Boston Poacher
Member
Back in July 2025, Richard Tice (MP of Boston and Skegness) announced his plans to 'Get Boston Moving' which involves a new link between Boston and Spalding, and the re-alignment of the Poacher Line to the East - creating 2 new stations (Boston North and South), in turn removing 7 level crossings and creating Park and Ride + Bus Shuttles to the town centre. What are people's thoughts on this?
"Network Rail PACE compliant study stages to consider Improved Rail connectivity in and around Boston. To consider new stations, south and North of Boston both with park and ride and bus shuttle services to town and the hospital. Port link improvements to switch freight trains easier and quicker This alignment would be transformational for Boston but would still enable the 617 passengers that use Boston Station and the 981 passengers that use Skegness as a departure or destination point to stop or pass through Boston station each day. ROAD / RAIL CROSSINGS CLOSURES 1 - Pilleys Lane 2 - Willoughby Road 3 - Horncastle Road 4 - Red Cap Lane 5 - Tattershall Road 6 - Sluice Bridge 7 - West Street Rail alignment to the East of Boston would enable the closure of some crossings. Reducing congestion, saving 12.25 hours per day of delays to pedestrians and drivers across the seven crossings. Reports of other areas with less railway crossings have placed the economic cost at millions per annum."
"Boston has not been connected to Spalding by rail since the line closure in 1970. The original Boston to Spalding line predominantly followed the route of the current A16 Boston to Algakirk, so an alternative needs to be found. Connecting the line to Spalding opens up whole new range of education, employment, retail and leisure opportunities for the people of Boston. Spalding Link Bicker / Little Hale Fen Connecting the line to Spalding also creates new freight opportunities both for the port and for the agricultural and food industries to use rail as an alternative. Political changes and ownership changes to the rail network, train operating and freight operating company licences makes now the time to complete a self funded study to prove the economic importance of this link. RAILWAY IMPROVEMENTS COST AND TIME ESTIMATES Boston Rail Alignment / Stations / Line to Port Estimated length 4.5kms Complexity high with virgin line plus two stations ES1-3 Cost: £1.5m ES4-5 Cost: £1.5m Line Construction + ES 6-7 Cost: £22.5m North and South Station Costs: £7m 30% Optimism Bias Cost: £9.75m Total Costs: £42.25m Total Time Estimate: 4 years Spalding Link Bicker / Little Hale Fen Estimated length: 6km Complexity low no new stations ES1-3 Cost: £0.5m ES4-5 Cost: £0.5m Line Construction + ES 6-7 Cost: £17m 30% optimism Bias Cost: £5.4m Total Cost: £23.4m Total Time estimate: 3 years"
"Network Rail PACE compliant study stages to consider Improved Rail connectivity in and around Boston. To consider new stations, south and North of Boston both with park and ride and bus shuttle services to town and the hospital. Port link improvements to switch freight trains easier and quicker This alignment would be transformational for Boston but would still enable the 617 passengers that use Boston Station and the 981 passengers that use Skegness as a departure or destination point to stop or pass through Boston station each day. ROAD / RAIL CROSSINGS CLOSURES 1 - Pilleys Lane 2 - Willoughby Road 3 - Horncastle Road 4 - Red Cap Lane 5 - Tattershall Road 6 - Sluice Bridge 7 - West Street Rail alignment to the East of Boston would enable the closure of some crossings. Reducing congestion, saving 12.25 hours per day of delays to pedestrians and drivers across the seven crossings. Reports of other areas with less railway crossings have placed the economic cost at millions per annum."
"Boston has not been connected to Spalding by rail since the line closure in 1970. The original Boston to Spalding line predominantly followed the route of the current A16 Boston to Algakirk, so an alternative needs to be found. Connecting the line to Spalding opens up whole new range of education, employment, retail and leisure opportunities for the people of Boston. Spalding Link Bicker / Little Hale Fen Connecting the line to Spalding also creates new freight opportunities both for the port and for the agricultural and food industries to use rail as an alternative. Political changes and ownership changes to the rail network, train operating and freight operating company licences makes now the time to complete a self funded study to prove the economic importance of this link. RAILWAY IMPROVEMENTS COST AND TIME ESTIMATES Boston Rail Alignment / Stations / Line to Port Estimated length 4.5kms Complexity high with virgin line plus two stations ES1-3 Cost: £1.5m ES4-5 Cost: £1.5m Line Construction + ES 6-7 Cost: £22.5m North and South Station Costs: £7m 30% Optimism Bias Cost: £9.75m Total Costs: £42.25m Total Time Estimate: 4 years Spalding Link Bicker / Little Hale Fen Estimated length: 6km Complexity low no new stations ES1-3 Cost: £0.5m ES4-5 Cost: £0.5m Line Construction + ES 6-7 Cost: £17m 30% optimism Bias Cost: £5.4m Total Cost: £23.4m Total Time estimate: 3 years"
Attachments
Last edited:
