It’s not a shame at all.
The battery range that would have been possible with the space on them under frames would have not been suitable for any operators wanting it.
It is a shame as it may have opened up more possibilities for the 350/2s as they're an underrated train in my opinion(i'm ready for people to instantly disagree with that due to the 3+2 seating). These would be a MASSIVE upgrade over the 769s up north, but i'll leave it there so we don't get too off-topic.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

RUK

Member
Joined
5 Aug 2009
Messages
475
Location
East of England
It’s not a shame at all.
The battery range that would have been possible with the space on them under frames would have not been suitable for any operators wanting it.
If the whole length of the train isn’t needed for passengers, then perhaps batteries could be put above the solebar, like how Alstom and Eversholt’s plan for the Breeze hydrogen conversions had space for hydrogen storage taking up half the carriage behind each cab?
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,786
Location
Somewhere, not in London
So with the short platforms we have in Northern Land you’d like to take some of that up with battery storage above solebar…?

Even without considering fire regs that seems questionable at best.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,554
Location
"Marston Vale mafia"
Even without considering fire regs that seems questionable at best.

Fire regs? You don't think having a massive fire under the passenger compartment is more of a risk than having one at one end of it, with a suitable fire barrier, which would just burn upwards away from the passengers?

I'm not saying it's a good plan for lots of reasons, but this objection is a bit odd.
 

InTheEastMids

Established Member
Joined
31 Jan 2016
Messages
1,395
If the whole length of the train isn’t needed for passengers, then perhaps batteries could be put above the solebar, like how Alstom and Eversholt’s plan for the Breeze hydrogen conversions had space for hydrogen storage taking up half the carriage behind each cab?

Fire regs? You don't think having a massive fire under the passenger compartment is more of a risk than having one at one end of it
I'm a bit sceptical that putting a battery above the solebar would be a go-er. I would be asking my engineer
- how costly will it be to convert part of the carriage into what is essentially a fireproof battery container (i.e. do we need to weld in new sold steel bulkheads?
- how worried should I be about how having battery, ancillaries and firewalls at one end of the carriage could impact centre of gravity, weight distribution, vehicle dynamics etc.

All possible, I'm sure, but would it be cost-effective, especially if the train now carries fewer passengers and so in some sense is less valuable?

I did wonder if there might be some chicken-and-egg on battery conversions generally - i.e. no train operator is willing to accept the risk of another 769 debacle, but no RoSCo is prepared to do the work without an order.
 

Bedwyn32

Member
Joined
19 Aug 2017
Messages
38
Sorry if this has been asked before but how easy would it be to turn the 350's 3rd rail ready and send the to someone like SWR.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,282
Sorry if this has been asked before but how easy would it be to turn the 350's 3rd rail ready and send the to someone like SWR.
If a 350/2 was built to the exact same drawings as a 350/1 it ought to be a case of adding relatively few simple extra parts and wiring. All modern EMUs include a DC link electrical stage between the 25 kV transformer and the 3 phase drive, it would be odd to redesign the hardware to remove the capability to feed DC in.

I’d suspect the slight difficulty is in the bogie fittings for the shoe gear, the amount of work there would depends very much on whether they retained the necessary mounting positions. If Siemens treat all the combined total of 350/450/444 bogies as a common pool for major maintenance, it may be they are already compatible, but I don’t know either way.

In theory it should be at the lower end of a complexity scale, and it certainly doesn’t require ‘retractioning’ as someone asked in a recently closed 350 thread.
 
Last edited:

adc82140

Established Member
Joined
10 May 2008
Messages
3,408
The easiest (technically) solution would be to send the 350/2s back to WMR, and release the 350/1s to 3rd rail territory.

But I'm aware that there are 1001 reasons why this won't happen, including the significant issue of the sub classes belonging to different Roscos.
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,354
Location
Yorkshire
Batteries don’t need to be platformed….
At least one of the cabs usually do though, and if the batteries are behind the cabs then at least one of the battery spaces will be at a platform. Though I do think the aversion some users on this site have to anything "occupying space that could be used for passengers" is a bit overblown. It's understandable to an extent if we're talking about loco-haulage, but I've even seen grumbles about the traction "pod" on the Stadler Flirts being "a waste of space"!
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,156
Location
West Wiltshire
Would these be suitable as a potential use for Southeastern?
350/2's didn't have the 3rd rail shoe gear fitted. That was only the /1's
Sorry if this has been asked before but how easy would it be to turn the 350's 3rd rail ready and send the to someone like SWR.
The 350 and 450 were the same basic design, and it is more a case of which modules were fitted to each batch.

