Having travelled on the GCR(N) for the first time last weekend (on their Twixmas Train), it got me wondering if the British Gypsum trains will restart now that the branch has reopened or has all the traffic moved to road permanently?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,665
Location
Nottingham
Gypsum was originally mined locally but more recently was a bi-product of desulphurisation of coal-fired power station flue gases, at least some of which went by rail. The last of these (Ratcliffe) closed a few months ago, so where does the raw material now come from and is the flow still suitable for rail?
 

jfowkes

Established Member
Joined
20 Jul 2017
Messages
1,268
Gypsum is definitely still mined at East Lake and British Gypsum also want to mine on the former power station site!
https://www.british-gypsum.com/about-us/our-locations/future-plans/development-ratcliffe-soar
https://www.british-gypsum.com/about-us/our-locations/future-plans/development-ratcliffe-soar

Welcome to our public consultation to outline proposals by British Gypsum for the prior extraction of gypsum on land to the north-east of the Ratcliffe-on-Soar power station. This land forms part of the Local Development Order (LDO) approved for the site.