Am confused by the idea of electrifying the Newquay branch but not the B&H?
What do you gain by wiring between Newbury and Taunton?
Most of the services are either through to Cornwall which could be diverted by Bristol or already pencilled in for bi-mode stock.
Extending to Newquay and Penzance from Plymouth allows you to convert the entire XC fleet used in the South West to electric operation without surrendering the excursion trains to Newquay or the regular extensions to Penzance.
Additionally the line speeds on the Newquay branch would make it suitable for trolley wire type equipment that would be rather cheaper than the equipment necessary on the Berks and Hants.
And the line goes within a few hundred yards of a multiple 400kV circuit substation at Quintrell Downs.
--- old post above --- --- new post below ---
Well done to those who realise that flying from Bristol to Taunton at 125mph + and relying on those speeds to keep the journey time down will run into all sorts of problems the moment there's any delay and a Weston or Taunton stopper goes out in front. Unless you spend a lot more than the cost of wiring Newbury to Taunton on a load of station and loop rebuilds...
Well the station at Weston is already on a loop..... as to the stoppers getting in the way, if the stopping trains were fast accelerating EMUs (shortened Cl395s) this problem could reduced markedly, and loop platforms will be useful from a capacity increase standpoint as well.
EDIT:
I make it five stations as the first two out of Bristol are so close to TM that the train is unlikely to have even obtained 140mph by the time it passes them even assuming it could simply accelerate straight to full speed.
And Bedminster already has three platforms and a carriage siding on a platform face available.
Could easily close of the two platforms on the mains and use the remaining two for stoppers.
And if these stations in question are infeasible to rebuild, there is also rope style "PEDs" used at that station in South Korea where the ropes lift out of the way to allow access to the train and then drop down again.
Since the posts supporting them are negligibly wide compared to the span you don't have to worry about doors being occluded.
And 125mph is probably good enough come to think of it....
EDIT #2:
DfT Claims that the IEP will reduce London-Bristol travel times by 22 minutes, which would reduce the typical travel time to somewhere in the vicinity of 80 minutes.
Even with
no improvements between Bristol and Taunton, this means that we are looking at 112 minutes for London-Taunton via Bristol, which is something like 1hr 52.
Typical journey times to Taunton now are something on order of 1hr 43.
So with £200m (since this would spend absolutely no money on Bristol-Taunton as electrification would be covered by XC, atleast as far as Plymouth), can you squeeze out ten minutes on Bristol-Plymouth journey times?
I think the answer is yes.