Originally Angel trains ordered 25 units, first 3 were fitted for dual voltage and used for testing, 7-25 became part of SWT order as paper transfer, with rest of SWT order new. Units 4-6 were moved to after SWT order, and I think the 25 sets of transformers and pantographs ended up on some 360 or 350.

It would not surprise me if some of the bogies, body shells and components ordered for each ended up on different units as there was a time when batches from factory were almost overlapping. The 350/2 might have been built later, but they were effectively built with same components that had already been used in various 350, 450, 360.

It is more a case of buy more of the third rail parts, or take them from dual voltage units that are nowadays used as 25kv only. So yes can be converted, even reconfigured, and/or refurbished providing funding is found
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,347
Originally Angel trains ordered 25 units, first 3 were fitted for dual voltage and used for testing, 7-25 became part of SWT order as paper transfer, with rest of SWT order new. Units 4-6 were moved to after SWT order, and I think the 25 sets of transformers and pantographs ended up on some 360 or 350.
Isn't that the 360 fleet that you are referring to? 25 units ordered, 21 became the Great Eastern 360/1s, the remaining four became the Heathrow 360/2s. Later, the 360/2 fleet got nine more vehicles.

The original SWT order was for 785 vehicles - 100 4-car 450s, 45 5-car 444s and 32 5-car 450s. The 32 5-car 450s became 10 4-car 450s and 30 4-car 350/1s.

Maybe the bit I am not appreciating is that the original Angel Trains order actually became part of the South West Trains 450 build and the Great Eastern 360s were new build.
 
Last edited:

Russel

Established Member
Joined
30 Jun 2022
Messages
5,514
Location
Lichfield
At least one of the cabs usually do though, and if the batteries are behind the cabs then at least one of the battery spaces will be at a platform. Though I do think the aversion some users on this site have to anything "occupying space that could be used for passengers" is a bit overblown. It's understandable to an extent if we're talking about loco-haulage, but I've even seen grumbles about the traction "pod" on the Stadler Flirts being "a waste of space"!

I think said users are still living in an age where 15 coach loco hauled trains are still common.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,156
Location
West Wiltshire
The original SWT order was for 785 vehicles - 100 4-car 450s, 45 5-car 444s and 32 5-car 450s. The 32 5-car 450s became 10 4-car 450s and 30 4-car 350/1s.
As ordered, the 785 vehicles was 709 new and 76 (19 x 4car) transferred from then in production 100 vehicle speculative Angel order. SWT even included already in production in their press release when order was announced.

But the significance to the 350/2 thread is that what is fitted is modular, and can swap bits between 350, 450 (and some parts of 444, 360), so of course you can (if funds are available for the parts) make them third rail compatible.

The 350/2 are 16-17 years old, probably got another 20 years life, so not unreasonable for battery modules to be added and/or a mid life refurbishment. Spread the cost over 15-20 years planned further life and an operator struggling to get a business case for brand new stock (that might take 3-5 years to be in service) might go with it.
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,786
Location
Somewhere, not in London
As ordered, the 785 vehicles was 709 new and 76 (19 x 4car) transferred from then in production 100 vehicle speculative Angel order. SWT even included already in production in their press release when order was announced.

But the significance to the 350/2 thread is that what is fitted is modular, and can swap bits between 350, 450 (and some parts of 444, 360), so of course you can (if funds are available for the parts) make them third rail compatible.

The 350/2 are 16-17 years old, probably got another 20 years life, so not unreasonable for battery modules to be added and/or a mid life refurbishment. Spread the cost over 15-20 years planned further life and an operator struggling to get a business case for brand new stock (that might take 3-5 years to be in service) might go with it.
It's been discussed many a time.

The underframe layout of the Class 350/2 does not lend itself well to adding batteries so the amount one would be able to fit would be highly unlikely to meet the requirements of an operator in the real world.
Combine this with how Flex has reduced the appetite of UK ROSCOs for doing conversions, and it is just highly unlikely to ever happen.

To gain some context without getting into the world of looking at drawings, have a look at the side view of a 350/1 and how many equipment cases are on the underframe. There's realistically only the TCOL(W) (+400) car available for anything on the underframe, on a 20m carriage, less the "HV" control box for the heaters. There isn't that much one can fit in that kind of space in the way of batteries.
 

