"It's all completely hopeless"
There, I've saved them the bother of expensive consulations and research.
If they put in overheads for trams on rail routes (which I assume they will need to) at 750V (am I correct?) then does that not mean that they then cannot electrify the route at 25kV in the future? As in if the MML is electrified and they then want to extend the electrification to Leeds, then surely routes are limited as the route is electrified at a different over head voltage.