RAGNARØKR;1279791 said:
The same RC type locos will haul freight or between three and around 12 passenger cars, though the fleet has been distributed to separate operators with a partial privatisation.
Mixed traffic locomotives are inefficient, this implies that you have rakes of coaching stock somewhere that are not in use or maintenance (since the locomotives are the very maintenance intensive thing)..... since the marginal cost of running more trains with existing equipment is almost zero you should be using said equipment.
RAGNARØKR;1279791 said:
They are not constantly shunting stock to add things on and take them off. Swedish loco-hauled trains are a mixture of vehicles, 1960s to late 1980s, some from abroad. The capital cost of this stuff is next to nothing and that can be passed on to the passengers. New trains are additional to, not replacements for things that have got years of useful life in them. The locos are 1970s too, so that is a similar story.
What you gain with locomotives and hauled stock is long-term flexibility.
I don't know how you work out that the capital cost of locomotive hauled stock is "next to nothing".... the expensive parts of the train have to be purchased either way.
RAGNARØKR;1279791 said:
Or even leave surplus vehicles in terminus platforms, southern style. A long walk up the platform to the bit of the platform that is not occupied by parked vehicles!
This would require internal cabs in the formations, which people often cite as a disadvantage of multiple units compared to loco hauled formations. Otherwise how will you get the DVT out from in front of the detached coaches without expensive additional trackwork?
RAGNARØKR;1279791 said:
Acceleration is not important for a service where stations are 60 miles apart. It starts to count when stations are fifteen miles an hour or less. Otherwise it is a matter of getting the train up to speed and keeping it rolling. Especially if one is sensible and runs at 159kph. That keeps costs down very nicely.
So you want to take the UK back to the pre HST era?
Running at under a hundred miles an hour is not going to improve the patronage of the service, infact it is likely to completely destroy it.
You will make driving faster than the train again, especially once you destroy the acceleration of the trains and cost even more time than the low speed limit suggests.
RAGNARØKR;1279791 said:
That is not how it works, has worked and would work. The smart thing is to use older stock for peak lopping in diagram constructed to suit. On electrified routes it used to mean old EMUs only they all got scrapped. Then a further shortage was created by scrapping the mark 2 fleet. At £2.7 million a vehicle it is not economic to order enough carriages to satisfy peak demand. The Voyagers were about £1.5 million at least and that was ten years ago. That is why there is a shortage. That is why old stock needs to be kept if peak traffic is not to be either priced off or subject to overcrowding.
Why are you proposing to run intercity trains at 100mph and then using the price for multiple unit stock built to run at 125/140mph? That is very disengenuous, for 100mph running the price is roughly ~£1.5m, since the obvious choice for 100mph running is some form of Turbostar or simple EMU.
RAGNARØKR;1279791 said:
And old stock can only mix easily with new if the whole train is loco-hauled.
Fifty years of experience on British Rail says the opposite. Almost all SR units from the first Mark 1 derived stock to the 5WES used standard multiple working equipment.
I am sure I have seen a picture somewhere of a BIG or CIG in formation with a WES.
All Sprinter/Pacer type units can work together as well (these constituting the bulk of the pre privatisation diesel multiple unit fleet).
The breaks in this scheme in the post Mark 1 era arae largely a result of the transition to more modern traction packages and finally to the era of the auto coupler, both of which obviously improved the performance of the railway (I have heard my father talking of trains being delayed for 15 minutes because the platform used for splitting a train was changed at the last minute and the jumpers ended up on the wrong side, neccesitating a third rail isolation and track blocking to get to them).
So no, if you design your trains appropriately, especially in the era of computerised 'adaptors' for control signals being available, there is no particular reason you could not make all multiple units able to work with each other and with a wide range of earlier types. However in the post privatisation era there is no reason to do so.