Norm_D_Ploom

Member
Joined
29 Nov 2019
Messages
242
Location
Halifax
I haven't read all 49 pages so apologies if previously asked but could they replace 319 in Northern?
What about in Scotland, any use?
Or to form new services Donny all stops to Edinburgh does that work?
Could they supplement Brum / Cov to Manc to minimise diesel under wire?
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,347
I haven't read all 49 pages so apologies if previously asked but could they replace 319 in Northern?
The 319s that ran with Northern have already been replaced. They can't replace 769s.

Or to form new services Donny all stops to Edinburgh does that work?
No, they would get in the way. Think of an all stops service over that corridor as a rolling roadblock getting in the way of faster services.
 

Chester1

Established Member
Joined
25 Aug 2014
Messages
4,441
I haven't read all 49 pages so apologies if previously asked but could they replace 319 in Northern?
What about in Scotland, any use?
Or to form new services Donny all stops to Edinburgh does that work?
Could they supplement Brum / Cov to Manc to minimise diesel under wire?

There has been considerable discussion about them replacing 323s. Its not a mad plan when your consider the latters age and the ability to shuffle round stock to avoid reduction in capacity because they wouldn't be doubled up. Its not seem to got past early stages within DfT, the owner and Northern. Brum to Manchester is popular with enthusiasts (myself included) but its never been discussed seriously within the industry, at least not publically.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,156
Location
West Wiltshire
There has been considerable discussion about them replacing 323s. Its not a mad plan when your consider the latters age and the ability to shuffle round stock to avoid reduction in capacity because they wouldn't be doubled up. Its not seem to got past early stages within DfT, the owner and Northern. Brum to Manchester is popular with enthusiasts (myself included) but its never been discussed seriously within the industry, at least not publically.
There is a sort of paralysis between DfT, Treasury, GBR and some Operators, where it appears nothing is likely to be ordered until 2026 or 2027. Many reckon it will take at least 3 years for any order to enter service (and nearer 5 years min if a new design that needs testing and certifying).

Clearly that means no new trains until at least 2029, maybe 2030 or even 2031.

Now if factor in passenger growth (and recent ORR quarterly figures show operators growing passenger numbers increasing by between 2% and 15% in a year). Or if you compare to 2019 then shows some operators are at 110-120%, whilst others are only around 85-90%. Now clearly if one projects average annual increase of 6% over next 5 years (until earliest new trains will arrive), then clearly unless most operators have vast amounts of slack they are going to need to bring back trains from storage.

Southern lost all its suburban 455s without replacement, South Eastern lost networkers (but did get 707s, although rather less than they lost). Northern has an old fleet too. So the question is who runs out of capacity first and manages to convince DfT that its fleet needs to grow.

From a PR point of view (and it might be date when media are focused) 4th December is when ORR have said they will publish both Regional Rail Usage and Annual station usage reports. It isn't going to look good if DfT ministers sit there are say we know about big growth locally, but decided passengers don't matter and not doing anything about more rolling stock, as they say watch this space.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,187
Southern lost all its suburban 455s without replacement, South Eastern lost networkers (but did get 707s, although rather less than they lost). Northern has an old fleet too. So the question is who runs out of capacity first and manages to convince DfT that its fleet needs to grow.
Northern’s tender exercise for new rolling stock is already ongoing…
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,156
Location
West Wiltshire
And will be ongoing until a lot of those currently working with Northern retire...(!)
Yes it is rather at Glacial pace.

This was the Invitation to tender 26 months ago

By January 2025 formally asked 5 companies,

..... now looking like Spring 2026 before any decision, then probably few more years to actually build anything. Even the 323s will be nearer 40 years old than 30 by then.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,514
Location
Lichfield
Yes it is rather at Glacial pace.

This was the Invitation to tender 26 months ago

By January 2025 formally asked 5 companies,

..... now looking like Spring 2026 before any decision, then probably few more years to actually build anything. Even the 323s will be nearer 40 years old than 30 by then.

At this rate, if they did get the 350s as a stop gap, I'm not sure it could be described as "short-term".
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,347
As i suggested for Southern.. they could go to GWR/Heathrow Express with the 387s coming to Southern (or Southeastern)....
If using 350s at GWR meant there was displacement of units and a way of fitting batteries to existing electrostars to remove the Southern diesel stock was found then there might be some sense in sourcing the units needed to backfill that release. Otherwise, not so convinced.

Just noting that there needs to a really good reason to saddle the GWR operation with a different fleet of trains and all the training / upheaval that causes.
 
Last edited:
Status
Not open for further replies.

Top