krus_aragon
Established Member
I've been watching recorded coverage of a rail infrastructure debate at the Welsh Assembly three days ago on BBC Parliament, and Ieuan Wyn mentioned plans to 'introduce improved rolling stock on other North-South services', and that he is in talks with Arriva and 'suppliers' about this. This was specifically replacing stock on current paths, as opposed to new paths, which he again implied won't become available before redoubling near Wrexham.
My bet is that this means putting a Gerald II set on some existing paths, and maybe sending the first set back up North on an existing path as well. There'd be one or two free 175s that could then cascade other stock within Wales.
Does anyone have any views or information?
My bet is that this means putting a Gerald II set on some existing paths, and maybe sending the first set back up North on an existing path as well. There'd be one or two free 175s that could then cascade other stock within Wales.
Does anyone have any views or information?