Continuing from this post,
I believe there may be room for a shared pool of a generic dual-voltage EMU design that could be shared between Great Northern, Southern and Southeastern. This would be similar to the arrangement for the Class 350s in their early days, where Central and Silverlink shared the same fleet, with the trains wearing a generic livery. Southern in particular has a major shortage of trains after losing the 455s and 313s. Even though the 387s moving from GN will mean they have more trains despite sending some 377s to Southeastern, they are still far down from what they had before. Southeastern has the ongoing task of replacing the Networkers. Even though they have a tender for a replacement fleet, this will be years off. The ex-Southern 377s won't be enough to replace the entire 465/9 fleet, let alone making a dent in the overall Networker fleet. While this generic EMU would not be a total fleet replacement, a portion of the fleet could be used alongside the ex-Southern 377s on services currently operated by 465/9s. Great Northern don't seem to need new trains as much as Southern and Southeastern, but they have lost the 317s, 321s and 365s, so I'd assume that the generic EMU fleet could help provide extra services.
The closest thing we have to this hypothetical fleet is the Class 387 fleet, as it is a large group of nearly identical units running for different operators. Obviously we can't have more of them built, so it would have to be a completely new fleet. Below I have written a draft specification for the new fleet:
I believe there may be room for a shared pool of a generic dual-voltage EMU design that could be shared between Great Northern, Southern and Southeastern. This would be similar to the arrangement for the Class 350s in their early days, where Central and Silverlink shared the same fleet, with the trains wearing a generic livery. Southern in particular has a major shortage of trains after losing the 455s and 313s. Even though the 387s moving from GN will mean they have more trains despite sending some 377s to Southeastern, they are still far down from what they had before. Southeastern has the ongoing task of replacing the Networkers. Even though they have a tender for a replacement fleet, this will be years off. The ex-Southern 377s won't be enough to replace the entire 465/9 fleet, let alone making a dent in the overall Networker fleet. While this generic EMU would not be a total fleet replacement, a portion of the fleet could be used alongside the ex-Southern 377s on services currently operated by 465/9s. Great Northern don't seem to need new trains as much as Southern and Southeastern, but they have lost the 317s, 321s and 365s, so I'd assume that the generic EMU fleet could help provide extra services.
The closest thing we have to this hypothetical fleet is the Class 387 fleet, as it is a large group of nearly identical units running for different operators. Obviously we can't have more of them built, so it would have to be a completely new fleet. Below I have written a draft specification for the new fleet:
- 20m coaches
- 4 coach units
- Dual-voltage
- End gangways
- Two sets of double leaf doors per coach
- Generic livery
- Generic interior