MadCommuter
Member
- Joined
- 4 Oct 2010
- Messages
- 733
No clues on RTT yet as to what is running.
Confirmed internally as being Ayrshire, Inverclyde, Kilmarnock/EK & Lanark services. I’d assume Avanti/TPE will be running all the way in too but have no confirmation of that.No clues on RTT yet as to what is running.
Last updated: Tuesday, 17 March 2026 at 09:45.
Some ScotRail services to resume at Glasgow Central High Level as station partially reopens from Wednesday (18 March), following the significant fire on Union Street.
Platforms seven to 15 on the west side of the station will be back in use from the start of service on Wednesday.
We'll run as many services as possible, but with a reduced number of platforms available, and limited entry and exit points for customers, this will not allow for the return of trains on all routes that normally operate.
From the start of service on Wednesday, the following will operate:
The partial re-opening of the station has been confirmed following comprehensive safety checks by Network Rail and Glasgow City Council, which has taken control of the site from the Scottish Fire and Rescue Service.
- Ayr and Glasgow Central – a half hourly service, calling at all stations between Paisley Gilmour Street – Kilwinning (Johnstone / Milliken Park / Howwood / Lochwinnoch / Glengarnock / Dalry).
- Gourock and Glasgow Central – an hourly service, calling at all stations.
- Wemyss Bay and Glasgow Central – an hourly service, calling at all stations.
- Kilmarnock and Glasgow Central – a half hourly service, calling at all stations (integrated with normal Carlisle/South Ayrshire services).
- East Kilbride and Glasgow Central – a half hourly service.
- Lanark and Glasgow Central – an hourly service.
Public safety is the main priority with the demolition process ongoing, and an exclusion zone has been established by Glasgow City Council around the fire damaged building. Barriers have been erected inside the station marking the exclusion zone which limits customer access and movement.
Glasgow Central station entrances
ScotRail staff will be on hand at Hope Street to guide and support customers to and from platforms.
This will include entry and exit for customers via an entrance on Hope Street, known as the carriage driveway, which is used during special events and is normally for vehicular access.
The following entrances to the station will remain closed:
- Hope Street (adjacent to Waterloo Street).
- Gordon Street.
- Union Street.
Glasgow Central Low Level
A full timetable of services at the low level platforms, which serve routes from Cumbernauld, Whifflet, Larkhall, and Motherwell to Dalmuir, Balloch, and Milngavie, resumed on Wednesday, 11 March, and they will continue to operate.
In addition to the above, the following services are still affected
Services suspended in both directions
The following routes are currently not operating:
- Edinburgh – Glasgow Central via Shotts/Carstairs
- Glasgow Central – Cathcart Circle
- Glasgow Central – Paisley Canal
- Glasgow Central – Newton
- Glasgow Central – Barrhead
- Glasgow Central – Neilston
- Glasgow Central – Ardrossan South Beach/Harbour
Altered services
The following routes are operating but with significant alterations:
- Glasgow – Largs: Operating only Largs - Kilwinning.
- Glasgow – Dumfries/Carlisle: Operating only Carlisle/Dumfries - Kilmarnock.
- Glasgow – Stranraer: Operating only Stranraer - Kilmarnock.
Refund information
For customers who started their journey on Sunday, 8 March but were unable to continue, our Delay Repay compensation scheme is available.
Any customers who have a ticket but were unable to travel, can request a fee-free refund on unused tickets.
Lanark to Central will be 1 tph on the normal calling pattern.Anyone know which Lanark services as can’t see them on the app yet.
Anyone know which Lanark services as can’t see them on the app yet.
Looks like the one at roughly XX:50 from Lanark/XX:49 from Central.Lanark to Central will be 1 tph on the normal calling pattern.
No TPE and just one Avanti per hour.Confirmed internally as being Ayrshire, Inverclyde, Kilmarnock/EK & Lanark services. I’d assume Avanti/TPE will be running all the way in too but have no confirmation of that.
Was that the 0545 to Ayr off platform 15 at Glasgow Central, closely 'followed' by the 0548 to London Euston off platform 10?And that’s the first passenger train in over a week now on its way !
It was.Was that the 0545 to Ayr off platform 15 at Glasgow Central, closely 'followed' by the 0548 to London Euston off platform 10?
Avanti are using P10 at Central for the hourly 1Mxx to London direct.No TPE and just one Avanti per hour.
Trains are using their booked platforms.First time in Glasgow since the fire. Trains on the East Kilbride, Neilston, Newton and Kilmarnock routes are using platforms 1 and 2. I assume Avanti and TPE are using platforms further up.
First time in Glasgow since the fire. Trains on the East Kilbride, Neilston, Newton and Kilmarnock routes are using platforms 1 and 2. I assume Avanti and TPE are using platforms further up.
The 1309 TPE is booked to use 3.1309 TPE used 3 which caused mild havoc (though the fast turnaround, going out on time despite coming in 20 late, was impressive, and could teach Avanti a thing or two). Not sure why when 1 and 2 were available.