Flying Phil
Established Member
- Joined
- 18 Apr 2016
- Messages
- 2,084
Thanks for that Up Main and the GCRN Cutting 'Edge team.....do helpers just turn up at that location? .....and if lots turn up, could the bridge site area also be cleared?
Thanks for that Up Main and the GCRN Cutting 'Edge team.....do helpers just turn up at that location? .....and if lots turn up, could the bridge site area also be cleared?
The spoil heap is due to be moved back onto the ERMT site - ready for when it can be used as part of the new northern embankment, as the land it is on, belongs to Loughborough Grammar School - their paddock.Hi Phil, do you mean then that the double track would end between Loughborough station and the shed and then stay single from there onwards or do you mean putting in a loop from just north of the shed on the new section?As there is now a "pause" in construction work I have been wondering about the possible operation of the line in the future. In a much earlier post (#22) "Flipper" outlined the case for double track around the shed, over the canal bridge and as far North as possible along the embankment behind PreciSpark. Obviously this will be a massive cost in trackwork and signalling. Might it be better - certainly initially, just to run a single track alongside the shed, with a point between the shed and bridge. Then have the section of double track as a long loop. Even that loop might not be installed initially. That way we get most of the benefits (Through running and access to NR rails) of joining the "Gap" in a shorter timescale and reduced cost.
This is the way that I go, there is open access just over the road bridge between Lbro MML station and the town. However at the very end, by the canal bridge there is a narrow pedestrian walkway with staggered barriers which need a bike to be lifted over! The path on this side stops here, so you cannot go further under the canal bridge.