Merle Haggard
Established Member
Thanks, interesting.
It does beg the question (if my 'mole' is correct) - why the 350/2 s were not section 54 - ed? (and presumably the 350/1, /3 and /4s were)
AFAIK post 197 (by @Merle Haggard ) is correct about the low lease but high usage charges. Leaving 350/2s on London - MK / Tring, decoupling after peak times, having WMR 730s on a Birmingham - Crewe/Liverpool, and 350/1,3,4 on London - Birmingham/Crewe all day would make the most sense to me.of course, WMR opted to replace only the 350/2s, but keep the other 350s, which suggests there was something about the /2s that made them unattractive, and the lease costs being higher than that of the new fleet is an obvious one.
Section 54 are sparingly used for when ROSCOs are unwilling without more guarantee they asset will continue to be used after the franchise.Thanks, interesting.
It does beg the question (if my 'mole' is correct) - why the 350/2 s were not section 54 - ed? (and presumably the 350/1, /3 and /4s were)
Scotland seem to use them more - as well as the HSTs aren't the 380s and 385s also covered by Section 54s?Most of them are early franchises when the leasing market wasn’t as developed, a recent one was the Scotrail HSTs as they needed a lot of work doing.
Has that changed? It certainly wasn't the original plan.The LNWR 730s will have 2+2 seating.
The original plan was for 29 730/1s with 3+2 seating and 16 730/2s with 2+2 seating. That has been changed to 36 730/2s. There will not be any 730/1s, and no 730s with 3+2 seating.Has that changed? It certainly wasn't the original plan.
TY. I'd missed that. Appreciated.The original plan was for 29 730/1s with 3+2 seating and 16 730/2s with 2+2 seating. That has been changed to 36 730/2s. There will not be any 730/1s, and no 730s with 3+2 seating.
There will only be 36 5 car 730s insted of 45. The order for the 3 car 730s was increased from 36 to 48.TY. I'd missed that. Appreciated.
I'm assuming that the other 9 are destined for EW rail or have they been cancelled?
Ok. TY. Let me guess, cost neutral.There will only be 36 5 car 730s insted of 45. The order for the 3 car 730s was increased from 36 to 48.
That works out as 9 less coaches overall, but 6 more coaches with driving cabs.
Originally London - Crewe would have been purely 730s, LNWR would have excess 350s so some were planned to work WMR services. The 730 order rebalance means WMR electric services are all 730s, and LNWR doesn't need to share 350s.There will only be 36 5 car 730s insted of 45. The order for the 3 car 730s was increased from 36 to 48.
That works out as 9 less coaches overall, but 6 more coaches with driving cabs.
Sounds sensible.Originally London - Crewe would have been purely 730s, LNWR would have excess 350s so some were planned to work WMR services. The 730 order rebalance means WMR electric services are all 730s, and LNWR doesn't need to share 350s.
Will London - Crewe and Birmingham - Liverpool be worked by both 350s and 730s?Originally London - Crewe would have been purely 730s, LNWR would have excess 350s so some were planned to work WMR services. The 730 order rebalance means WMR electric services are all 730s, and LNWR doesn't need to share 350s.
If we're using crayons for the 350/2 fleet I'd have refurbished them to include 2+2 seating, tables and get them over to EMR to replace the 360s. Ticketless travel will decrease and there might be more chance in 12 car running
Ideally OHLE would be extended to Bedwyn (and beyond in time) to allow an all electric service to run from London, while IETs utilise electric for longer.I'd fit them.with batteries and 3rd rail shoes and give some to GWR to use on the Reading to Gatwick Airport route that all going to plan.ahould free up a few class 165/166's maybe even the Reading to Newbury service to extend it to Bedwyn as long as. There's enough range on the batteries ti do so and paths allow
They're not metro trains though. Especially with their really slow doors!There may be a glaring reason why this might not be feasible. I had seen a suggestion that they could be converted to 3rd rail and transferred to SWR, but they risk having too many trains once the 701s are finally in service.
So, maybe they could still be converted to 3rd rail and replace 465/66s on South Eastern?
