined
6 Aug 2016
Messages
487
Location
Warrington
All 387's were built with 110 mph max speed, I believe its down to the old OHL which cant cope mutiple pans at high speed, That explain why they can't go higher than 100 when it was with thameslink compared to WCML and GWML where you seen a number of multiple 387's at 110mph.
 

Bungle965

Established Member
Associate Staff
Buses & Coaches
Joined
2 Jul 2014
Messages
3,377
Location
Calder Valley
I think the restriction is in place due the old OHL on the ECML don't like multiple pans running about 100mph.
The 373s on the White Rose services could run at up to 110mph could they not? They were running about on two pan's.
Sam
 

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
The 373s on the White Rose services could run at up to 110mph could they not? They were running about on two pan's.
Sam

2 pantographs 270 metres apart is rather different to (up to) 3 pantographs in 80 metres
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
I thought the OHL has (not very long ago) been tested for 125mph running with at least two pantographs, including the class 800/801 "worst case" of both "inner end" paragraphs up on a 2x5 car unit formation?
 

twpsaesneg

Member
Joined
21 Jul 2009
Messages
480
I thought the OHL has (not very long ago) been tested for 125mph running with at least two pantographs, including the class 800/801 "worst case" of both "inner end" paragraphs up on a 2x5 car unit formation?
No, there is (or was) a restriction for degraded mode running, 100mph max for "inner" - "outer" and either 75mph or 80mph (I can't quite remember) for "inner" - "inner". That's not to say they didn't test it to confirm how bad the contact quality would be.

Edited to add - That restriction was supposed to be hard coded into the TMS by Hitachi.
 