Gloucester Road Jn - Selhurst fast spur

Status
Not open for further replies.

John1975

Member
Joined
21 Aug 2013
Messages
115
Whilst travelling from East Croydon to Victoria this afternoon, I noticed the land once occupied by the Gloucester Road Jn - Selhurst fast spurs has been completely cleared of foliage. Does anyone know what this is in readiness for? Are Network Rail reinstating the fast spurs?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

physics34

Established Member
Joined
1 Dec 2013
Messages
4,088
Whilst travelling from East Croydon to Victoria this afternoon, I noticed the land once occupied by the Gloucester Road Jn - Selhurst fast spurs has been completely cleared of foliage. Does anyone know what this is in readiness for? Are Network Rail reinstating the fast spurs?

No plans im afraid. Think it is just general foliage clearing.

Nearby though, there are plans to reopen platform 7 at Norwood Junction, make it a terminus platform and make the line from Bromley Jn to Norwood (Down Spur- Bi-directional.).
 
Last edited:

John1975

Member
Joined
21 Aug 2013
Messages
115
Thanks for that - not sure what particular use it would have been to reinstate the fast spurs anyway.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,265
Nearby though, there are plans to reopen platform 7 at Norwood Junction, make it a terminus platform and make the line from Bromley Jn to Norwood (Down Spur- Bi-directional.).

There were plans, but as we discussed a year or so ago they didn't make it into the confirmed CP5 enhancement plans. Whether or not they'll re-enter the process in a later control period is another matter.
 

physics34

Established Member
Joined
1 Dec 2013
Messages
4,088
Thanks for that - not sure what particular use it would have been to reinstate the fast spurs anyway.

true. i may be wrong, but there has been nothing said by network rail about the reinstatement.
 

physics34

Established Member
Joined
1 Dec 2013
Messages
4,088

Yabbadabba

Member
Joined
23 May 2014
Messages
385
The only ongoing projects at the ASC at the moment are, Thameslink Depot Three Bridges, Balcombe Full Bi-Di plus tunnel axel counter sections, Plumpton crossing box abolition to MCB-OD, Thameslink Sidings at Horsham and the big one, Redhill resignalling and new platform. No one as far as I'm aware has been in the ASC to look at mods to panel 1c to alter the tiles for any alterations to the signalling at Gloucester road junction. Not to say they haven't but the gossip from under the juice rail is silent.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,265
The only ongoing projects at the ASC at the moment are, Thameslink Depot Three Bridges, Balcombe Full Bi-Di plus tunnel axel counter sections, Plumpton crossing box abolition to MCB-OD, Thameslink Sidings at Horsham and the big one, Redhill resignalling and new platform. No one as far as I'm aware has been in the ASC to look at mods to panel 1c to alter the tiles for any alterations to the signalling at Gloucester road junction. Not to say they haven't but the gossip from under the juice rail is silent.

The Sussex route study is looking well beyond the current enhancement period, I should have made that clearer.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,712
No plans im afraid. Think it is just general foliage clearing.

Nearby though, there are plans to reopen platform 7 at Norwood Junction, make it a terminus platform and make the line from Bromley Jn to Norwood (Down Spur- Bi-directional.).

Not until early 2020s.
 

Yabbadabba

Member
Joined
23 May 2014
Messages
385
The Sussex route study is looking well beyond the current enhancement period, I should have made that clearer.

Yeah I'm well aware of that, but this doesn't really answer the question. Are they just on vegeratation clearance or is pramilary investigation into the Gloucester Road junction improvements. As work usually starts way off, rumours then abound, then you get the quiet period and after that you are swamped by various engineers taking pictures ready for the mods and umpteen possesions for the works.
 
Last edited:

physics34

Established Member
Joined
1 Dec 2013
Messages
4,088
am hoping the uckfield line platform extension project and victoria station concourse improvement/barrier projects get started this year.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,712
Yeah I'm well aware of that, but this doesn't really answer the question. Are they just on vegeratation clearance or is pramilary investigation into the Gloucester Road junction improvements. As work usually starts way off, rumours then abound, then you get the quiet period and after that you are swamped by various engineers taking pictures ready for the mods and umpteen possesions for the works.

Definitely, definitely, not anything to do with reinstating the spurs.
 