Bredisholm Road is being closed partly for public safety and partly to rebuild the bridge across the A8 which will need to be relocated and lengthened so as to cross the new part of the M8 as well. The founds are done for that work too. Another bridge across the M73 further along that road is also being rebuilt, though quite why is not obvious.
I only found this out yesterday, but have since found a closure notice and plan. It's a bit of a bummer actually because that road gave legitimate and safe access to a good view of the works on both sides of the railway.
Thanks for the info. I had hoped to perhaps use the footbridge to catch some of the action over the next couple of weeks. I noticed security fencing in the area today as I passed it. Oh well. Thanks for the plans too. I am a sucker for that kind of thing too. lol
They are possibly rebuilding the M73 footbridge because they are installing a new roundabout at the Baillieston end of "Scotlands Spaghetti Junction" and adjusting the the M73 to M8 slip road too (i believe that is actually going to close over the course of several weekends... that will be a traffic nightmare).
http://www.transportscotland.gov.uk/road/m8m73m74/network-upgradesTransport Scotland Project Description said:The works principally consist of widening the existing carriageway by creating an additional lane at the following locations to tackle congestion at peak times:
- Eastbound carriageway of the M8 from Junction 10, Easterhouse
- Easterhouse to Junction 8, Baillieston Interchange.
- Northbound and southbound carriageways of the M73 between Baillieston Interchange and Maryville Interchange.
- Northbound and southbound carriageways of the M74 from Junction 3, Daldowie to Junction 5, Raith.
- Southbound carriageway of the M74 between Junction 5, Raith and Junction 6, Hamilton.
The works will maintain the existing slip road arrangements through the Baillieston Interchange.
The improvement works also include the following:
- A new slip road from the M74 Junction 3, Daldowie to the northbound M73
- Modification of the two existing roundabouts at the M74 Junction 3, Daldowie to a signalised junction
- Widening of four underbridges on the M74
- Demolition of the existing access bridge over the M73 to the south of Baillieston Interchange and provision of a new realigned access bridge
- Replacement of existing road drainage, including introducing a new Sustainable Drainage Systems (SUDS) where practicable, over the extent of the project.

Three projects were combined into one mega-contract:
the M8 completion (including of course Bargeddie bridge)
the addition of an extra lane to bits of the M8, M73 and M74 as described above
the burrowing of a third level under M74 junction 5 (Raith).
It also includes a new All Purpose Road adjacent to the motorway which means capacity between Baillieston and Newhouse will increase from 2 lanes each way to 4-6 lanes each way.

Shame they're not refurbishing the existing bridge which is quite an eyesore.

ThanksNice video once again.![]()
If only that were trueThe water tower you focused in on ...
Must admit I am baffled as to why they decided to hang the wires a couple of months ago, only to bring them back down to do this work. Fair enough put the pylons and everything else in place. Just seems needless extra work and probably expense too.
Or was cascading the 156/158's to other TOC's a bigger priority?
Nice video once again.
The water tower you focused in on was a teenage playground for me for a while. Sadly or perhaps thankfully, never got up on top of it![]()
(they wouldn't even let their own workers on to the site - I kid you not).
Well, it was moved at last this afternoon, after numerous false alarms yesterday and this morning. I had to stay on the other side of the A8 as the whole area was on lockdown (they wouldn't even let their own workers on to the site - I kid you not).
There's a very short film of the bridge being moved here.
Sorry about the quality but the wind was howling and shoogling the camera which had to be on a high tripod to see over the thistles. The rain started really p***ing down just as the bridge started to move. It was was so heavy that I couldn't see what I was filming though the raincover on the camera and I was forced to abandon the shoot very quickly.
I might cobble up a longer version when I dry out a bit.
Excellent. I passed by the site at 3:30 this morning and it was all very busy. Immediately thought of you and hope you had got some footage at some point.
Thanks very much for taking the effort to make this.Longer (4 minute) version of the bridge slide day now cobbled up. It would have to be a bad night on the telly to want to watch it, but if you really are that stuck for something to watch, it's here.![]()
Track over the new bridge being tamped on Saturday 25th July.
That should allow the OHL to be reinstated.
Thanks!Thanks very much for taking the effort to make this.