Gatwick Airport Revamp

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Invincibles

Member
Joined
12 Jul 2009
Messages
511
Location
Suzhou, Jiangsu, China
The pictures seem to show a platform nearer to the terminals which only has one face. This has an outside set of steps / ramp and looks to me to be the new one.

However on the pictures there looks to be flat land with no rails (just grass) is this a potential for a short bay (up to the steps) possibly for the reading FGW train?

EDIT: I have the wrong side, I was confusing the terminal building and the car park. I have not been there since April if that is a defence
 
Last edited:

bangor-toad

Member
Joined
20 Feb 2009
Messages
671
Hi there,
The pictures on the Network Rail webpage show where the new platform will go.

It's to the East of the current platforms and it fits in the gap between the existing platforms and the cark parks. If you look at last picture you can see the existing curved Platform 6 and the far straighter proposed new Platform 7. All Platforms are through ones, no bays are provided.

It looks a sensible way to get the platform in without *too* much civil engineering work.
I wonder how the track layout will be adjusted to integrate it? There's nothing published yet about this...

Cheers,
Jason
 

PhilipW

Member
Joined
6 Feb 2008
Messages
761
Location
Fareham, Hants
One of the main restrictions at the moment seems to be that the Gatwick Express on the Quarry lines has to cross over the Redhill/Mersham lines to reach the platforms on the West side of the station. With 4 trains an hours, that is 8 movements blocking all lines.

Is this going to be fixed with the Gatwick Express now terminating on the new eastside platforms ?

If not, I'm not too sure what the benefits of the upgrades are.
 

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,856
The work is due to start after the Olympics in London, and be finished by Winter 2013 - I think the extra platform is to relieve the bottleneck it is on the BML (with the GX terminators etc)
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,259
The new extra platform is to be on the east side, as others have mentioned, and will become the normal down fast. That will allow P5 and P6 to be used for terminating alternate Gatwick Express trains in the offpeak, in fact they'll possibly dedicate the 5/6 island to Gatwick Express normally.

Because they will then be sitting between the up and down fast lines, they won't have to do the current conflicting move across the up fast and down slow when they arrive at Gatwick.

My theory is based on the future track layout drawing in the Sussex RUS...
 

thelem

Member
Joined
17 Mar 2008
Messages
550
Looking at the view from the south west:
http://www.networkrailmediacentre.co.uk/Resource-Library/Gatwick-Airport-3-f48.aspx
 