Lots of speculation everywhere, so here's the bet, predict:

Next Prime Minister
Next Labour Party leader
Next England Manager
Next East Anglia franchise holder

You would get good odds on getting all four correct, but which one is most important (nearly typed impotent) ;)

In which order of selection though?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,833
Location
East Anglia
Looks like the latest rumour was also wrong :roll:

No press release from ORR today.
 

Rick1984

Member
Joined
23 Aug 2012
Messages
1,145
Would a dynamic loop between Acle and Lingwood allow half-hourly services to Great Yarmouth?
I know at least some of the bridges are two tracks wide, though I've never been able to find out if the line used to be two tracks from Acle.
 

TheEdge

Established Member
Joined
29 Nov 2012
Messages
4,498
Location
Norwich
Would a dynamic loop between Acle and Lingwood allow half-hourly services to Great Yarmouth?
I know at least some of the bridges are two tracks wide, though I've never been able to find out if the line used to be two tracks from Acle.

Its already do-able and is near enough done in the morning and evening "peak" if you could call it that just using the passing loop at Acle and the double track between Brundall and Norwich. Eternal problem is having the stock to do it.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,833
Location
East Anglia
Would a dynamic loop between Acle and Lingwood allow half-hourly services to Great Yarmouth?
I know at least some of the bridges are two tracks wide, though I've never been able to find out if the line used to be two tracks from Acle.

Never was double tracked, only built for it. Its been said that a half-hourly service would perfectly fit a loop just short of Lingwood although this would be an expensive option just to get a pretty timetable. Acle/Lingwood don't warrant such a frequency either. It is possible to operate two or more trains an hour now, albeit using the Berney Arms route.
 

43074

Established Member
Joined
10 Oct 2012
Messages
2,253
Would a dynamic loop between Acle and Lingwood allow half-hourly services to Great Yarmouth?
I know at least some of the bridges are two tracks wide, though I've never been able to find out if the line used to be two tracks from Acle.

You could do a half hourly service to Great Yarmouth using the passing loop already at Acle, or by alternating between via Reedham and via Acle, the issue is more the lack of trains to run any extra services with and where the funding would come from to pay for them.

EDIT - beaten to it by dk1 and TheEdge!
 
Last edited:

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,833
Location
East Anglia
In a perfect world you would make it one-way & use Acle for down trains & Reedham for up. This would probably upset the locals however. Remember also that there where also boxes at one time at Berney Arms, Stracey Arms, Lingwood, Buckenham & Postwick assisting with breaking up the sections on busy days & with the often slow freight services that once existed.
 

Rick1984

Member
Joined
23 Aug 2012
Messages
1,145
Interesting. Agree intermediate stations don't warrant a half hour service particularly but GY definitely does. Being stuck in GY station for an hour if you miss your train or it's canceled is no fun!
 
Last edited:

Sleepy

Established Member
Joined
15 Feb 2009
Messages
1,831
Location
East Anglia
<( ..... and the wait goes on - will it go to the wire (Friday next week) or will it be Another Extension !! :roll:
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
Most of the population of this route use the bus. The bus runs to the city centre, its perceived as better quality than the train including wifi and I believe it may be cheaper too.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,833
Location
East Anglia
Most of the population of this route use the bus. The bus runs to the city centre, its perceived as better quality than the train including wifi and I believe it may be cheaper too.

To an extent this is very true. That's why at least a half hourly frequency is required in my opinion. Trains are very busy at times but numbers a made up of those travelling further distances on Intercity & East Mids services. There are quite healthy numbers who use trains Thursday Friday & Saturday evenings going to Riverside & also Sunday services oddly can be well used all day. Monday/Friday reliefs (similar to Saturday's) start for 'The Sun' holiday brigade towards the end of this month.
 

TheEdge

Established Member
Joined
29 Nov 2012
Messages
4,498
Location
Norwich
<( ..... and the wait goes on - will it go to the wire (Friday next week) or will it be Another Extension !! :roll:

Extension. Because just what Anglia needs is even longer with the rail franchise living in limbo...
 

samuelmorris

Established Member
Joined
18 Jul 2013
Messages
5,121
Location
Brentwood, Essex
I hope to be proven wrong, but I am honestly anticipating an additional extension to the current franchise of similar tune to the existing one due to 'economic uncertainties about leaving the EU' and the likes - no investment, just status quo for another 2 years or so. All the economic predictions the existing bids will be based on are out the window and with the greatly reduced time the DfT have to evaluate how well the bidders have addressed these concerns, I can't see it happening.
 

Alfie1014

Established Member
Joined
27 Jun 2012
Messages
1,205
Location
Essex
I thought procurment rules prevented a 'third' extension, but as we're in interesting times who knows!
 

jamesontheroad

Established Member
Joined
24 Jan 2009
Messages
2,233
Location
Umeå, Sweden
As the East Anglia region voted strongly for Brexit, there's a certain poetic justice there.

All of East Anglia, but for Norwich and Cambridge. Plans are afoot for passport and immigration checks at Thorpe station after Norwich declares independence :D
 

cjmillsnun

Established Member
Joined
13 Feb 2011
Messages
3,275
Just to add a light note whilst we're waiting...

The new stock for the GEML has been announced. Zero carbon emissions!

0907_WEB_b_Railfest_1_t800_h5ece086cb22d848028fe14fdb8e7c4dfd6e49f2d.JPG


:lol:
 
Last edited:

HH

Established Member
Joined
31 Jul 2009
Messages
4,505
Location
Essex
My bad, lets hope that any delay is a matter of weeks not the full 7 periods which would take us up until next April.

They can only call it once, so who knows how long a period they specified. However, if you were an arse-covering civil servant 7 periods seems more likely than 1 or 2...
 

MrPIC

Member
Joined
30 May 2015
Messages
426
Lifted from that article:
A spokeswoman for the DfT described the Sunday Times story as “pure speculation” and said an announcement on the franchise would be made “in due course.” She could not give any indication of a timescale for the decision.
 

HH

Established Member
Joined
31 Jul 2009
Messages
4,505
Location
Essex
Well that's OK then. The DfT have it all in hand... <D
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,904
Location
Mold, Clwyd
If the DfT was on the point of announcing the East Anglia winner, it will now have gone back into the cupboard until a new Transport Secretary is appointed (or Patrick McLoughlin confirmed in post).

I can't find any views of Theresa May on railways, or HS2 (Andrea Leadsom was actively opposed to HS2).
 

HH

Established Member
Joined
31 Jul 2009
Messages
4,505
Location
Essex
Latest rumour is that Abellio were preferred bidder, with FirstGroup second. However, following Brexit there is a deal of uncertainty, not least about the price of rolling stock from Alstom. No bidder is going to confirm their bid in these circumstances, given that the risks all lie with them.

DfT are now stuck between the rock of July 21 parliamentary recess and the hard place of a 15 October franchise end date. The smart money has to be on some sort of Direct Award to Abellio, while DfT sort the mess out. I'm not hearing any rumours that DoR has been put on standby.
 
Status
Not open for further replies.