Drove through on the way south yesterday and noticed that there was some activity which looks like the laying of sidings on the Wick side of the road bridge. Does anyone know if this is just in connection with the Dounray traffic or whether there are plans for anything else please?

I did a search, but didn't see the info anywhere else.

Thanks
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

oldman

Established Member
Joined
26 Nov 2013
Messages
1,341
This from the Northern Times in 2010:

Last month, details were revealed of a £35m private sector scheme to create two bio-mass plants at Georgemas and Forss.

It ties in with a new operation being planned by On-Route Logistics to set up and operate a rail freight hub at the junction, just south of Thurso.

The intention is to run trains of raw timber to the two new plants and then haul the finished product south from Georgemas.

Would be good for the Far North Line if true. However, I can't find anything recent online to say this project is actually up and running.
 

steevp

Member
Joined
25 Jul 2012
Messages
247
Thanks oldman

There were a couple of lorries on-site with lengths of rail on them and we passed another that was going north on the A9 later on, so there is something going on there
 

Gathursty

Established Member
Joined
31 May 2011
Messages
2,649
Location
Wigan
Will the Far North Line cope as a result of the likely increase of rail freight expected due to this news? I think Inverness-Dingwall gets 10 trains a day, with up to Tain or Ardgay IIRC about half of that and to the end 4 trains a day on mainly single line track with a plethora of loops or am I confusing the cause of the slim service with the size of local population?
 

cf111

Established Member
Joined
13 Nov 2012
Messages
1,393
Will the Far North Line cope as a result of the likely increase of rail freight expected due to this news? I think Inverness-Dingwall gets 10 trains a day, with up to Tain or Ardgay IIRC about half of that and to the end 4 trains a day on mainly single line track with a plethora of loops or am I confusing the cause of the slim service with the size of local population?

There is already difficulty at the south-end of the route, and that's where I think the problem would stay. I think doubling all the track between Inverness and Tain would be the most useful development.

The long-term problem might be with RETB and the time it takes for trains to clear sections. I've no idea if there's a concrete plan for its replacement (ERTMS?) though.
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,939
Location
Airedale
Present capacity is roughly 1 train every 40 minutes south of Lairg. South of Dingwall is at capacity in the peaks and early afternoon but not otherwise.

Unless there is a huge amount of freight on offer, or a major increase in Inverness commuter trains planned, I don't see this posing serious problems.
 

rf_ioliver

Member
Joined
17 Apr 2011
Messages
1,026
Don't be so timid. Demand that the doubling is made all the way up to the northern extremities and also demand full line electrification in addition, plus the total reinstatement of the Wick and Lybster Light Railway...:D

Please, some ambition...HS4 at a minimum

t.

Ian
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,285
Don't forget a rail tunnel under the Pentland Firth.
 

cf111

Established Member
Joined
13 Nov 2012
Messages
1,393
Don't be so timid. Demand that the doubling is made all the way up to the northern extremities and also demand full line electrification in addition, plus the total reinstatement of the Wick and Lybster Light Railway...:D

Please, some ambition...HS4 at a minimum

t.

Ian

Don't forget a rail tunnel under the Pentland Firth.

:lol:

Oh well, if we're going down that route then the angry letter writing pen will be out for a diatribe to Transport Scotland demanding at least 30 shiny new IEP units to run the service.
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,602
Location
Scotland
I think doubling all the track between Inverness and Tain would be the most useful development.

How about just re-doubling Clachnaharry to Clunes? That would remove the biggest capacity constraint on the Far North Line.
 

steevp

Member
Joined
25 Jul 2012
Messages
247
How about just re-doubling Clachnaharry to Clunes? That would remove the biggest capacity constraint on the Far North Line.

Does anybody know where the existing passing loops are?

BTW thanks for all the replies - including the slightly less than serious ones!:D
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,602
Location
Scotland
Does anybody know where the existing passing loops are?

AFAIK, the passing loops are Muir of Ord, Dingwall, Invergordon, Tain, Ardgay, Lairg, Brora, Helmsdale, Fosinard and Georgemas Junction. It's been a while since I travelled further north than Alness, so I may have forgotten one or two.
 

Railsigns

Established Member
Joined
15 Feb 2010
Messages
2,754
Also Forsinard.

Also Rogart. It's debatable whether Georgemas Junction can be classed as a crossing loop any more: The southernmost loop line can only be accessed by operating a ground frame and it has no platform.
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,602
Location
Scotland
Also Rogart. It's debatable whether Georgemas Junction can be classed as a crossing loop any more

It might not be a passing place for regular passenger service, but it can/could be used for freight or out of order working.
 

Maxfly

Member
Joined
9 Mar 2010
Messages
269
Location
Scotland
The usual way of getting freight, well the pipes into georgemas is send the unit on its way to Thurso, pipes are waiting at Halkirk Stop Board (hopefully) then after unit loop clears Gmas take in the pipes and once they arrive give them Gmas-wick for shunting purposes, unit arrives Thurso and while driver changes ends the pipes should hopefully clear Gmas to enable the unit to get the long section Thurso to Gmas. Unit comes in and changes ends again, gets thrown south so pipes can move back into Gmas and commence shunting as required.
It's all to do with available time etc as to whether a freight can go straight into the sidings via GF's.

Cheapest option to make a big difference would be a passing loop at clunes, really crying out for that most weeks.
 
Status