• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

GBRf Class 99 - 30 locomotives now ordered

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

XCTurbostar

Established Member
Joined
13 Sep 2014
Messages
2,596
Looks like some of the 99 London Gateway diagrams including 4M01 and 4M47 have been swapped for 66s recently. Drivers on social media appear to have been discussing and reporting wheel slip issues in the wet to signallers etc.
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,817
Location
Croydon
From the "Future Class 73 replacement" thread :-

The latest RAIL magazine has just dropped and has an item about the 99s set to be ordered for the Sleeper. The expectation is for 13x additional 99s, which would have electric train supply (unlike the first 20x 99s), possibly also 100mph top speed and each Highland sleeper would have one 99 run all the way from Euston-Inverness. The 92s, 73/9s and 66s will be withdrawn/cascaded elsewhere.

Further posts clarify that is 13 on top of the existing order for 30 of which 10 were to have ETS.
So 43 x 99s ordered so far.
23 with ETS
20 without ETS.
As the poster says - source RAIL magazine.
Thought I would copy here as it is the dedicated 99 thread.
 

InvHst

Member
Joined
9 Dec 2018
Messages
449
I presuming the 99 on diesel is more efficient and environmentally friendly than a 66 in the highlands?
Its not down to any of that GBRF currently don't have enough 66s to fulfil job lists. Works out cheaper than hiring in locomotives from other companies so has resulted in 99s being used on RHTT circuits and also gets drivers trained on them
 

Top