4-SUB 4732
Established Member
- Joined
- 7 Jan 2018
- Messages
- 2,150
The route study said that before actually finding out they don't fit which was clever.
Why is terminating at Macclesfield a bad idea? The only reason it does that is because the original lay over time it had at Stoke, where the original plan to terminate was, is enough to get it to Macc and back.
Because it's terminating in blooming Macclesfield. The reality is that it will be a classic-compatible set and there would be absolutely no issues at all with it operating beyond Macclesfield to Stockport and perhaps on to Bolton so it has through trains to London or indeed just terminating at Piccadilly. There is a lot to be said for flows such as Macclesfield > Stockport > Piccadilly. A Macclesfield terminator is no good use of capacity and that train will never, ever be full!