Drainage does not count towards the volume they are measured against. So as far as they are concerned it is expense and bother for no result. Just one of the perverse side effects of the way, the railways performance is measured against ORR / government targets.
Sorry Trog, my meaning was that the drainage WAS included, in those particular works.
That said, I agree, and many sites now regularly encounter the results of poor drainage. Network Rail simple do not appear to understand the fundamental importance of drainage, and do not take any action to resolve drainage problems, even in locations where there are obvious drainage failures. They would rather relay straight into standing water because it keeps the Territory renewals figures up.
Another perversity is that of allocated renewal yardage, the application of which can, and does create absolutely stupid scenarios where "islands" of poor track are created, either because the yardage is measured wrongly (normally from the nearest 1/4 post rather than the reference point), or a previous shortfall is not included.
Yardages also do not recognise constraints such as sleeper volumes, and it is not unusual for a three tier sleeper salmon to be broken in order to reach the yardage. The unused sleepers then have to be unloaded (as the wagon cannot go forward partially loaded) and left lineside. Ths causes delays as the renewal times do not allow for this, and it costs money to uplift the sleepers, (usually by RRM and trailer at a later stage) and road them away.
You can then end up with a short section of say SHC in between G44s and F40s, and other similar stupidities.
There are incredible inefficiencies in track renewals that are really easy wins yet no one in I&I is interested, and if you do try to tackle these you are labelled a troublemaker. :roll:
If Network Rail removed the whole tranche of I&I leeches and set up Contracts direct with the Maintenance Engineer there would be no need to de-scope many of the Projects currently being cut back.