This isn't a bad idea IF Reading to Gatwick was transferred to SWR (and maybe also Reading to Basingstoke). I don't think Porterbrook would necessarily be inclined to work with GWR on a conversion project of this style again, given the 769 fiasco.I'd fit them.with batteries and 3rd rail shoes and give some to GWR to use on the Reading to Gatwick Airport route that all going to plan.ahould free up a few class 165/166's maybe even the Reading to Newbury service to extend it to Bedwyn as long as. There's enough range on the batteries ti do so and paths allow
The 769/9 fiasco was very much exacerbated by the requirements of GWR to have all of the modern features available on what is a 1980s unit, the depth of "Nothing to do with traction" mods done is frankly ridiculous, then take into account the minimum cost bids to design and install this equipment and it's easy to see how it ended up being a complete farce./This isn't a bad idea IF Reading to Gatwick was transferred to SWR (and maybe also Reading to Basingstoke). I don't think Porterbrook would necessarily be inclined to work with GWR on a conversion project of this style again, given the 769 fiasco.
It would make a lot of sense if Reading to Gatwick was SWR anyway, as there would be a single operator using the lines east out of Reading towards Wokingham, and SWR already operate some Sunday services from Reading to Basingstoke.
Definitely, but frankly the routes I mentioned would work better with SWR anyway (if you were able to fit shoes for the 3rd rail sections and have them as 3rd rail/OHLE/battery tri modes).The 769/9 fiasco was very much exacerbated by the requirements of GWR to have all of the modern features available on what is a 1980s unit, the depth of "Nothing to do with traction" mods done is frankly ridiculous, then take into account the minimum cost bids to design and install this equipment and it's easy to see how it ended up being a complete farce.
If the 350/2s were to be "FLEX'd" then it would likely go much better if it where contracted to Siemens and/or did not try and lump in a mountain of interior mods from low cost companies installed by GRS.
In what way? SWR don't have a traincrew depot at Reading and a relatively limited number of sidings at Guildford. The pattern of services makes sense to have the earliest services start at Reading and latest services end there.Definitely, but frankly the routes I mentioned would work better with SWR anyway (if you were able to fit shoes for the 3rd rail sections and have them as 3rd rail/OHLE/battery tri modes).
Surely staff could be TUPE'd across?SWR don't have a traincrew depot
This is only relevant with the Reading to Gatwick services, and in any case, units could be stabled in the platforms at Reading, no?a relatively limited number of sidings at Guildford
That seems to be going a long way into speculative territory, particularly as they would also have to be set up for third rail. Would Porterbrook actually make the investment in the 350/2s in a relatively limited battery range on the basis of one route? It would make a lot more sense to go to Angel Trains and see if they will put that battery capacity under a small fleet of SWR's 450s.So, without going too far into speculative territory, said batteries would fit in the undercroft of a 4 car 350/2?
Perhaps, but the 450s might be needed for other services. Maybe the initial batch could be converted from 450s and trial it that way.It would make a lot more sense to go to Angel Trains and see if they will put that battery capacity under a small fleet of SWR's 450s.
Are you suggesting that a different ROSCO would have better odds of leasing the 350/2s instead of Porterbrook?Tis a shame, as you'd assume there'd be a deal somewhere for one leasing company to refurb the 350/2s and sell them to the other firm. Fix the simple things like toilets and there's another 20 years left in those sets.
Seems to be a long standing dislike/ spat / war between the operator and them, so yes.From the LNWR Class 350/2 withdrawals thread…
Are you suggesting that a different ROSCO would have better odds of leasing the 350/2s instead of Porterbrook?
Notwithstanding the fact that the 172 /2 and /3 subclasses are owned by Porterbrook and did not get replaced by additional Class 196s.Seems to be a long standing dislike/ spat / war between the operator and them, so yes.
All goes down to the original deal done, the price in the 172 contact was probably far better value than the legacy 350 one originally done 15 years ago. It's a pretty fair guess that the operator TUK (was abellio) tried over the years to renegotiate the price and reached the point of frustration with Porterloo.Notwithstanding the fact that the 172 /2 and /3 subclasses are owned by Porterbrook and did not get replaced by additional Class 196s.
I suspect the off-leasing of the 350/2s is, in part, a bi-product of the 323s replacement. Porterbrook was determined to transfer the Northern 323s to West Mids. Obviously this never happened.